Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206G315 + (ML20206G315)
- ML20206G316 + (ML20206G316)
- ML20206G317 + (ML20206G317)
- ML20206G319 + (ML20206G319)
- ML20206G320 + (ML20206G320)
- ML20206G322 + (ML20206G322)
- ML20206G323 + (ML20206G323)
- ML20206G325 + (ML20206G325)
- ML20206G326 + (ML20206G326)
- L-99-076, Forwards 1998 Annual Environ Rept,Radiological & 1998 Annual Environ Rept,Non-Radiological, to Appropriate NRC Parties,Iaw TS 6.9.1.10 + (ML20206G328)
- 05000339/LER-1986-005-02, :on 860529,reactor Trip Occurred from Negative Flux Rate Trip Due to Opening of Stationary Coil Power Supply Disconnect Switch.Caused by Physical Agitation Due to Personnel Painting.Switches Secured Closed + (ML20206G329)
- ML20206G330 + (ML20206G330)
- 05000387/LER-1986-021, :on 860524,controlled Shutdown Initiated When All Emergency Svc Water (ESW) Sys Pumps Declared Inoperable. Caused by 860522 Failure of ESW Pump C Due to Severe Cavitation Damage.Pumps Repaired + (ML20206G333)
- ML20206G334 + (ML20206G334)
- ML20206G335 + (ML20206G335)
- 05000286/LER-1986-005-01, :on 860523,turbine Trip Occurred During Monthly Surveillance Test 3PT-M12.Caused by Failed Relay in Turbine Independent Electrical Overspeed Protection Sys (Ieops). Relay Replaced & Similar Ieops Relays Tested + (ML20206G336)
- ML20206G337 + (ML20206G337)
- ML20206G339 + (ML20206G339)
- IR 05000324/1987005 + (ML20206G341)
- ML20206G342 + (ML20206G342)
- ML20206G343 + (ML20206G343)
- ML20206G344 + (ML20206G344)
- ML20206G345 + (ML20206G345)
- ML20206G346 + (ML20206G346)
- 05000260/LER-1986-007-02, :on 860519,Div II Primary Containment Isolation Sys Power Fuse Blew,Causing Inadvertent Secondary Isolation & Initiation of Control Room Emergency Ventilation Sys. Caused by Fuse Failure.Fuse Replaced + (ML20206G347)
- ML20206G348 + (ML20206G348)
- ML20206G350 + (ML20206G350)
- ML20206G352 + (ML20206G352)
- ML20206G353 + (ML20206G353)
- ML20206G354 + (ML20206G354)
- ML20206G355 + (ML20206G355)
- ML20206G356 + (ML20206G356)
- ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr + (ML20206G357)
- ML20206G358 + (ML20206G358)
- ML20206G362 + (ML20206G362)
- ML20206G363 + (ML20206G363)
- ML20206G364 + (ML20206G364)
- ML20206G366 + (ML20206G366)
- ML20206G369 + (ML20206G369)
- ML20206G370 + (ML20206G370)
- ML20206G372 + (ML20206G372)
- ML20206G374 + (ML20206G374)
- ML20206G375 + (ML20206G375)
- ML20206G378 + (ML20206G378)
- ML20206G379 + (ML20206G379)
- ML20206G380 + (ML20206G380)
- PNO-II-99-014, on 990430,notified NRC That Licensee Received Shipment of Pd-103 Seeds & Shipment Package Was Discarded as Trash & Sent to Local Incinerator.State Was Informed of Error.No Media Interest Reported + (ML20206G381)
- ML20206G382 + (ML20206G382)
- PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws + (ML20206G384)
- ML20206G385 + (ML20206G385)
- ML20206G388 + (ML20206G388)