Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206G205 + (ML20206G205)
- ML20206G206 + (ML20206G206)
- ML20206G207 + (ML20206G207)
- ML20206G208 + (ML20206G208)
- ML20206G210 + (ML20206G210)
- ML20206G211 + (ML20206G211)
- ML20206G212 + (ML20206G212)
- ML20206G214 + (ML20206G214)
- IR 05000409/1987005 + (ML20206G215)
- ML20206G217 + (ML20206G217)
- ML20206G218 + (ML20206G218)
- ML20206G219 + (ML20206G219)
- ML20206G221 + (ML20206G221)
- ML20206G222 + (ML20206G222)
- ML20206G223 + (ML20206G223)
- ML20206G224 + (ML20206G224)
- ML20206G225 + (ML20206G225)
- ML20206G227 + (ML20206G227)
- ML20206G228 + (ML20206G228)
- ML20206G230 + (ML20206G230)
- ML20206G232 + (ML20206G232)
- ML20206G234 + (ML20206G234)
- ML20206G235 + (ML20206G235)
- ML20206G236 + (ML20206G236)
- ML20206G237 + (ML20206G237)
- ML20206G238 + (ML20206G238)
- 05000373/LER-1988-023-03, :on 881017,ESF Isolation of Reactor Bldg Ventilation Occurred Due to Jumper Falling Off Relay 1PDS-VR049X3 During Surveillance Testing.Caused by Unplanned Removal of Electrical Jumper + (ML20206G240)
- ML20206G241 + (ML20206G241)
- DCL-88-277, Endorses NUMARC Comments on Proposed Rule 10CFR26 Re Fitness for Duty.Receipt of Matl Should Be Ack on Ltr & Returned in Encl Envelope + (ML20206G242)
- L-99-074, Forwards Changes to BVPS ERDS Data Point Library,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394, Rev 1,Section 3.6, Administrative Implementation Requirements + (ML20206G245)
- 05000302/LER-1988-023, :on 881017,personnel Determined That Tech Spec Surveillance Requirement Re Pressurizer Heaters Not Being Met.Caused by Miscommunication Between NRC & Util.Procedures Revised to Correctly Implement Requirements + (ML20206G246)
- ML20206G248 + (ML20206G248)
- ML20206G249 + (ML20206G249)
- ML20206G250 + (ML20206G250)
- ML20206G251 + (ML20206G251)
- U-601304, Forwards Payment of Civil Monetary Penalty in Amount of $75,000,per NRC 881020 Order & Insp Repts 50-461/87-26 & 50-461/88-10 + (ML20206G252)
- 05000302/LER-1988-021, :on 881014,ESF Actuation Occurred That Injected 1,000 Gal Borated Water Into Rcs.Caused by Procedure Violation Due to Inadequate Job Briefing.Event Reviewed at Meeting of Instrument & Control Shop Personnel + (ML20206G255)
- LIC-99-0043, Forwards Fort Calhoun Performance Indicators Rept for Mar 1999 + (ML20206G256)
- ML20206G258 + (ML20206G258)
- ML20206G259 + (ML20206G259)
- 05000293/LER-1988-024-01, :on 881017,Group 1 Isolation Signal Due to High Water Level in Reactor Vessel Occurred.Caused by Disassociation of Pin from Feedback Cam Linkage of Valve Positioner for Valve.Linkage Secured + (ML20206G262)
- ML20206G264 + (ML20206G264)
- ML20206G267 + (ML20206G267)
- ML20206G268 + (ML20206G268)
- ML20206G269 + (ML20206G269)
- ML20206G270 + (ML20206G270)
- ML20206G272 + (ML20206G272)
- ML20206G276 + (ML20206G276)
- ML20206G280 + (ML20206G280)
- ML20206G281 + (ML20206G281)
- ML20206G282 + (ML20206G282)