ML20199A339
| ML20199A339 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/10/1997 |
| From: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20199A336 | List: |
| References | |
| 50-440-97-309OL, NUDOCS 9711170145 | |
| Download: ML20199A339 (3) | |
See also: IR 05000440/1997309
Text
s
e
November 10,_1997
Mr. Lew W. Myers
Vice President - Nuclear
Centerior Service Company
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
OPERATOR LICENSING EXAMINATION REPORT 50-440/97309(OL)
Dear Mr. Myers:
On August 30,1997, the NRC completed initial operator licensing examinations at your Perry
Nuclear Power Plant. The license applicants' performance evaluations were finalized on
October 16,1997. The enclosed report pressats the results of the examinations.
Operating and written examinations were administered to nine ilcense applicants; two at the
Reactor Operator level and seven at the Senior Reactor Operator level. Two applicants failed
to meat the NRC's standard for licensing and were denied licenses. All other license applicants
passed all sections of their respective examinations and were issued Reactor Operator or
Senior Reactor Operator licenses.
This examination was the first opportunity your training cepartment personnel have had to
propare an operator licenso examination under the NRC's initial license examination pilot
process fhe pilot process allowed your training personnel to prepare and administer the
written examination and prepare the operating examination for NRC examiners to administer.
Your training department is to be commended for the examination produced for this initial
license examination. The examination submitted to Region lli was of high quality and required
only minor changes.
In accordance with 10 CFR 2.790 of the Commission't regulations, a copy of this letter and the
enclosures to this letter will be placed in the NRC Public Document Room.
97 11{0 M ySbOO 40
\\
1
.
v
.
.
L W. Myers
2
November 10, 1997
We will gladly discuss any questions you have concerning this examination.
Sincerely
Original Signed by John A. Giobe
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-440
Enclosures:
1. Inspection Report 50-440/97309(OL)
2. Simulator Fidelity Report
3. Written Examinations & Answer Keys (RO/SRO)
4. Written Examination Analysis
cc w/encls 1,2 & 3:
H. L. Hegrat, Manager, Regulatory Affairs
T. S. Rausch, Director. Quality and
Personnel Development
R. W. Schrauder, Director, Perry
Nuclear Engineering Department
W. R. Kanda, General Manager.
Nuclear Power Plant Department
N. l.. Bonner, Director, Nuclear
Maintenance Department
H. W. Bergendahl, Director, Nuclear
Services Department
Terry L. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
C. A. Glazer, State of Ohio
Public Ut:lities Commission
Roy P. Lessy, Jr., Esq.
ec w/encls 1,2,3 & 4:
E. M. l'oot, Plant Training Manager
DOCUMENT NAME: G:DRS\\PER97309.0L
To receive a copy of this document, Indicate in the box "C" = Copy w/o attach /enci"E" =
Copy w/ attach /enci "N" = No copy
,
OFFICE
Rill
l9
Rlli
lv
Rill
/l
Rllh.J)\\
l
NAME
DMcNeil:Jp P
MLeach /M/.
GWrighpfj
JGlot\\F
DATE
10Mf97
16/4/97
1$/6497
1$/io/$7
OFFICIAL RECORD COPY
.
.
.
. .
. ..
.
-.
-
.
.
- .
,
.
i
L - W.i Myers
3
November 10. 1997
'
7
'
DjalubMOD' .
.
.
D%*et File w/encls 1,2, & 3
- Rill PRR w/encls 1,2 & 3
PUBLIC IE-42 w/encls 1,2,3 & 4
Rlll Enf. Coordinator w/encls 1,2 & 3
SRI, Perry w/encls 1,2 & 3
TSS w/encls 1,2 & 3
- OCFO/LFARB w/encls 1,2 & 3
LPM. NRR w/encls 1,2 & 3 .
DRP w/encls 1,2 & 3
A.- B. Beach, Rill w/encls 1,2 & 3'-
DRS w/encls 1,2 & 3 -
- J. L. Caldwell, Rlli w/encls 1,2 & 2
CAA1 e-mail
DOCDESK a-mail
.
I
r
V
.
.
..
. .
,