Supplemental Deficiency Rept CP-87-15 Revising Corrective Action Implementation Schedule Re Air Accumulators for air-operated Control Valves
ML20206G207
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/18/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-15, TXX-88788, NUDOCS 8811220145
Download: ML20206G207 (1)


Text

_ _

E Log # TXX-88788 1

File i 10110

=

=

903.9 7t# ELECTRIC Ref.#10CFR50.55(e)

I 3Cgg November 18, 1988 l

U. S. Nuclear Regulatory Commission I

Attn Document Control Desk Washington, D. C.

20555

[

SUBJECT:

COMANCHEPEAKSTEAMELECTRICSTATION(CPSES) f DOCKET NJS. 50-445 AND 50-446 t

AIR ACCUMULATORS FOR CONTROL VALVES f

SDAR: CP-87-15 (SUPPLEMENTAL REPORT) j Gentlemen t

On January 18, 1988, we notified you by our report logged TXX-88009 of a

[

deficiency involving the air accumulators for air-operated control valves.

l The latest report on this issue was TXX-88574, dated August 1, 1988.

The i

purpose of this supplemental report is to revise the corrective action implementation schedule for this issue.

[

t The estimated date for completion of the as-built verification, documentation, and inspection of the Unit 1 air accumulators has been revised to j

March 30,1989.

The Unit 2 estimated completion schedule remains unchanged.

[

Very truly purs, j

NW W. G. Counsil JLR/mlh t

c Mr. R. D. Martin, Region IV i

Resident inspectors, CPSES (3)

[

f i

l 8911220145 881119 I

PDR ADOCK 0500044'3

[E L7 i

I x0,\\orsk (nw 5 rres 1381 Laie Tosu!3No h

l F