ML20199A379

From kanterella
Jump to navigation Jump to search
Informs That Nuclear Densitometer That Was Installed at Consolidation Coal Co Loveridge Preparation Plant, Mannington,Wv Under Temporary Asssignment Is Now to Be Considered Permanent Installation at Location
ML20199A379
Person / Time
Issue date: 10/10/1990
From: Scandrol R
CONSOL, INC. (FORMERLY CONSOLIDATION COAL CO.)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
SSD, NUDOCS 9901130003
Download: ML20199A379 (1)