Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203C803 + (ML20203C803)
- ML20203C804 + (ML20203C804)
- ML20203C810 + (ML20203C810)
- ML20203C812 + (ML20203C812)
- LIC-99-0011, Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 1 + (ML20203C814)
- PNO-I-98-005A, on 980220,lost of 1 Mci P-32 Package Update Made.Licensee Performed Radiological Surveys of All Water Coolers & Coffee Pots in Bldg at Which Package Delivered,As Precautionary Measure.Area Contamination Surveys Performed + (ML20203C815)
- ML20203C817 + (ML20203C817)
- ML20203C818 + (ML20203C818)
- ML20203C820 + (ML20203C820)
- ML20203C823 + (ML20203C823)
- ML20203C825 + (ML20203C825)
- ML20203C829 + (ML20203C829)
- ML20203C830 + (ML20203C830)
- IR 05000267/1986013 + (ML20203C832)
- ML20203C833 + (ML20203C833)
- ML20203C836 + (ML20203C836)
- ML20203C837 + (ML20203C837)
- ML20203C840 + (ML20203C840)
- ML20203C841 + (ML20203C841)
- ML20203C844 + (ML20203C844)
- ML20203C848 + (ML20203C848)
- ML20203C849 + (ML20203C849)
- ML20203C850 + (ML20203C850)
- ML20203C851 + (ML20203C851)
- W3P86-1423, Forwards Louisiana Power & Light & Middle South Utils 1985 Annual Repts + (ML20203C852)
- ML20203C853 + (ML20203C853)
- ML20203C854 + (ML20203C854)
- ML20203C858 + (ML20203C858)
- PNO-I-86-050A, on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing + (ML20203C859)
- ML20203C860 + (ML20203C860)
- ML20203C861 + (ML20203C861)
- ML20203C863 + (ML20203C863)
- ML20203C864 + (ML20203C864)
- ML20203C866 + (ML20203C866)
- ML20203C867 + (ML20203C867)
- ML20203C868 + (ML20203C868)
- 3F0298-23, Forwards fitness-for-duty Program Performance Data for Period Jul-Dec 1997,per 10CFR26.71(b) + (ML20203C869)
- ML20203C870 + (ML20203C870)
- NSD-NRC-97-5470, Forwards Westinghouse Responses to RAI 640.72 & RAIs 640.143 Through 640.147 Re Comments on Rev 3 of AP600 Certified Design Matl as Requested in Ltrs from Staff & 971006.Open Items 5731 & 6009-6013,closed + (ML20203C872)
- ML20203C873 + (ML20203C873)
- ML20203C875 + (ML20203C875)
- ML20203C876 + (ML20203C876)
- ML20203C878 + (ML20203C878)
- ML20203C880 + (ML20203C880)
- PNO-II-98-008, on 970327,discovered Misadministration Occurred.Patient Undergoing Gamma Knife Radiation Therapy Had Received Dose 55% Below Intended.State of Ga,Where Elekta Located Notified.Nrc Following Up to Assure Actions + (ML20203C881)
- ML20203C883 + (ML20203C883)
- IR 05000288/1999201 + (ML20203C884)
- ML20203C885 + (ML20203C885)
- ML20203C886 + (ML20203C886)
- ML20203C887 + (ML20203C887)
- ML20203C888 + (ML20203C888)