Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199G052 + (ML20199G052)
- ML20199G053 + (ML20199G053)
- ML20199G054 + (ML20199G054)
- BSEP-97-0459, Requests Approval to Use Alternative Requirements for ISI Delineated in ASME Section XI Code Case N-535.Alternative Is Needed to Extend Third Period of Second ten-yr ISI Interval to Coincide W/End of Bsep,Unit 1,refueling Outage 11 + (ML20199G055)
- ML20199G058 + (ML20199G058)
- ML20199G060 + (ML20199G060)
- ML20199G061 + (ML20199G061)
- ML20199G064 + (ML20199G064)
- PNO-III-98-045, on 980914,empty Type B Shipping Cask Received with Removable Contamination Levels of Approx 40,000 Dpm Per 100 Square Centimeters.Licensee Decontaminated Cask + (ML20199G066)
- RA99-006, Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents + (ML20199G069)
- ML20199G070 + (ML20199G070)
- B16858, Forwards Change to Commitment Made by Util in Response, & Revised in Response to Recommendations Made by Little Harbor Consultants,Inc During 970722 Meeting. Revised Commitment,Listed + (ML20199G071)
- ML20199G072 + (ML20199G072)
- ML20199G074 + (ML20199G074)
- ML20199G076 + (ML20199G076)
- IR 05000327/1997017 + (ML20199G078)
- ML20199G079 + (ML20199G079)
- ML20199G080 + (ML20199G080)
- ML20199G081 + (ML20199G081)
- ML20199G083 + (ML20199G083)
- ML20199G085 + (ML20199G085)
- ML20199G087 + (ML20199G087)
- ML20199G088 + (ML20199G088)
- ML20199G089 + (ML20199G089)
- ML20199G092 + (ML20199G092)
- ML20199G094 + (ML20199G094)
- ML20199G096 + (ML20199G096)
- ML20199G099 + (ML20199G099)
- ML20199G100 + (ML20199G100)
- ML20199G101 + (ML20199G101)
- ML20199G102 + (ML20199G102)
- ML20199G104 + (ML20199G104)
- 3F0199-06, Responds to NRC 981002 RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Util Concurs with NEI Generic Industry Response to NRC Rai. Plant-specific Response,Encl + (ML20199G106)
- ML20199G107 + (ML20199G107)
- ML20199G109 + (ML20199G109)
- 3F0198-46, Provides Notification That Commitment Due Date Re Response to NOV Identified in Insp Rept 50-302/97-10 Concerning Installation of Video Capture Sys Being Extended to 980214 + (ML20199G110)
- ML20199G112 + (ML20199G112)
- ML20199G113 + (ML20199G113)
- BVY-97-152, Submits Outline of Utils Plans to Resolve Issues Dealing W/ Containment & Preservation of NPSH Margins for ECCS Pumps IAW Commitment to Provide Integrated Status of Containment Initiatives in Response to URI 97-201-02 in + (ML20199G115)
- ML20199G116 + (ML20199G116)
- 05000461/LER-1998-037, :on 981215,identified That SR 3.3.3.1.2,which Requires Channel Calibr of Drywell & Primary Containment Hydrogen & Oxygen Analyzers Not Properly Implemented.Caused by Lack of Info Validation & Verification.Procedure Revised + (ML20199G117)
- ML20199G118 + (ML20199G118)
- ML20199G119 + (ML20199G119)
- PY-CEI-NRR-2355, Submits Supplemental Info to Licensee 980903 Lar,Requesting Extension of EDG TS Action Statement to Fourteen Days for Division 1 & 2 Edg.Attachment 1 Addresses Questions Discussed in 981217 Telcon with NRC + (ML20199G122)
- ML20199G124 + (ML20199G124)
- ML20199G125 + (ML20199G125)
- IR 05000395/1986005 + (ML20199G126)
- NSD-NRC-97-5444, Forwards Response to Roof Slab Question Generated During Meetings Between NRC & W During Aug 1997.Question Identified as Item 7 in Attachment 8 of NRC Meeting Summary,Dtd 970930. W Status Will Be Changed to Action N + (ML20199G128)
- ML20199G129 + (ML20199G129)
- ML20199G130 + (ML20199G130)
- ML20199G132 + (ML20199G132)