Final Response to FOIA Request for Documents Re Insp Repts 50-445/86-04,50-446/86-03,50-445/86-03 & 50-446/86-04. Forwards App D Documents
ML20206N349
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/24/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20206N354 List:
References
FOIA-86-270, FOIA-86-A-87 NUDOCS 8607010442
Download: ML20206N349 (3)


See also: IR 05000445/1986004

Text

r

'

TBGL-ci,6

pMi% _

c 9'o

. g UNITED STATES

[ g ,

NUCLEAR REGULATORY COMMISSION

$ j iVASHINGTON, D. C. 20655

%..... JUN 2 41%6

Ms. Billie Pirner Garde, Director

Government Accountability Project

Environmental Whistleblower Clinic IN RESPONSE REFER

1555 Connecticut Avenue, NW, Suite 202 TO F01A-86-270 AND

Washington, DC 20036 F01A-86-A-87

Dear Ms. Garde:

This is the fir.al response to your letter dated April 9,1986, in which you

requested, pursuant to the Freedom of Information Act (F0IA), the release of

documents regarding Inspection Reports 50-445/6 and 86-04/86-03 dated March 27,

1986.

Copies of the documents listed on the enclosed Appendix D are being placed in

,

the NRC Public Document Room (PDR), located at 1717 H Street, NW, Washington,

DC. The documents will be filed in PDR folder F01A-86-270 in your name.

This completes action on your request. Also, in light of our responses of

May 21, 1986, May 29, 1986, and this date, no further action will be taken on

your letter of May 15, 1986, appealing our lack of response to this FOIA

request.

Sincerely,

/bruk Y/ d 9

Donnie H. Grimsley, Director

Division of Rules and Records

Office of Administration

Enclosure: As stated

g70 2 860624

QARDE86-A-87 PDR .

r

f

- - -

-

FOIA;86-270

. .

^ 7pendix 0

1.- 4/20/79 Letter, ii.R. Rock, Gibbs & liill, to, J. T. Merritt, "- -

,TUCCo, CTN-36070, C&ll Project No. 2323, Vendor Letter

' No . DTF-76, Date 3-16-79, P.O. No. CP-0460 (2 pgs)

Attached,

2 CTN 36070, CPSES Equipment Qualification Certification '

Sheet, Documentation Review Forms, Spec No. 2323-ES-12 .

(8 pgs)

.

3. 3/25/80 Brown & Root CPSES Job 35-1195, Procedure no. CP-CPM 6.1

Rev. 3 (9 pgs) ,

4. 4/2/81 Brown & Root CPSES Job 35-1195, Procedure no. CPM-6.3 *

Rev. 8 (10 pgs)

5. 12/10/81 Construction Operation Traveler 35-1195, Electrical ~ -

Penetration Assemblies Installation, Safeguard Building

790'6" (5 pgs) -

6. 12/11/81 Electrical Penetration Assembly Leak Rate Test Report

Unit No. 1, EPA No. 1E78 (6 pgs)

. '

7. 12/12/81 Electrical Penetration Assembly Leak Rate Test Report

Unit No. 1 EPA No. 1E76 (6 pgs)

3A 12/23/81' Electrical Penetration Assembly Leak Rate Test Report

Unit No. 1, EPA No. 1E77 (6 pgs)

I

3. 7/26/82 Lbtter, Robert Hallard to J. T. Morritt, TUCCo.

C&ll Project No. 2323, Class lE Equipment Specification

Document Review (2 pgs)

Attached.

CPSES 1EEE 323-1974 Class IF. Equipment Qualification

Documentation Review Form (8 pgn)

,

-, ~

~ F01A 86-270 ,

~

~

~

Appendix D (cont.)

~

. .

O

10. 8/10/82 Letter, Robert E. Ballard, Jr. , Gibbs & Hill -Inc. , to

J. T. Merritt, TUCCo, C6H Project No.~2323, Vendor

Letter No. DTF-148 Date 6-28-82, P.O. No. CP-0460,

, Electrical Penetration Assemblies & Accessories (2 pgs)

Attached,

11. Engineering Release Nctice, Release No. 4123, Procedure

to rework L.V. module pigtail assy (6 pgs)

12. 10/4/82 Brown & Root. Inc., CPSES 35-1195 Engineering Instruction

Number EEI-22 Rev 0 (4 pgs)

13, 10/5/82 CPSES Environmental Qualification Certification Sheet

For Class IE Electrical Equipment, ES-12 (9 pgs)

Rev. I

14 4/14/83 CPSES Environmental Qualification Certification Sheet

For Class 1E Electrical Equipment, ES-12 (9 pgs)

Rev. 2 ,

- 15 4/9/84 TUCCo CPSES Instruction No. QI-QP-11.3-49, Rev 3,

Installation of Conax Feedthrough/ Adapter Module

[ Assemblies For Amphenol Sams Penetrations (4 pgs)

16. 5/10/84 TUCCo Procedure TNE-DC-15. Rev. 3, Preparation of

Equipment Qualification Documentation (16 pgs)

17. 2/11/86 TUCCo Procedure TNE-DC-15. Rev. 6, Preparation of

Equipment Qualification DocumentatJon (22 pgs)

.

.18. 12/22/7 Electrical Penetration Assembly Leak Rate Test Report

-  : cover sheet only (1 pg)

,

e

9

9

t

k

.--

-

/, . .

.

.s

GOVERNMENT ACCOUNTABILITY PROJECT

-

1555 Connecticut Avenue, N.W., Suite 202

Washington, D.C. 20036 (202)232-8550

. April 9, 1986 .

FJ @ M OF INFORMATION ACT REQUEST

-

FRE9)Otd OF lt#0RMAT10N

ACT REQUEST

O c of Administration

Nuclear Regulatory Commission

bS 7d

.

Washington, D.C. 20555 gNM

7 f

To Whom It May Concern:

Pursuant. to the Freedom of Information Act ("FOIA") , 5 USC

552, the Government Accountability Project (GAP) requests copies

of any and all agency records and information, including but not

, limited to notes, letters, memoranda, drafts, minutes, diaries,

logs, calendars, tapes', transcripts, summaries, interview -

. . .

reports, procedures, instructions, engineering analyses,

drawings, files, graphs, charts, maps, photographs, agreements,

handwritten notes, studies, data sheets, notebooks, books,

telephone messages, computations, voice recordings, computer

runoffs,. reports, and any and all other records or reports

relevant to and/or generated in connection with IER 50-445/6, 86-

04/86-03, March 27, 1986.

This request includes all agency records as defined in 10

..

',"

C.F.R. 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and

A.3 (approved October 8, 1980) whether they currently exist in

the NRC official, " working," investigative or other files, or at

any other location, including private residences.

If any records as defined in 10 C.F.R. 9.3a(b) and the NRC

manual, and covered by this request have been destroyed and/or

removed after this request, please provide all surrounding

records, including but not limited to a list of all records which

have been or are destroyed and/or removed, a description of the

action (s) taken relevant to, generated in connection with, and/or

issued in order to implement the action (s).

GAP requests that fees be waived, because " finding

the information can be considered as primarily benefitting the

general public," 5 USC section 552 (a) (4) (a) . GAP is a non-profit,

non-partisan public interest organization concarned with honest

and open government. Through public outreach, the Project

promotes whistleblowers as agents of government accountability.

Through its Environmental Whistleblower Clinic, GAP offers '

assistance to local public interest and citizens groups. seeking

to ensure the health and safety of their communities. The

Environmental Whistleblower Clinic is currently assisting several

citizens groups, local governments, and intervenors in Texas

g M '

.ggw,,. ,/h /Au-oi

. .

s

~

,..

g .

-.-.'.

. .

.

Director, Office of Administration

Page Two -

,

.

concerning the construction of the Comanche Peak nuclear power

plant.

We are requesting the above information as part of an

ongoing monitoring project on the adequacy of Region IV and the

NRC's efforts to protect public safety and health at nuclear

power plants.

For any documents or portions that you deny due to a

specific FOIA exemption, please provide an index itemizing and

derscribing the documents or portions of documents withheld. The

lindex should provide a detailed justification of your grounds

-

for claiming each exemption, explaining why each exemption is

relevant to the document or portion of the document withheld.- - -

This index is required under Vaughn v. Rosen (I), 484 F.2d."

section 820 (D.C. Cir. 1973) , cert. denied, 415 U.S. section 977

(1974).

.

We look forward to your response to this request within ten

working days.

Sincerely,

'

F

Billie Pirner Garde

Director, Environmental

Whistleblower Clinic

BPG:41909G