Forwards Insp Rept 50-461/97-22 on 971007-1124 & Notice of Violation.Improvements Were Noted in Quality of Audits Conducted by QA Personnel
ML20199A374
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/22/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
ILLINOIS POWER CO.
Shared Package
ML20199A378 List:
References
50-461-97-22, NUDOCS 9801270200
Download: ML20199A374 (4)


See also: IR 05000461/1997022

Text

_

i

.,

  • .

i

December 22,1997

Mr. John G. Cook

Senior Vice President

Clinton Power Station

i

Illinois Power Company

Mall Code V 275

P. O. Box 678

Clinton, IL 61727

i

SUBJECT:

NRC INSPECTION REPORT NO. 50-461/97022(DRP) AND NOTICE OF

$

VIOLATION

!

t

Dear Mr. Cook:

On November 25,1997, the NRC completed an inspection at your Clinton Fac:lity. The

enclosed report presents tha results of that inspection.

During the period covered by this inspection, improvements were noted in the quality of the

audits conducted by your quality assurance personnel, in addition, hydramotor work was

stopped by workers when procedure revisions were needed. However, continuing examples

,

of the failure to thoroughly evaluate, properly p-lorltize and effectively correct identified

problems were noted. For example, a narrowly focused review of the 480 volt motor over-

gressing !ssue led to a 7 week delay in performing an operability determination for these

motors.

,

In addition, we are concemed about three violations of NRC requirements that were

identified, in the first violation, Technical Specification required actions when a limiting

condition for operation was not met were not implemented on two occasions. On the first

occasion, improper verification of an attemate decay heat removal source resulted in not

1

identifying that a valve had been mispositioned for approximately 3 months. On the second

occasion, actions were not pursued to resolve 4160V breaker deficiencies without delay.

i

This violation is of concern because operations personnel were unaware that Technical

Specification required actions had not been performed,

in the second violation, NRC inspectors idr/ofied that vendor manuals supplied with

maintenance and test equipment were not controlled as required by 10 CFR Part 50,

. Appendix B, Criterion VI. Specifically, your procedure for processing vendor information did

not require measurement and test equipment vendor manuals to be controlled documents

even though the manuals were used in the performance of work activities. This violation is

of concern because it represents a continued problem with providing controlled documents

for maintenance and surveillance activities,

,

In the third violation; NRC inspectors identified that work instructions for repairing safety

related hydramotors were inconsistent and not prepared as required by procedure.

' Although a specific procedure for the repair and overhaul of hydramotors existed, the

maintenance work package allowed the work to be performed under broad work instructions

'

- and enclosed the specific procedure as a reference document. This violation is of concem

because detailed work

l

-

g s ggg m gg t

S,,Mna..mL2

-

i

.

G

PDR

-

,

_ . _

_

..

_

__ _ ____.. . _ _ _ _ _

_ ...___ .

_. .

__ . _ _ _ _ _

,J. Cook

2

'

i

.

Instructions were not inci' ded to ensure that maintenance work activities were properly

[

controlled,

j

'

The violations are cited in the enclosed Notice of Violation (Notice), and the circumstaneet,

surrounding the violations are described in detail in the enclosed raport. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement actions are necessary to ensure compliance with

regulatory requirements.

j

in accordance with 10 CFR 2.790 of the NRC's Rules of Practice, a copy of this letter, its

!

enclosures, and your response will be placed in the NRC Public Document Room.

,

Sincerely,

i

/s/ John A. Grobe

l

John A. Grobe, Director

Division of Reactor Safety

Docket No.: 50-461

<

License Nos.:

NPF-62

j

Enclosures:

1, Notice of Violation

2. Inspection Report

No. 50-461/97022(DRP)

cc w/encls:

W. Di Romberg, Assistant

!

Vice President

R. Phares, Manager, Nuclear Safety

and P 'ormanca Improvement

J, Sipek, Director Licensing

Nathan Schloss, Economist

Office of the Attomey General

G. Stramback, Regulatory Licensing

Services Project Manager

General Electric Company

Chairman, DeWitt County Board

State Liaison Officer

Chairman, Illinois Commerce Commission

t

.

.

._

-

..

,_ __

_

.- -

_ _ = - . _ - _ - -

. . _ _ - _

- _

-

_.

-

.

-

. _ . -

,J, Cook

2

,

instructions ' vere not includod to ensure that maintenonce work activitie6 were properiy

controlled.

l

The violations are cited in the enclosed Notice of Violation (Notice), and the evcumstances

surrcunding the violations are described in detailin the enclosed report. Pier

note that

you sire required to respond to this letter and should follow the instructions s.

1 in the

enclosed Notice when preparing your response. The NRC will use your resp ,e, in part,

to determine whether further enforcement actions are necessary to ensure compliance with

regulatory requirements.

In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice /' a copy of this letter, its

enclosures, and your response will be placed in tM NRC Public Document Room.

Sincerely,

/s/ John A. Grobe

j

JoM A. Grobe, Director

Division of Reactor Safety

1

Docket No.:

50-461

License Nos.:

NPF 62

Enclosures:

1, Notice of Violation

2. Inspection Report

'

No. 50-461/97022(DRP)

cc w/encis:

W. D. Romberg, Assistant

Vice President

R. Phares, Manager, Nuclear Safety

and Performance Improvement

J. Sipek, Director - Licensing

'

Nathan Schloss, Economist

Office of the Attomey General

G. Stramback, Regulatory Licensing

i

Services Project Manager

General Electric Company

Chairman, DeWitt County Board

.

State Liaison Officer

i

Chairman, Illinois Commerce Commission

DOCUMENT N AME: : G:\\ clin \\cli97022. den

T. ,. *. . . , .nw un.ni, we.. m in. w. c . c#, wa.ui .u

h.nv.n.w.u,. e - Copy Ah .tt..hmentlencio.u,.

I

v . w. =,

1 OFFICE

Rlli

l

Rill

Rill

l

l

[NAME

Kozak/co

Creed-

Grobe

lDATE

01/ /98

01/ /98

01/ /98

OFFICIAL RECOF;D COPY

I

.

_ ~ _ . _ _ .

.

_ . _ _ _ . . _ _ _ _ . _ _ _ _ _ _ . . - _ _ _ . _ . . _ _ _ . _ . . _ . _ . _ _ _ _ _ . . _ _ . ..

-
J. Cook

3

!

I

!

'

Distnbution:

Docket File w/ encl

DRP w/ encl

i

SRI Clinton w/ encl

PUBLIC IE 01 w/encI

i

Project Manager, NRR w/ encl

Rlli PRR w/enci

Rlli Enf Coordinator w/ encl

CAA1 w/enci (E-mail)

.

.TSS w/ encl

A. B. Beach w/enci

'

-

)

DOCDESK '(E mail)

Deputy RA w/enci

l

DRS (2) w/enci

j

i

'

.

h

8

t

s

i.

-

t

,

i

I

,

d

'

+

L

'

,

1

.

'

a

'

i

f

9

t

I

_

_

i

?

'

E

>

t

t

t

-

-

.f

-- .

.

..

.

. . . , . .

- , ,

.,,,....,.-,-,,,--..-,u-,-.

,..,,-,-,-,,-n.

. . - , , ,

,-n

-