Rev 11 to Sp 788.3-1, Fire Pump Diesel Engine Batteries, Weekly Surveillance
ML20203F610
Person / Time
Site: Millstone  
Issue date: 12/12/1997
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20203F465 List:
References
SP-788.3-1, NUDOCS 9712170421
Download: ML20203F610 (2)


Text

_ -.

k 1

i j

Fomi Approval l

. Appoval Approvai Date Effective Date PoRc Meeting No.

M.

/

\\.3 \\ \\hl %

Yh-\\L~ M

\\"CV]-\\1 6

+

v E[

5 Fire Pump Diesel Engine Batteries, Weekly Surveillance Generic information l l

Reference Procedure -

Appl 6 cable Tech. Spec /TRM Frequency

{

Unit 1 TRM, OPS Form 273-7.2, SP 788.3 -

  1. '8%

i Section 4.1.A.1.h.1a) & b)

Unit 3 TRM,3TRM-7.4, Section B.3.a.1) & 2) l This form is being used for the following:.

0 Tech spec surveiiiance O system ^iianment

@ other: Technical Reautrements Manua O Maint+nancenestoration O Non-Tech Spec

-l (Retest)

Surveillance (PM) 1 Specific information l

Scheduled Date l Applicable Mode AWO~

i Applicable in all plant modes Test Authorized By (SM/US)

Date Prerequisites Completed By (Initials /Date)

Precautions Noted By (Initials /Date)

Dato Surveillance completed By Acceptance Criteria Met?

O vEs O NO I

Accepted By (Department FLS)

Date Approved By (Department Head! Designee) -

Date SNft Manager at units 1,2 and 3 Notified of Failed Surveillance Date i

Acceptance Criteria Acceptance criteria is considered met when all of the following conditions occur:--

1. Electrolyte level of each battery cellis above the plates.-
2. Battery voltage is greater than or equal to 12 volts.

Test Equipment =

f

Eculoment Tvoe

Identification /QA Number Calibration Due Dats Digital Multimeter Maint. Form 788.3 !

7 J M 217 g g7 g Rev.11 1

.F.

PDn a Page 1 of 2 -

,s.

a..-.-..

_a _ _ _.. -..., _ - _.

Fire Pump Diesel Engine Batteries, Weekly Surveill:nce Data and Comments j

0 i

Acceptance BaHey ID Value Step Measurement Criteria (Circle One) 4.1 Battery Terminal Voltage 212 volts A or B volts l

i Steps 4.4 and 4.5. Cell Electrolyte Levels (Acceptance Criteria: Electrolyte level must be above the plates.)

i H O (ml) j Cell Level 2

1 f

2 3

4 5

6 l

Comments l

I i

O Maint. Form 788.3-1 I

Rev.11 Page 2 of 2

.