Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000302/LER-1998-012, :on 981109,delay in Performance of Improved TSs Required Actions Was Noted.Caused by Personnel Error. Discussed Lessons Learned,Addl Training & Developed Improved Method of Tracking LCO Entries.With + (ML20206N277)
- 05000482/LER-1986-041, :on 860723,control Room Ventilation Isolation Signal (Crvis) Occurred.Caused by Short Supply of Tape in Chlorine Monitor.Design Change to Minimize Potential Spurious Crvis Currently Being Considered + (ML20206N278)
- ML20206N279 + (ML20206N279)
- 05000423/LER-1986-040, :on 860721,Train B Control Bldg Isolation Signals Generated Due to Failures of Control Bldg Inlet Ventilation Chlorine Detectors.Caused by Presence of Contaminants on Probes.Detectors Relocated + (ML20206N280)
- 05000306/LER-1998-005-02, :on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With + (ML20206N281)
- ML20206N282 + (ML20206N282)
- IR 05000498/1986012 + (ML20206N284)
- ML20206N286 + (ML20206N286)
- ML20206N287 + (ML20206N287)
- ML20206N290 + (ML20206N290)
- ML20206N292 + (ML20206N292)
- ML20206N293 + (ML20206N293)
- 05000266/LER-1998-028, :on 981113,surveillances Required by Section XI Pressure Test Program Were Missed.Caused by Failure to Take Timely Action on & Implement Corrective Actions for ASME Program Problems.Completed 40 Month Pressure Test + (ML20206N296)
- ML20206N297 + (ML20206N297)
- IR 05000456/1986027 + (ML20206N299)
- ML20206N300 + (ML20206N300)
- ML20206N302 + (ML20206N302)
- ML20206N303 + (ML20206N303)
- ML20206N304 + (ML20206N304)
- ML20206N305 + (ML20206N305)
- NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With + (ML20206N306)
- 05000206/LER-1986-002-02, :on 860717,reactor Trip Occurred During Transfer of 120-volt Ac Vital Bus 4 Power Supply.Caused by Inadequate Procedures for Vital Bus Operation.Procedures Revised + (ML20206N307)
- ML20206N311 + (ML20206N311)
- 05000416/LER-1986-025, :on 860725,breaker Inadvertently Bumped Open While Performing Mod Work Activities Resulting in Loss of Power in Certain Div 1 Isolation Valves.Caused by Personnel Error.Procedures Revised + (ML20206N312)
- ML20206N313 + (ML20206N313)
- ML20206N315 + (ML20206N315)
- ML20206N316 + (ML20206N316)
- ML20206N318 + (ML20206N318)
- ML20206N321 + (ML20206N321)
- ML20206N322 + (ML20206N322)
- HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With + (ML20206N323)
- ML20206N324 + (ML20206N324)
- ML20206N327 + (ML20206N327)
- IR 05000440/1986018 + (ML20206N328)
- ML20206N329 + (ML20206N329)
- ML20206N330 + (ML20206N330)
- ML20206N332 + (ML20206N332)
- ML20206N333 + (ML20206N333)
- ML20206N336 + (ML20206N336)
- ML20206N338 + (ML20206N338)
- ML20206N340 + (ML20206N340)
- ML20206N341 + (ML20206N341)
- ML20206N344 + (ML20206N344)
- ML20206N345 + (ML20206N345)
- ML20206N347 + (ML20206N347)
- ML20206N349 + (ML20206N349)
- ML20206N350 + (ML20206N350)
- ML20206N351 + (ML20206N351)
- ML20206N356 + (ML20206N356)
- ML20206N357 + (ML20206N357)
- RBG-24215, Special Rept:On 860714,invalid Failure Experienced on Div III Diesel Generator.Caused by Diesel Generator Being Started on Only One Bank of Air Starters & Field Flash Time Delay Relay Set at 5.3 Instead of 5 + (ML20206N358)