Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203F563 + (ML20203F563)
- ML20203F565 + (ML20203F565)
- ML20203F566 + (ML20203F566)
- ML20203F568 + (ML20203F568)
- ML20203F570 + (ML20203F570)
- ML20203F571 + (ML20203F571)
- AECM-86-0224, Requests NRC Approval of Proposed Change to Inservice Insp Program to Allow Use of Figure Iwb 2500-7(b) from 1983 Edition,Summer 1983 Addenda of ASME Code,Section XI Re Exam Category B-D Weldments.Fee Paid + (ML20203F575)
- ML20203F577 + (ML20203F577)
- ML20203F578 + (ML20203F578)
- ML20203F579 + (ML20203F579)
- ML20203F580 + (ML20203F580)
- PNO-IV-97-072, on 971215,general Licensee in Boise,Id Reported Missing Po-210 Source Contained in Ionizer Device. Device Described as Barrel Ionizer Model P2021,containing Source Serial 091387.State of Id & NMSS Informed + (ML20203F581)
- 05000321/LER-1997-007-03, :on 971118,pneumatic Leak Resulted in Closure of Pciv.Caused by N Leak from Pneumatic Manifold on MSIV 1B21-F022B.Repaired Leak & Confirmed That No Similar Leaks Exist on Any Other MSIVs + (ML20203F584)
- ML20203F585 + (ML20203F585)
- ML20203F586 + (ML20203F586)
- ML20203F589 + (ML20203F589)
- ML20203F590 + (ML20203F590)
- ML20203F592 + (ML20203F592)
- PNO-II-92-055B, on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew + (ML20203F593)
- ML20203F594 + (ML20203F594)
- ML20203F598 + (ML20203F598)
- ML20203F600 + (ML20203F600)
- ML20203F602 + (ML20203F602)
- ML20203F604 + (ML20203F604)
- IR 05000369/1997020 + (ML20203F606)
- ML20203F608 + (ML20203F608)
- ML20203F610 + (ML20203F610)
- ML20203F611 + (ML20203F611)
- IR 05000317/1986005 + (ML20203F613)
- ML20203F614 + (ML20203F614)
- ML20203F616 + (ML20203F616)
- A97023, Provides Response to NRC RAI for Addl Info Re Mod Necessary to Address Issues Identified in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions + (ML20203F617)
- ML20203F618 + (ML20203F618)
- ML20203F620 + (ML20203F620)
- ML20203F621 + (ML20203F621)
- ML20203F622 + (ML20203F622)
- 05000361/LER-1997-015, :on 971117,inadequate Surveillance Testing of Charging Pump Relay Contacts Noted.Caused by Inadequate Surveillance Test Procedure.Subject K108 Subgroup Relay Contacts Tested Satisfactorily & Procedures Revised + (ML20203F624)
- ML20203F625 + (ML20203F625)
- ML20203F626 + (ML20203F626)
- ML20203F627 + (ML20203F627)
- ML20203F630 + (ML20203F630)
- 05000295/LER-1986-013-01, :on 860324,lower Limit of Detection for Gross Beta/Gamma Analysis Sump Discharge Failed to Meet Tech Spec Requirements.Caused by Inadequate Procedures.Procedures Revised + (ML20203F632)
- ML20203F633 + (ML20203F633)
- ML20203F634 + (ML20203F634)
- ML20203F636 + (ML20203F636)
- ML20203F637 + (ML20203F637)
- ML20203F638 + (ML20203F638)
- ML20203F639 + (ML20203F639)
- ML20203F641 + (ML20203F641)
- ML20203F642 + (ML20203F642)
- ML20203F643 + (ML20203F643)