Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A339 + (ML20199A339)
- ML20199A342 + (ML20199A342)
- ML20199A343 + (ML20199A343)
- ML20199A345 + (ML20199A345)
- PNO-IV-98-004, on 980123,representative of Terraco Co,Inc Notified NRC Operations Ctr of Theft of Portable Moisture/ Density Gauge in Tulsa,Ok.Operator Secured Gauge within Transport Container to Bed of Truck Using Chain & Padlock + (ML20199A347)
- ML20199A348 + (ML20199A348)
- ML20199A350 + (ML20199A350)
- ML20199A352 + (ML20199A352)
- IR 05000440/1997309 + (ML20199A354)
- ML20199A355 + (ML20199A355)
- ML20199A356 + (ML20199A356)
- IR 05000333/1997201 + (ML20199A357)
- ML20199A358 + (ML20199A358)
- ML20199A361 + (ML20199A361)
- ML20199A362 + (ML20199A362)
- ML20199A363 + (ML20199A363)
- ML20199A368 + (ML20199A368)
- ML20199A369 + (ML20199A369)
- PNO-IV-98-005, on 980116,Troxler Model 3411B,containing 40 Mci of Am-241 & 8 Mci of Cs-137 Stolen from State of Wa Licensee.Gauge Taken from Bed of Pickup Truck Parked in Front of Authorized Gauge User House in Tacoma + (ML20199A370)
- ML20199A371 + (ML20199A371)
- ML20199A374 + (ML20199A374)
- ML20199A375 + (ML20199A375)
- ML20199A377 + (ML20199A377)
- ML20199A379 + (ML20199A379)
- IR 07100007/2011024 + (ML20199A381)
- ML20199A383 + (ML20199A383)
- ML20199A384 + (ML20199A384)
- ML20199A385 + (ML20199A385)
- RBG-44284, Forwards Proprietary TR NEDC-32640P, RBS SAFER/GESTR-LOCA LOCA Analysis, Dtd June 1997 Which Contains Plant Specific Analyses Prepared by GE in Support of Change to RBS LOCA Evaluation Model.Affidavit Encl.W/O Proprietary Rept + (ML20199A393)
- ML20199A394 + (ML20199A394)
- ML20199A400 + (ML20199A400)
- 05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl + (ML20199A402)
- ML20199A404 + (ML20199A404)
- ML20199A409 + (ML20199A409)
- ML20199A411 + (ML20199A411)
- ML20199A413 + (ML20199A413)
- ML20199A414 + (ML20199A414)
- ML20199A415 + (ML20199A415)
- ML20199A419 + (ML20199A419)
- ML20199A420 + (ML20199A420)
- ML20199A424 + (ML20199A424)
- ML20199A425 + (ML20199A425)
- 3F1197-41, Forwards Corrected First Page to Re Response to RAI for LAR 218,rev of Makeup Sys Letdown Line Failure Accident Analysis + (ML20199A428)
- ML20199A433 + (ML20199A433)
- ML20199A435 + (ML20199A435)
- ML20199A438 + (ML20199A438)
- ML20199A439 + (ML20199A439)
- ML20199A441 + (ML20199A441)
- L-98-015, Requests NRC Review & Approval of Proposed Change to BVPS Unit 1 Ufsar.Proposed Rev to UFSAR Change to Address Recent Rev to CR Radiological Dose Calculations + (ML20199A442)
- 05000269/LER-1997-003-01, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action + (ML20199A443)
- NPL-99-0010, Requests Enforcement Discretion from Specific Plant TS Requirements Re Inoperability of Both SI & Both CS Pumps for Unit 1.Subject Pumps Were Declared Inoperable Upon Discovery of Failed Freeze Protection Circuit + (ML20199A444)