Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199L937 + (ML20199L937)
- ML20199L938 + (ML20199L938)
- ML20199L940 + (ML20199L940)
- ML20199L941 + (ML20199L941)
- ML20199L942 + (ML20199L942)
- ML20199L943 + (ML20199L943)
- ML20199L944 + (ML20199L944)
- 05000454/LER-1997-020-03, :on 970930,excessive Operator Response Times Were Noted Due to Inadequate Analysis Implementation.Caused by Inadequate procedure.E-3 Was Revised to Suspend Transition to FR-P.1 + (ML20199L946)
- ML20199L947 + (ML20199L947)
- ML20199L948 + (ML20199L948)
- ML20199L950 + (ML20199L950)
- ML20199L951 + (ML20199L951)
- ML20199L953 + (ML20199L953)
- ML20199L954 + (ML20199L954)
- ML20199L955 + (ML20199L955)
- ML20199L956 + (ML20199L956)
- ML20199L957 + (ML20199L957)
- IR 05000416/1997018 + (ML20199L958)
- ML20199L960 + (ML20199L960)
- ML20199L962 + (ML20199L962)
- ML20199L963 + (ML20199L963)
- ML20199L964 + (ML20199L964)
- ML20199L966 + (ML20199L966)
- ML20199L970 + (ML20199L970)
- ML20199L971 + (ML20199L971)
- ML20199L974 + (ML20199L974)
- ML20199L975 + (ML20199L975)
- ML20199L976 + (ML20199L976)
- 05000219/LER-1997-014, :on 971021,discovered That Suppression Pool Bypass Leak Path Existed During Purging & Venting of Primary Containment.Caused by Inadequate Procedure Review.Revised Operating Procedures Re Purge & Vent Valves + (ML20199L977)
- 05000374/LER-1998-001, :on 980106,indications,isolations & Alarms Occurred Due to Trip of 2B RPS MG Set Output Breaker & Concurrent Tripping of Electrical Protection Assembly. Replaced Circuit Board Containing Overvoltage Relay + (ML20199L978)
- ML20199L980 + (ML20199L980)
- L-97-066, Forwards Revised Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, Superseding Initial Response Provided on 971106.Info Will Be Submitted to NRC by 980105 + (ML20199L981)
- ML20199L982 + (ML20199L982)
- ML20199L984 + (ML20199L984)
- ML20199L986 + (ML20199L986)
- ML20199L987 + (ML20199L987)
- ML20199L988 + (ML20199L988)
- ML20199L991 + (ML20199L991)
- IR 05000295/1986012 + (ML20199L992)
- NG-97-1957, Informs of Closure of SFP Insp Followup Items,In Response to Violations Noted in Insp Repts 50-331/96-04 & 50-331/96-06. Analysis HI-971708 Shows That DAEC Spent Fuel Can Be Safety Stored in Either Par or Holtec Racks + (ML20199L993)
- ML20199L994 + (ML20199L994)
- ML20199L996 + (ML20199L996)
- 05000454/LER-1997-021-03, :on 971028,CR Door Was Removed & non-seismically Qualified Structure Was Relied on to Maintain Pressure Boundary.Caused by Inadequate Procedure. Temporary Barrier Was Provided + (ML20199L997)
- ML20199L998 + (ML20199L998)
- ML20199L999 + (ML20199L999)
- ML20199M000 + (ML20199M000)
- ML20199M002 + (ML20199M002)
- ML20199M003 + (ML20199M003)
- ML20199M005 + (ML20199M005)
- ML20199M007 + (ML20199M007)
- ML20199M008 + (ML20199M008)