Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199J636 + (ML20199J636)
- ML20199J640 + (ML20199J640)
- ML20199J642 + (ML20199J642)
- ML20199J643 + (ML20199J643)
- ML20199J647 + (ML20199J647)
- NOC-AE-0017, Forwards Results of Control Rod Testing in Response to NRC Bulletin 96-001, Control Rod Insertion Problems. Encl Consists of Core Map,Current Unit 1 Specific Core Design Data & Units 1 & 2 Restart Evaluation Criteria + (ML20199J648)
- ML20199J649 + (ML20199J649)
- ML20199J652 + (ML20199J652)
- ML20199J654 + (ML20199J654)
- ML20199J655 + (ML20199J655)
- 05000440/LER-1986-021, :on 860602,discovered That Five Recirculation Damper Actuators in Diesel Generator Bldg Ventilation Sys Inoperable Due to Seal Failures.Caused by Expiration of Seal Life & Improper Storage & Maint.Seals Replaced + (ML20199J656)
- ML20199J657 + (ML20199J657)
- ML20199J659 + (ML20199J659)
- ML20199J662 + (ML20199J662)
- ML20199J663 + (ML20199J663)
- ML20199J665 + (ML20199J665)
- 05000416/LER-1986-020, :on 860603,discovered That Nonqualified Relay Could Cause Loss of Standby Gas Treatment Sys Safety Function During Accidents.Caused by Approved Design.Circuit Design Will Be Modified to Bypass Fan Contact + (ML20199J666)
- ML20199J669 + (ML20199J669)
- ML20199J670 + (ML20199J670)
- ML20199J675 + (ML20199J675)
- ML20199J677 + (ML20199J677)
- ML20199J680 + (ML20199J680)
- ML20199J681 + (ML20199J681)
- ML20199J684 + (ML20199J684)
- ML20199J685 + (ML20199J685)
- ML20199J686 + (ML20199J686)
- ML20199J687 + (ML20199J687)
- ML20199J690 + (ML20199J690)
- 05000334/LER-1998-029, :on 981218,inadequate Meterological Instrumentation Calibr Led to Failure to Comply with Tss.Caused by Human Error.Current Wind Direction Sensor Was Replaced.With + (ML20199J691)
- ML20199J692 + (ML20199J692)
- 05000483/LER-1986-019, :on 860606,during Mode 1,reactor Trip Occurred on Low Pressurizer Pressure.Caused by Technician Deviation from Calibr Procedure.Progressive Discipline Administered. Guidelines Given to Technicians + (ML20199J694)
- ML20199J695 + (ML20199J695)
- ML20199J696 + (ML20199J696)
- ML20199J698 + (ML20199J698)
- ML20199J699 + (ML20199J699)
- 05000269/LER-1986-007-02, :on 860502,discovered That Two Channels of Reactor Protective Sys (RPS) Inoperable at Same Time During Adjustment of hi-flux Trip Setpoint.Caused by Failure to Properly Tag Inoperable Module in RPS Cabinet + (ML20199J700)
- ML20199J701 + (ML20199J701)
- ML20199J706 + (ML20199J706)
- 05000482/LER-1986-073-01, Forwards LER 86-073-01,re Event in Which Wolf Creek TSs Were Not Met.Commitments Made by Util,Encl + (ML20199J709)
- ML20199J710 + (ML20199J710)
- ML20199J711 + (ML20199J711)
- ML20199J713 + (ML20199J713)
- ML20199J717 + (ML20199J717)
- ML20199J718 + (ML20199J718)
- ML20199J719 + (ML20199J719)
- ML20199J721 + (ML20199J721)
- ML20199J724 + (ML20199J724)
- ML20199J725 + (ML20199J725)
- ML20199J727 + (ML20199J727)
- 05000482/LER-1986-073, :on 860102,leak Rate Testing of Containment H Purge Sys Was Not Performed IAW All Requirements of TS 3.6.1.7.Cause Identified as Mindset.Revised Procedure & SAR Changes + (ML20199J728)
- GO2-98-016, Informs That Commitment to Perform Chemical Decontamination of Reactor Recirculation Sys Discharge Piping During R13 Outage in Spring 1998,is Modified.Chemical Decontamination Will Not Be Performed During R13 Outage + (ML20199J730)