Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198R286 + (ML20198R286)
- ML20198R289 + (ML20198R289)
- ML20198R293 + (ML20198R293)
- PNO-III-83-065, on 830727,licensee Determined That All 3 EDGs Associated W/Unit 2 Were Technically Inoperable Since Required Surveillance Testing Had Not Been Conducted within Proper Time Frame.State of Il Notified + (ML20198R294)
- ML20198R295 + (ML20198R295)
- ML20198R297 + (ML20198R297)
- ML20198R301 + (ML20198R301)
- ML20198R304 + (ML20198R304)
- ML20198R305 + (ML20198R305)
- ML20198R306 + (ML20198R306)
- ML20198R308 + (ML20198R308)
- ML20198R312 + (ML20198R312)
- PNO-II-83-086, on 831102,employee of Moser Iron Works Was Fatally Injured When He Fell 27 Feet from Structural Beam in Unit 2 Containment Building.Licensee Responding to Inquiries.Nrc Does Not Plan News Release + (ML20198R314)
- PNO-II-83-081, on 831012,FPL Took Unit Out Svc Because of Failure of One of Two Rhrps.Determined Rhrp Failure on 831011 Was Due to Short Circuit Caused by Water in Terminal Box Which Houses Pump Motor Leads + (ML20198R316)
- ML20198R318 + (ML20198R318)
- PNO-II-83-076, on 830916,licensee Reported That I-131 Was Detected Being Released from Auxiliary Building Exhaust at Rate 2.22 Times 15 Minute Average Release Limit Allowed.No Limits Exceeded at Site Boundary & No Emergency Declared + (ML20198R319)
- ML20198R320 + (ML20198R320)
- PNO-II-83-058, on 830809,St Lucie Unit 2 Completed 100-hour Test Run at Full Power.Test Was Culmination of Power Ascension Testing Which Began After Full Power License Was Issued on 830610.Placed Into Commercial Operation on 830808 + (ML20198R322)
- ML20198R323 + (ML20198R323)
- ML20198R325 + (ML20198R325)
- IR 07100104/2012030 + (ML20198R332)
- ML20198R333 + (ML20198R333)
- ML20198R334 + (ML20198R334)
- ML20198R339 + (ML20198R339)
- ML20198R341 + (ML20198R341)
- ML20198R343 + (ML20198R343)
- ML20198R344 + (ML20198R344)
- ML20198R345 + (ML20198R345)
- ML20198R348 + (ML20198R348)
- ML20198R351 + (ML20198R351)
- ML20198R357 + (ML20198R357)
- ML20198R360 + (ML20198R360)
- ML20198R362 + (ML20198R362)
- AECM-86-0142, Forwards Info Re Shift Technical Advisor Function at Facility,In Response to Generic Ltr 86-04, Policy Statement on Engineering Expertise on Shift. Current Program for Providing Engineering Expertise on Shift Described + (ML20198R363)
- B16948, Provides 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (ML20198R366)
- ML20198R371 + (ML20198R371)
- ML20198R373 + (ML20198R373)
- ML20198R376 + (ML20198R376)
- ML20198R377 + (ML20198R377)
- ML20198R379 + (ML20198R379)
- ML20198R381 + (ML20198R381)
- ML20198R382 + (ML20198R382)
- ML20198R384 + (ML20198R384)
- ML20198R385 + (ML20198R385)
- ML20198R390 + (ML20198R390)
- ML20198R392 + (ML20198R392)
- ML20198R394 + (ML20198R394)
- IR 05000184/1997202 + (ML20198R398)
- ML20198R399 + (ML20198R399)
- ML20198R402 + (ML20198R402)
- ML20198R405 + (ML20198R405)