Proposed Tech Specs Re Fire Barrier & Fire Detection
ML20203F580
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/22/1986
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20203F537 List:
References
NUDOCS 8604250183
Download: ML20203F580 (4)


Text

._

k PBAPS LIMITING' CONDITIONS FOR OPERATION-SURVEILLANCE REQUIREMENTS

~

\\

/

\\

3.14.C Fire Detection 4.141C Fire Detection j

~

l..

The fire detection instru-mentation _for each plant listed

. 1.a.

The smoka detectors listed in Table 3.14.C.f shall be in Table 3.14.C.1 shall be functior. ally tes ted ' semi-operable when' the equipment annually in acccrdance with in that area is required the manufacturer /s to be operable..

-instructions.

':+

2.

If the number of ' operable

'b.

The'h' eat detectors-list'ed r

-fire detection instruments isiless than the minimum in Table 3.14.C.1 shall be functionally tested semi-

,e instrument operability re-annually with a heat source.;

quirement of Table 3.14.C.1:

?

a.-

establish a fire watch c.

The NFPA Code 72D Class A' s

patrol to inspect each supervised circuits between accessible area at the local panel and control intervals of at least:

room of each of *:he above required fire detection 1)

Once per shift for instruments shall be demon-areas with less than strated OPERABLE at least the minimum number of once per 6 months.

operable instruments

. required by Table d.

Thermal heat detection 3.14.C.1 but with at

. cable shall be tested s

least one instrument for alarm functions (continuity and trouble operable.

s alarms) at least once 2)

Once-every hour for,,

per six months.

Loop areas without an i

resistance shall be operable' instrument.

measured, recorded, and compared to that previously recorded.

b.

. restore accessible sydtem 2.

The testing inter"al for components to an operable smoke and heat decectors status within 14 days, or which~are inaccessible due submit a Special Report to high radiation or-to the the NRC within inerting 'may be Mtended 31 days outlining 'the -

until such time as

~

cause of the malfunction the detectors become and the plans for accessible for a minimum restoring the instru-of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Such dot-ments to an operable tectors shall be functionally status. Reactor startup tested at a maximum and/or continued reactor interval of once per operation is pere,issible.-

refueling cycle.

N.

s

-2401-8604250183 860422 PDR ADOCK 05000277 P

PDR f

-h%-

p

,y r

m-

y

~

45$,4 PBAPS' j

..gp

[

~

iLIMITING CONDITIONS FOR OPERATION ~

SURVEILLANCE REQUIREMENTS M3.14.D. Fire / arriers 4.14.D Fire Barriers B

ii 1.

-Fire barriersl(including

1. Fire barriers required D w.
walls, floor, ceilings,~ electrical to meet the provisions

%D@L cable enclosures, cable, piping of 3.14.D.1 (fire doors

-#~'

and ventilation duct penetration excluded -'see speci-N4 seals,' fire doors, and fire fication 4.14.D.2) shall M-i dampers)--which protect be. verified operable

-J:

safety 1related-systems following maintenance 1,

' required.to ensur,e safe or modi fications, and by per-

' ' I.-

shutdown capability-in the forming the following visual event ~of a fire, shall be inspection at least once r

D ifunctional.

per 18 months: *

~

a.

The exposed surface of each fire barrier wall, floor, ceiling, and elec-trical cable enclosure.

4; 7

.~

~

Exposed surfaces are f 2.1 gIf the requirements of those surf aces that can 13.14.D.1 cannot be met,.

be ' viewed by the -inspector within one hour establish a from the floor.

4

-continuous fire watch on at

~^

lleast'one side of the

' b.;

Each fire damper, excluding.

af fected fire barrier,.or those dampers which require

verify _the operability of

'scaf folding for' inspection or -

fire detectors on at least present ALARA concerns.

one side of the inoperable

-fire barrier and establish c.

At least 25 percent of an -hourlyL fire watch patrol.

the fire dampers not' inspected'

~

Reactor startup and' continued under the provisions of reactor operation is 4.14.D.l.b, such that

. permissible.:

each of these dampers is inspected once per.6 years..

d.

At least=10 percent of each type of fire barrier penetra-D tion seal (including electrical h

cable, piping, ventilation duct penetration seals, and excluding. internal conduit

g.,

rh seals) such that each pene--

tration seal will be inspected at least once per 15 years.

Difficult-to-view fire barrier (unexposed) walls,

. requiring access to radiation cable enclosures that are areas may be' deferred-until rendered accessible by the

. c

. the next refueling outage or penetration seal inspection

.Y?'

shutdown. initially expected program shall also be to be of at least 30-day.

inspected during each 10 5 duration.

percent inspection.

1 g d.7

- 240j(1)

}. -

I f

'?t-i-

1 11 sev

+mww==+tw---g e-e - d 9

+r-p ar-eM-Te

?-*~w+

+++te--Wtt v-rwe-~-Wt>y--W-y v v

?

~w-?q=

+t*

-ey==*/

T,9ry-w yy.,wri y

--, e m-e

r;.

1 PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLLNCE REQUIREMENTS 4.14.D Fire Barriers (Cont'd) 1.

(Continued)

If any penetration seal fire damper selected for inspection is found by surveillance requirements 4.14.D.l(d) in a condition which may compromise the operability of the penetration seal, the cause shall be evaluated.

If the cause is a failure to adhere to penetration seal procedures, or an identified phenomenon (e.g.,

physical interference), the cause shall be corrected and potentially affected seals inspected.

Otherwise, a visual inspection of an additional 10 percent, selection based on the nature of the degradation, shall be made.

This inspection process shal' antinue until a 10 percent sawple with no degradation is found.

2. Fire doors required to meet the provisions of 3.14.D.1 shall be verified operable by inspecting the closing mechanism and latches every 6 months *, and by verifying:

a.

The operability of the fire -

door supervision system for each electrically supervised fire door by performing a l

functional test every month, b.

That each locked-closed fire door is in the closed position every week.

c.

That each unlocked fire door without electrical supervision is in the closed position every day.

  • Fire door inspections requiring access to radiation areas may be deferred until the next refueling outage or shutdown initially expected to be of at least a 7-day duration.

240j(2)

F TABLE 3.14.C.1 FIRE DETECTORS Detector Type /

Minimum Detectors Location Designation (l)

Operable HPSW Pump Room S391 1

Condensate Demin. Piping SillA,Sil2A,Sil3A,Sil4A 11 Tunnel (91'6") Rms. 17, 50, S115A,Sil6A,S117A,S118A 53 S119A,S120A,S121A,S122A, Turbine Bldg.-General Area S123A,S124A,S125A,S126A 11 Corridor (116') Room 170 S127A,S128A,S129A,S130A S131A,S132A,S133A,S134A Turbine Bldg.-General Area S135A,S136A,S137A,S138A 7

Corridor (135') Room 264 S139A,S140A,S141A,S145A COMMON Control Room S21, S22, S23, S24 5

Thermal Heat Detection Cable Control Room Offices S137, S138, S139 6

S140, S141, S142 Cable Spreading Room S4, S7, S9, S10 23 S47 through S67 (total: 25)

Computer Room S5, S6 2

Diesel Generator Room H550A,B thru H557A,B See-(3.14.B.3.c)

(4 in each room)

D-G Bldg.-Cardox Room S540, S541, S542 3

HP Utility Room (116')

S90A 1

Room 129 Radwaste Bldg. (91'6")

S73A, S74A, S75A 4

Room 33 S76A Radwaste Bldg. (116')

Room 144, 146 S91A, S92A, S93A 3

Room 141 S94A, S95A, S96A 3

Standby Gas Treatment System 6 per filter train 5

Radwaste Bldgs.

Rooms 24, 31 (91'-6")

S8B, S80, S81, S82 4

Rooms 142, 143, 145 S99, S1A, S2A 7

147, 154 (116')

S3A, S4A, S5A S6A

-240p(l)-