' n11LLSTONE NUCLF.AR POWER STATION v

SURVEILLANCE PROCEDURE Fire Pump Diesel Engine Batteries, Weekly Surveillunce SP 788.3 Rev.10 -

j,

/1 j

(m fj;'g jQ ia 'T [7 N[ 7 N. }[ M fyj{[ t VA V% px rq Approval: s PORC Mtg. No: Y \\~) (r Date: \\D \\ \\ n\\ cm Effective Date: \\ 2_- \\ 1.- O 9712170411 971211 PDR ADOCK 05 g5 ,e s F (" Levelof Use SME: D. Burdick General I

o Millstone Unit ! . Surveillance Prncedure Fire Pump Diesel Engine Batteries, Weekly Surveillance .TABI E OF CO'.rrENTS 1. PURPOSU....................................................2 2. P R E R E Q U I S I TES............................................. 3 3. P R ECAUTI O N S............................................... 4 4. I N STR U CTI O N S............................................... S 5. R EVI EW AN D SIG N-O FF...................................... - 7 6. R E FE R E N C ES................................................ 7 7. S U M M A RY O F CH ANG ES..................................... 7 A'ITACllMENTS AND FORMS Maint. Form 788.3-1. " Fire Pump Diesel Engine Battery Weekly Surveillance" t l l l i wgi ~ ghe md y y[ gg. SP 788 3 ' Level of Use General p3 pg pq pg g p, 1, [---,. v. -e r r-e=- y v. w

1. PURPOSE C

1.1 Objective The objective of this procedure is to provide instructions for the weekly surveillance of the fire pump diesel engine batteries. This procedure satisfies the technical requirements stated in Section 4.1.A.1.h.1(a) and (b) of the " Unit 1 Technical Requirements Manual," OPS Form 273-7.2," Fire Protection 'lbchnical Requirements." This procedure also satisfies the technical requirements stated in Section B.3.a.1) and 2) of the " Unit 3 'Ibchnical Requirements Manual," 3TRM-7.4. The Unit 2 'Ibchnical Requirements Manual does not include a specific requirement to perform this survelliance; however, the Unit 2 Shift Manager must be notified in the event of a failed surveillance. l 1.2 Discussion This procedure provides instructions for performing weekly battery surveillance. The surveillance data is measured and recorded on the p surveillance form. Demineralized water additions,if needed, are y perfortned after all data is recorded. 1.3 Applicability This procedure is applicable in all plant operating modes. This procedure applies to the two fire pump diesel engine batteries with the following localIDs: BATTERY-DFP-A: ""A' Diesel Fire Pump-Battery" [ 4 BATTERY-DFP-B: ""B' Diesel Fire Pump-Battery" 1.4 Frequency Weekly w [~ d SP 788 3 wffyr w[dyrsM:ySgdgy r Level of Use: General fQ fN( p% p% 2 of 7 [

f C

2. PREREOUISITES

' 2.1 General [ V t 2.1.1 Maint. Form 788.3-1 cover sheet has been signed authorizing the j sun >cillance. 2.1.2 Ventilation in vicinity of battery is operable and free of obstructions. I 2.1.3 Eyewash is provided within vicinity of battery. 2.2 Measuring and iht Equipment (M&TE) 2.2.1 All M&TE has been calibrated in accordance with WC-8, " Control and Calibration of Measuring and 1bst Equipment" and the calibration is current. t 2.2.2 Voltmeter with a minirnum range of 0 to 20 volts de and a minimum accuracy of i0.1 volt such as OA-1656 2.3 Tools and Consumables (As Necessary) 4 O 2.3.1 lbols v Insulated flashlight 2.3.2 Equipment Personal protective equipment, including goggles, face shield, acid-proof gloves, acid-proof apron, and long-sleeved shirt llot plate or heat gun (for grease application) 2.3.3 Consumables Demineralized water Approved oxide inhibitor or corrosion-resistant oil, such as NO-OX-ID grease . Baking soda for neutralizing solution (One pound baking soda per gallon demineralized water) Low-lint cloths O A A 4 se 7883 wgjapr ~ggy gjoF 'N.A V r Level of Use evsf gey 36 General pg pg rg r4 3 g,

. _. - _.. ~. _ _ _. C

3. PRECAUTIONS 3.1 No smoking, arcing, open flames, or sources of ignition are permitted while working in proximity to or on batteries. -

3.2 - Do not allow any metal objects to short across the battery connections. 3.3 -Insulate all working tools. - 3.4 Only demineralized water may be added to battery cells. Demineralized l water may be obtained from Chemistry Department. Amount added to i cach cell must be documented on the inaintenance form for the battery. i C i v 1 r h k k m-ngF MIAcV"a,sss;W. SP788.3 - LeVelof Use ,egfpv 6 gev, to General /#% . /PQ p% p%\\ 4 gg 7 j ~ ye.w---- w.h5.'..,w.,,..~.c ,..m#.,..,,.. ,ygm ,.,,,r..-w, .,r,.vw. ,w.#,,v n ..w w. .,w.,.,,-.. ._,,%%w,.y-. - r m, c e rype-,- ,g.m.,y.,,.,w. ,r.,,,,,-g,g.y.-m,.m 5

..--~ -. -.. 4

4. INSTRUCrlONS C

NOTE - Measurements may be taken in any order as long as all specified parameters aio measured and recorded. 4.1 MEASURE battery terminal voltage, and RECORD value on Maint. Form 788.3-1. 4.2 E battery terminal voltage is less than 12 volts, NOTIFY the following individual <: . FLS Unit 1 Shift Manager Unit 2 Shift Manager Unit 3 Shift Manager 4.3 Ol3 SERVE electrolyte level of each cell. O 4.4 E cell electrolyte level is above the plates, RECORD level of cell as "N" (normal) on Maint. Form 788.3-1. 1 4.5 E cell electrolyte level is; a between /8 inch above the plates and the bottom of the cell fill neck, PERFORM the following: i 4.5.1 lE cell electrolyte level is at.QR below the plates, NOTIFY the following personnel: FLS Unit 1 Shift Manager Unit 2 Shift Manager Unit 3 Shift Manager 4.5.2. DON protective clothing and equipment. p xy g v7 fp 7 )gg SP 788 3 Level of Use w R General pq pg pg pq s of 7 s a c,,,,,,. _.


_,...._..,._.,._,.._.---_--r-._

...... ~

4.5.3 MEASURE and ADD demineralized water until cell electrolyte f'. 1 i level is between /8 nch above the plates and the bottom of the cell fill neck. 4.5.4 RECORD amount of water added to cell in applicable row of "I120 (ml)" column on Maint. Form 788.3-1. 4.6 Visually INSPECT terminal connections and cell posts for dirt and corrosion. 4.7 IE terminal connections or cell posts show signs of dirt or corrosion, PERFORM the following in-service cleaning: 4.7.1 DON protective clothing and equipment. CAUTION 1. Terminals and cell connectors are lead-coated. Carr. nust be used not to remove lead coating during cleaning process. 2. 'Ibrminals must not be disconnected during during the following cleaning activity, p V 4.7.2 Using clean rags dampened with demineralized water or acutralizing solution, WIPE battery acid buildup and loose corrosion from battery casing and terminal connections. 4.7.3 IE neutralizing solution was used, WIPE components and surfaces with demineralized water. 4.7.4 Using clean, low-lint cloths, DRY battery and connections thoroughly. NOTE One recommended oxide inhibitor is NO-OX-ID ;rease. Heating

rease will aid in grease application. Recommendec method is to use a lot plate and heat gresse to cream-like consistency maintaining approximately 160 'F and to apply grease using soft brush.

4.7.5 APPIX a thin co?, ting of approved oxide inhibiting grease to cell posts and connecting hardware. i n SP 788 3 l' Level of Use pr yg gyr 5 }g g General pA y% pg p% g,,, l

5. REVIEW AND SIGN-OFF m

( i 5.1 The review and sign-off for this procedure is satisfied by the review and sign-off of hiaint. Form 788.3-1.

6. REFERENCES 6.1 "NUSCo Accident Prevention hianual" 6.2 "Ibchnical Specificationsfrechnical Requirements 6.2.1 "htillstone Unit 1 Technical Requirements h1anual," OPS Form 273-7.2, Section 4.1.A.1.gh.1.a) and b) 6.2.2 "hiillstone Unit 3 Technical Requirements hianual," 3TRhi-7.4, Section B.3.a.1) and 2) 6.3 Administrative Procedures 6.3.1 WC 8," Control and Calibration of hicasuring and Test Equipment"
7. SUhthiARY 31'CllANGES pC 7.1 Per AR 9702306802, incorporated requirement to notify the Unit 2 and Unit 3 Shift hianagers in the event of a failed surveillance.

Added references to the applicable sections of the Unit 3 TRhi. 7.1.1 Added step to don protective clothing when adding electrolyte. 7.1.2 Added clarification as to the desired cell electrolyte level. 7.1.3 Added instructions for cleaning battery termina! connections and cell posts. O i A. A, A Se 788 3 Levelof Use ' ETo# " THIN F M cT? 'hivieli~ A ney, io General 4 ps-i /4 hA 7 of 7 y}}