ML20204B132
| ML20204B132 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/18/1987 |
| From: | Shelton D TOLEDO EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 1366, NUDOCS 8703240683 | |
| Download: ML20204B132 (1) | |
Text
TOLEDO
%sEDISON DONALD C. SHELTON va nam
[419)249 2.199 Docket No. 50-346 License No. NPF-3 Serial No. 1366 March 18, 1987 United States Nuclear Regulatory Commission Document Control Dett Washington, D. C.
20555 Centlement i
This letter is to inform you of a management change affecting the Davis-Besse Nuclear Power Station. This change will be effective March 18, 1987 and is as follows:
Mr. Joe Williams, Jr. has lef t his position as Senior Vice President, Nuclear. As Vice President, Nuclear, I have assumed those responsibilities previously held by Mr. Williams and report directly to Mr. Paul Smart, President and Chief Operating Officer, Toledo Edison Company.
Section 6.0, Administrative Controls, of the Davis-Besse Technical Speci-fications will be revised to reflect this change.
Very trul
- ours,
!CS:MHL p1f cet DB-1 NRC Resident Inspector A. B. Davis, Regional Administrator (2 copies) 0 07g32gg g $ $$
6 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLLDO, OHl0 43052
_ _ - - - - _ -