ML20205C495

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/85-32 on 850808-21.No Violation or Deviation Noted
ML20205C495
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/10/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20205C499 List:
References
NUDOCS 8509200287
Download: ML20205C495 (1)


See also: IR 05000302/1985032

Text

.

yetk

0

0

SEP10192

Florida Power Corporation

t/ ATTN:

Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. H-2

St. Petersburg, FL 33733

Gentlemen:

SUBJECT: REPORT NO. 50-302/85-32

On August 8-21, 1985, NRC inspected activities authorized by NRC Operating

License No. DPR-72 for your Crystal River facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

irientified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, , interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

\\S L

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-302/85-32

cc w/ encl:

ti. M. Howard, Director

Site Nuclear Operations

of. F. McKee, Nuclear Plant Manager

4 R. Westafer, Manager

'

Nuclear Operations Licensing

and Fuel Management

b c w/ encl:

S

L4RC Resident Inspector

Document Control Desk

j

'

State of Florida

yl 0 {C, b

-

'

RII

RII

RII

\\f

i

t:bhg

FJah

AH rdt

9/6/85

9/J 85

9/ /85

8509200287 850910

l ll l

PDR

ADOCK 05000302

G

PDR

y,