ML20199A339

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-440/97-309OL on 970825-30 Administered to Nine License Applicants.Two Applicants Failed to Meet NRC Std for Licensing & Denied Licenses.All Other Applicants Passed & Issued Licenses
ML20199A339
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/10/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20199A336 List:
References
50-440-97-309OL, NUDOCS 9711170145
Download: ML20199A339 (3)


See also: IR 05000440/1997309

Text

s

e

November 10,_1997

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT: OPERATOR LICENSING EXAMINATION REPORT 50-440/97309(OL)

Dear Mr. Myers:

On August 30,1997, the NRC completed initial operator licensing examinations at your Perry

Nuclear Power Plant. The license applicants' performance evaluations were finalized on

October 16,1997. The enclosed report pressats the results of the examinations.

Operating and written examinations were administered to nine ilcense applicants; two at the

Reactor Operator level and seven at the Senior Reactor Operator level. Two applicants failed

to meat the NRC's standard for licensing and were denied licenses. All other license applicants

passed all sections of their respective examinations and were issued Reactor Operator or

Senior Reactor Operator licenses.

This examination was the first opportunity your training cepartment personnel have had to

propare an operator licenso examination under the NRC's initial license examination pilot

process fhe pilot process allowed your training personnel to prepare and administer the

written examination and prepare the operating examination for NRC examiners to administer.

Your training department is to be commended for the examination produced for this initial

license examination. The examination submitted to Region lli was of high quality and required

only minor changes.

In accordance with 10 CFR 2.790 of the Commission't regulations, a copy of this letter and the

enclosures to this letter will be placed in the NRC Public Document Room.

97 11{0 M ySbOO 40

PDR

1 \

v .

.

.

L W. Myers 2 November 10, 1997

We will gladly discuss any questions you have concerning this examination.

Sincerely

Original Signed by John A. Giobe

John A. Grobe, Director

Division of Reactor Safety

Docket No. 50-440

Enclosures: 1. Inspection Report 50-440/97309(OL)

2. Simulator Fidelity Report

3. Written Examinations & Answer Keys (RO/SRO)

4. Written Examination Analysis

cc w/encls 1,2 & 3: H. L. Hegrat, Manager, Regulatory Affairs

T. S. Rausch, Director. Quality and

Personnel Development

R. W. Schrauder, Director, Perry

Nuclear Engineering Department

W. R. Kanda, General Manager.

Nuclear Power Plant Department

N. l.. Bonner, Director, Nuclear

Maintenance Department

H. W. Bergendahl, Director, Nuclear

Services Department

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

Public Ut:lities Commission

Roy P. Lessy, Jr., Esq.

ec w/encls 1,2,3 & 4: E. M. l'oot, Plant Training Manager

DOCUMENT NAME: G:DRS\PER97309.0L

To receive a copy of this document, Indicate in the box "C" = Copy w/o attach /enci"E" =

Copy w/ attach /enci "N" = No copy ,

OFFICE Rill l9 Rlli lv Rill /l Rllh.J)\ l

NAME DMcNeil:Jp P MLeach /M/. GWrighpfj JGlot\F

DATE 10Mf97 16/4/97 1$/6497 1$/io/$7

OFFICIAL RECORD COPY

.

. .

. . . .. . -. - . .

-. ,

.

i

'

L - W.i Myers 3

November 10. 1997

7

'

DjalubMOD' . .

.

D%*et File w/encls 1,2, & 3 - Rill PRR w/encls 1,2 & 3

PUBLIC IE-42 w/encls 1,2,3 & 4 Rlll Enf. Coordinator w/encls 1,2 & 3

SRI, Perry w/encls 1,2 & 3 TSS w/encls 1,2 & 3

- OCFO/LFARB w/encls 1,2 & 3 LPM. NRR w/encls 1,2 & 3 .

DRP w/encls 1,2 & 3 A.- B. Beach, Rill w/encls 1,2 & 3'-

DRS w/encls 1,2 & 3 - - J. L. Caldwell, Rlli w/encls 1,2 & 2

CAA1 e-mail DOCDESK a-mail

.

I

r

V

.