Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F902 + (ML20199F902)
- ML20199F904 + (ML20199F904)
- ML20199F905 + (ML20199F905)
- ML20199F907 + (ML20199F907)
- ML20199F911 + (ML20199F911)
- ML20199F913 + (ML20199F913)
- ML20199F919 + (ML20199F919)
- ML20199F921 + (ML20199F921)
- 05000321/LER-1986-023, :on 860515,reactor Scram Occurred While Personnel Returning Main Steam Line Transmitter to Svc. Caused by Procedural Inadequacy.Transmitter Properly Filled, Vented & Placed Into Svc + (ML20199F922)
- ML20199F923 + (ML20199F923)
- ML20199F925 + (ML20199F925)
- IR 05000324/1998002 + (ML20199F926)
- IR 05000344/1997004 + (ML20199F929)
- ML20199F931 + (ML20199F931)
- ML20199F936 + (ML20199F936)
- ULNRC-03947, Provides follow-up Response to Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Info Specifically Addresses Callaway Plant + (ML20199F937)
- ML20199F938 + (ML20199F938)
- ML20199F941 + (ML20199F941)
- 05000286/LER-1986-002-01, :on 860518,during Main Turbine Vibration Test, Reactor Tripped on Steam Flow/Feedwater Flow Mismatch Signal.Caused by Air Caught in Flow Transmitters Due to Insufficient Blowdown.Operators Counseled + (ML20199F942)
- CY-98-005, Forwards Volumes 1-3 to Decommissioning UFSAR, Which Accurately Presents Changes Completed Since Previous Submittal.Ufsar Will Be Updated IAW 10CFR50.71(e)(4),as Plant Continues to Recategorize Structures,Sys & Components + (ML20199F943)
- SVP-98-377, Provides Summary of NRC Commitments Completed During 15th Refueling outage,Q1R15 + (ML20199F945)
- ML20199F949 + (ML20199F949)
- ML20199F951 + (ML20199F951)
- TXX-4855, Interim Deficiency Rept CP-86-37 Re Class 1E Battery Charger Firing Board Assemblies & Amplifier Boards Not Conforming to Vendor Assembly Drawings.Evaluation Continuing.Next Rept Will Be Submitted by 860716 + (ML20199F952)
- ML20199F953 + (ML20199F953)
- 05000413/LER-1998-018-01, :on 981214,identified That There No Single Procedure That Specifically Verified Response Time for Two SI RT Functions.Caused by Inadequate Procedures.Procedures Will Be Revised &/Or Developed.With + (ML20199F954)
- ML20199F957 + (ML20199F957)
- ML20199F958 + (ML20199F958)
- ML20199F959 + (ML20199F959)
- 05000322/LER-1986-013, :on 860305,fire Watch in Relay Room Found Asleep.Caused by Personnel Error.Individual Terminated + (ML20199F960)
- ML20199F961 + (ML20199F961)
- ML20199F962 + (ML20199F962)
- 05000373/LER-1986-019-02, :on 860521,RCPB Pipe Leaks Found Coming from RHR Loop Injection Piping.Possibly Caused by Entrapped Slag or Other Defect in Plug Seal Weld.Coupling Will Be Capped + (ML20199F963)
- NOC-AE-000398, Notifies NRC That Assessments of Effects of Fuel Rod Internal Pressure on 17% Oxidation Criterion of 10CFR50.46 Will Continue for Future Refueling Cycles Until Industry Issue Is Resolved + (ML20199F964)
- ML20199F967 + (ML20199F967)
- ML20199F969 + (ML20199F969)
- IR 05000373/1997013 + (ML20199F974)
- ML20199F975 + (ML20199F975)
- ML20199F977 + (ML20199F977)
- ML20199F979 + (ML20199F979)
- 05000352/LER-1986-015, :on 860304,main Control Room Ventilation Sys Isolated & Train B of Control Room Emergency Fresh Air Sys Started.Caused by Breakage of Chlorine Analyzer Tape D. Chlorine Detection Sys Temporarily Installed + (ML20199F980)
- ML20199F981 + (ML20199F981)
- 05000289/LER-1998-014-01, :on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With + (ML20199F983)
- ML20199F986 + (ML20199F986)
- ML20199F988 + (ML20199F988)
- ML20199F989 + (ML20199F989)
- ML20199F990 + (ML20199F990)
- ML20199F991 + (ML20199F991)
- ML20199F993 + (ML20199F993)
- ML20199F995 + (ML20199F995)
- ML20199F996 + (ML20199F996)