Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205C492 + (ML20205C492)
- ML20205C495 + (ML20205C495)
- ML20205C496 + (ML20205C496)
- ML20205C497 + (ML20205C497)
- TXX-5001, Forwards Responses,W/Exceptions Noted,To Concerns & Requests Listed in Ltrs 84056.088,.090,.092,.093 & .094 Re Open Items in Phase IV Rept.Requests Cygna Proceed to Completion & Issuance of Phase IV Rept,Per Spence .W/O Encls + (ML20205C500)
- ML20205C501 + (ML20205C501)
- ML20205C502 + (ML20205C502)
- ML20205C503 + (ML20205C503)
- ML20205C504 + (ML20205C504)
- ML20205C506 + (ML20205C506)
- ML20205C508 + (ML20205C508)
- ML20205C510 + (ML20205C510)
- ML20205C512 + (ML20205C512)
- IR 05000302/1985032 + (ML20205C514)
- ML20205C518 + (ML20205C518)
- ML20205C519 + (ML20205C519)
- ML20205C520 + (ML20205C520)
- ML20205C521 + (ML20205C521)
- ML20205C523 + (ML20205C523)
- ML20205C524 + (ML20205C524)
- ML20205C526 + (ML20205C526)
- TXX-9707, Forwards Certified Copies of Listed Endorsements to Nuclear Liability Insurance Nelia Policies + (ML20205C528)
- ML20205C529 + (ML20205C529)
- ML20205C531 + (ML20205C531)
- ML20205C536 + (ML20205C536)
- ML20205C537 + (ML20205C537)
- ML20205C540 + (ML20205C540)
- IR 05000458/1999301 + (ML20205C541)
- IR 05000528/1987009 + (ML20205C542)
- ML20205C543 + (ML20205C543)
- ML20205C544 + (ML20205C544)
- ML20205C545 + (ML20205C545)
- ML20205C546 + (ML20205C546)
- ML20205C547 + (ML20205C547)
- IR 05000498/1987011 + (ML20205C549)
- ML20205C551 + (ML20205C551)
- 05000416/LER-1985-031, :on 850816,cell in Div 1 Battery Bank Found to Be Inoperable Based on 850813 Specific Gravity Measurements. Caused by Personnel Error.Surveillance Procedure Being Revised to Clarify When Battery Inoperable + (ML20205C552)
- SVP-99-054, Forwards Quad Cities Simulator Four-Yr Certification Rept, IAW 10CFR55.45,Section (b)(5)(ii).Rept Summarizes Simulator Testing Performed Since Last Certification Rept Submitted on 950310 + (ML20205C554)
- ML20205C555 + (ML20205C555)
- ML20205C558 + (ML20205C558)
- ML20205C560 + (ML20205C560)
- ST-HL-AE-1347, Final Deficiency Rept Re Auxiliary Feedwater Sys Pipe Spools Supplied W/Incorrect Wall Thicknesses.Initially Reported on 850524.Spools Being Refabricated by Southwest Fabricating. Bechtel & Fabricator Agreed to Enforce Correct Process + (ML20205C561)
- ML20205C563 + (ML20205C563)
- ML20205C565 + (ML20205C565)
- 05000267/LER-1985-013, :on 850813,Loop 2 Steam Generator Penetration Interspaces Not Maintained Above Cold Reheat Steam Pressure W/Reactor Shut Down.Caused by Operator Error.Procedure OPOP-IB1 for Raising Pressure Revised + (ML20205C566)
- ML20205C567 + (ML20205C567)
- ML20205C568 + (ML20205C568)
- IR 05000322/1986012 + (ML20205C569)
- ML20205C570 + (ML20205C570)
- IA-88-463, Final Response to FOIA Request for Documents.App a Documents Totally Withheld (Ref FOIA Exemption 5) + (ML20205C572)
- ML20205C572 + (ML20205C572)