Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202H311 + (ML20202H311)
- 3F1297-33, Provides NRC W/Util Plans for Resolution of Unresolved Safety Issue (USI) A-46, Seismic Qualification of Equipment in Operating Plants & Large Bore Piping & Piping Supports + (ML20202H312)
- ML20202H316 + (ML20202H316)
- ML20202H320 + (ML20202H320)
- ML20202H322 + (ML20202H322)
- ML20202H328 + (ML20202H328)
- ML20202H330 + (ML20202H330)
- ML20202H331 + (ML20202H331)
- NG-98-0191, Informs That No Safety Valve or Safety Relief Valve Failures or Challenges Occurred During CY97,IAW W/Ts Section 6.11.e & NUREG-0737 + (ML20202H332)
- ML20202H333 + (ML20202H333)
- ML20202H335 + (ML20202H335)
- NOC-AE-000087, Forwards Copy of Renewed Permit to Dispose of Wastes from Texas Natural Resource Conservation Commission + (ML20202H336)
- ML20202H338 + (ML20202H338)
- IR 05000344/1986008 + (ML20202H339)
- ML20202H340 + (ML20202H340)
- ML20202H341 + (ML20202H341)
- ML20202H345 + (ML20202H345)
- A97074, Application for Amends to Licenses DPR-39 & DPR-48,revising TSs Using Guidance Provided in NUREG-1431 to Produce Set of Improved TSs for Zion Station + (ML20202H352)
- ML20202H354 + (ML20202H354)
- ML20202H355 + (ML20202H355)
- ML20202H360 + (ML20202H360)
- 05000220/LER-1986-003, :on 860308,attempt to Reset HPCI Following Manual Trip of Turbine Failed Because Contacts for Emergency Governor Limit Switch Did Not Change State.Caused by Stuck Plunger Assembly.Work Request Initiated + (ML20202H362)
- ML20202H364 + (ML20202H364)
- ML20202H365 + (ML20202H365)
- ML20202H366 + (ML20202H366)
- ML20202H367 + (ML20202H367)
- ML20202H368 + (ML20202H368)
- ML20202H372 + (ML20202H372)
- NUREG-0103, Safety Evaluation Supporting Relief from Inservice Insp Requirements of ASME Boiler & Pressure Vessel Code Requiring Quarterly Stroke Testing of RCS Valves & Denying Relief from Code Requirements for Valve RC-11 Testing + (ML20202H374)
- ML20202H375 + (ML20202H375)
- ML20202H376 + (ML20202H376)
- 05000373/LER-1997-037, :on 971105,DG Response Time Was Not Consistent W/Ts.Caused by Inadequate Review of Procedures.All DGs That Are Required to Be Operable at Present Time Have Had Time Delay for RHR Pumps Recalibrated + (ML20202H379)
- ML20202H380 + (ML20202H380)
- ML20202H385 + (ML20202H385)
- ML20202H388 + (ML20202H388)
- ML20202H389 + (ML20202H389)
- ML20202H393 + (ML20202H393)
- ML20202H395 + (ML20202H395)
- ML20202H399 + (ML20202H399)
- ML20202H402 + (ML20202H402)
- ML20202H403 + (ML20202H403)
- ML20202H404 + (ML20202H404)
- ML20202H405 + (ML20202H405)
- ML20202H406 + (ML20202H406)
- ML20202H409 + (ML20202H409)
- ML20202H410 + (ML20202H410)
- ML20202H411 + (ML20202H411)
- ML20202H413 + (ML20202H413)
- ML20202H414 + (ML20202H414)
- ML20202H415 + (ML20202H415)
- ML20202H416 + (ML20202H416)