Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204A933 + (ML20204A933)
- ML20204A937 + (ML20204A937)
- ML20204A969 + (ML20204A969)
- NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material + (ML20204A970)
- ML20204A974 + (ML20204A974)
- ML20204A985 + (ML20204A985)
- IR 05000298/2020002 + (ML20204B004)
- PMNS20200870, Pre-Application Meeting with U.S. Geological Survey Triga Research Reactor Staff to Discuss the Regulatory and Licensing Requirements Involved with a Planned License Amendment Request + (ML20204B005)
- ML20204B011 + (ML20204B011)
- ML20204B012 + (ML20204B012)
- ML20204B013 + (ML20204B013)
- ML20204B014 + (ML20204B014)
- ML20204B015 + (ML20204B015)
- ML20204B016 + (ML20204B016)
- ML20204B017 + (ML20204B017)
- ML20204B018 + (ML20204B018)
- ML20204B019 + (ML20204B019)
- ML20204B020 + (ML20204B020)
- ML20204B021 + (ML20204B021)
- ML20204B022 + (ML20204B022)
- ML20204B023 + (ML20204B023)
- ML20204B026 + (ML20204B026)
- ND-20-0808, Southern Nuclear Operating Company, Vogtle Electric Generating Plant Unit 4, ITAAC Closure Notification on Completion of Item 2.3.05.03a.ii (Index Number 3441) + (ML20204B029)
- ML20204B031 + (ML20204B031)
- ML20204B051 + (ML20204B051)
- ML20204B054 + (ML20204B054)
- ML20204B057 + (ML20204B057)
- ML20204B062 + (ML20204B062)
- PMNS20200832, Partially Closed Meeting with Framatome and the Nuclear Regulatory Commission on Accident Tolerant Fuel (ATF) and Advanced Fuel Management + (ML20204B067)
- ML20204B078 + (ML20204B078)
- ML20204B082 + (ML20204B082)
- 05000155/LER-1978-032-03, /03L-0 on 780819:Failure of Check Valve Providing Containment Integrity in 2 Demineralized Water Line Contributed to Containment of Plant Demineralized Water Sys Check Valve Repaired 780905 + (ML20204B091)
- ML20204B092 + (ML20204B092)
- ML20204B100 + (ML20204B100)
- 05000247/LER-1987-003, :on 870202,during Planned Shutdown,Condensate Storage Tank Isolation Valve LCV-1158 Failed to Close in Required Time.On 870203,motor Driven Auxiliary Feedwater Pumps Failed Flow Test + (ML20204B102)
- ML20204B106 + (ML20204B106)
- ML20204B132 + (ML20204B132)
- ML20204B137 + (ML20204B137)
- ML20204B148 + (ML20204B148)
- ML20204B157 + (ML20204B157)
- W3P87-0916, Informs That Schedule for Installation of Diverse Scram Sys & Turbine Trip Delayed Until Third Facility Refueling Outage,Due to NRC Regulatory Delays + (ML20204B161)
- ML20204B164 + (ML20204B164)
- ML20204B169 + (ML20204B169)
- ML20204B172 + (ML20204B172)
- ML20204B181 + (ML20204B181)
- ML20204B184 + (ML20204B184)
- ML20204B186 + (ML20204B186)
- ML20204B188 + (ML20204B188)
- ML20204B189 + (ML20204B189)
- ML20204B198 + (ML20204B198)
- ML20204B202 + (ML20204B202)