Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206P689 + (ML20206P689)
- 05000251/LER-1986-013-01, :on 860722 & 24,while Performing Maint on Safeguard Relays,Phase a Containment Isolation Actuated. Caused by Inadvertent Relay Actuation.Actuation Signal Reset & Valves Reopened + (ML20206P690)
- HL-5712, Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review + (ML20206P691)
- ML20206P692 + (ML20206P692)
- 05000295/LER-1985-019, :on 850607,during Investigation of Noise Problem,Fuses Pulled & Replaced Causing Reactor Trip & Unexpected Closure of Msiv.Caused by Personnel Error. Summator 1PM505B Replaced + (ML20206P693)
- 05000255/LER-1986-023, :on 860724,design Problem Discovered Re Actuating Mechanism for Equalizing Valves on Containment Bldg Escape Airlock.Caused by Error in Actuating Cams Design.Cams Modified + (ML20206P694)
- ML20206P697 + (ML20206P697)
- ML20206P698 + (ML20206P698)
- ML20206P699 + (ML20206P699)
- ML20206P701 + (ML20206P701)
- ML20206P702 + (ML20206P702)
- ML20206P703 + (ML20206P703)
- ML20206P704 + (ML20206P704)
- 05000219/LER-1998-016, :on 981028,single DG Start,Occurred.Caused by Loss of One Source of Offsite Power.Generator Relay Surveillance Revised to Eliminate Possibility of Inadvertent Procedural Breaker Trips.With + (ML20206P707)
- ML20206P708 + (ML20206P708)
- 05000482/LER-1999-004, :on 990412,personnel Discovered That Direct Flow Path Had Been Created Between Containment Bldg Atmosphere & Auxiliary Bldg During Fuel Movement.Caused by Series of Personnel Errors.Operations Mgt Assigned + (ML20206P709)
- 3F0199-02, Submits Change in Analysis of Record for SBLOCA & 10CFR50.46 Notification.Attachment to Ltr Includes Description of How Limitations & Conditions Outlined in RELAP5 SER Are Addressed + (ML20206P710)
- PNO-III-87-054, on 870409,unit Manually Shut Down & Scrammed Following Vacuum Problem in Main Condenser & Increasing Temp in Hotwell.Caused by Partially Dislodged Ceiling Embedment Plate Supporting Portion of Lpci.Plate Repaired + (ML20206P712)
- ML20206P713 + (ML20206P713)
- ML20206P714 + (ML20206P714)
- ML20206P715 + (ML20206P715)
- ML20206P716 + (ML20206P716)
- ML20206P717 + (ML20206P717)
- ML20206P720 + (ML20206P720)
- ML20206P721 + (ML20206P721)
- NG-99-0678, Application for Amend to License DPR-49,revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array + (ML20206P723)
- PNO-III-87-055, on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs + (ML20206P725)
- ML20206P726 + (ML20206P726)
- 05000382/LER-1998-021, :on 981210,boron Concentration Below TS Limit in SIT 2B,occurred.Caused by Lack of Complete Understanding of Cumulative Effects of Sys Design.B Concentration in SIT 2B Was Returned to within TS Required Concentrations + (ML20206P727)
- ML20206P728 + (ML20206P728)
- ML20206P729 + (ML20206P729)
- ML20206P732 + (ML20206P732)
- ML20206P733 + (ML20206P733)
- ML20206P734 + (ML20206P734)
- ML20206P738 + (ML20206P738)
- ML20206P739 + (ML20206P739)
- ML20206P740 + (ML20206P740)
- ML20206P741 + (ML20206P741)
- ML20206P742 + (ML20206P742)
- ML20206P743 + (ML20206P743)
- ML20206P745 + (ML20206P745)
- ML20206P747 + (ML20206P747)
- ML20206P753 + (ML20206P753)
- ML20206P755 + (ML20206P755)
- L-99-004, Submits Request for 60 Day Implementation Period for LARs 258 & 129.Proposed Amends Submitted by ltr,L-98-241,on 981224 Re EDG Parameters & Usable Fuel Oil Requirements of Tech Specs 3.8.1.1 & 3.8.1.2 + (ML20206P757)
- ML20206P758 + (ML20206P758)
- 05000269/LER-1998-018, :on 981209,identified Potential for Loss of Essential Siphon Vacuum Sys.Caused by Design Oversight. Procedure Revised.With + (ML20206P760)
- ML20206P761 + (ML20206P761)
- ML20206P763 + (ML20206P763)
- ML20206P767 + (ML20206P767)
- ML20206P768 + (ML20206P768)