ML20198R312
| ML20198R312 | |
| Person / Time | |
|---|---|
| Site: | Paducah Gaseous Diffusion Plant |
| Issue date: | 01/13/1998 |
| From: | Ting P NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | John Miller UNITED STATES ENRICHMENT CORP. (USEC) |
| Shared Package | |
| ML20070L215 | List: |
| References | |
| 70-7001-97-210, NUDOCS 9801230280 | |
| Download: ML20198R312 (2) | |
Text
_ _ _ - _ _ _ _
- DECONTRHLLED WHEN 2.790 INFORMATION IS REMOVED i
DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION unuary 13, 1998 I
Mr. J. H. Miller
?
Vice President, Production I
United States Enrichrnent Corporation Two Democracy Center -
6903 Reckledge Drive Bethesda, MD 20817
SUBJECT:
INSPECTION NO. 70 7001/97-210
Dear Mr. Miller:
The Nuciaar Regulatory Commission (NRC) conducted a routine inspection of your Paducah, Kentucky uranium enrichment fccility's material control and accounting (MC&A) _ safeguards program on December 15 - 19,1997. The inspection focused on the core procedures which the NRC considers critical to implementing your Fundemental Nuclear Material Control Plan commitments. The scope, details and results of the inspection are contained in the enclosurs At the conclusion of the inspection, the findings were discussed with members of your staff.
'Vithin the scope of the inspection, no violations were identified. Ten prior followup items were ievisited, and seven were closed. The three open issues are described in the summary and detail of the attached inspection report.
As requested by the United States Enrichrr. ant Corporation (USEC) and granted by the NRC, reports containing information related to USEC's MC&A program are exempt from public disclosure. Accordingly, the enclosure wikat be placed in the Public Document Room.
Sincerely, Philip Ting, Chief Operations B'anch(Original /s/ by)
Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-7001
Enclosure:
As stated cc w/ enclosure:
H H E' M lll1 M l Il J. A. Labarraque, Manager, Safety, Safeguards and Quality, USEC H H und sus e u[~
IN DISTRIBUTION:
FCOB r/f LDOng, FCOB MHorn. FSPB MMessier (w/o enc!), T9E10.
gIcp/h O'Bnen. Rill RPierson.
FSPB FCSS r/f NWISS r/f Case File
" Soc.etEr" FN.E 7o. 7o a f.
SCaudill PHdand. Rlli MRodgers (wlo encl)
YFaraz. FSPB TPham. FCLB DHartland, Rill AD A,. t. AD C t 3h Mm s'\\Whaley\\pgdp210 ed OFC FCOB h
FCOB E
FCOB E
FCOB FCOB 2~
FCOB NAME THarich EEckfeld/ b DWhilkk WTroskoski.
PTing rj')
DATE 0;
U1-01/[l98-
' 0117/98 0114/9 01/1798 C= COPY E m COVER & ENCLOSURE N = NO COPY g2@
Eh ICIAL RECORD COPY-C PDR gu y a ut:UUN I RULLt:0 WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION 7
At*
6r c/;
CAltf%t 6 //)&
T l v/o gf
h DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED l
/#00CgMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION 4
UNITED STATES 0-l e g
g NUCLEAR F1EGULATORY COMMISSI3N W ASHINGTON, D.C. 2056Mm01 o
January 13, 1998 Mr. J. H. Miller Vice President, Production United State s Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
INSPECTION NO. 70-7001/97-210
Dear Mr. Miller:
The Nuclear Regulatory Commission (NRC) conducted a routine inspection of your Paducah, Kentucky uranium enrichment facility's rr.aterial control and accounting (MC&A) safeguards pro 0 ram on December 15 - 19,1997. The inspection focused on the core procedures which the NRC considers critical to implementing your Fundamental Nuclear Material Control Plan commitments. The scope, details and results of the inspection are contained in the enclosure.
At the conclusion of tr.e inspection, the findings were discussed with members of your staff.
Within the scope of the inspection, no violations were identified. Ten prior followup items were revisited, and seven were closed. The three open issues are described in the summary and detail of the attached inspection report, As requested by the United States Enrichment Corporation (USEC) and granted by the NRC, reports containing information related to USEC's MC&A program are exampt from public disuosure. Accordingly, the enclosure will not be placed in the Public Document Room.
Sincerely, 9
/'
o l
Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-7001-
Enclosure:
As stated cc w/ enclosure:
J. A. Labarraque, Manager, Safety, Safeguaras and Quality, USEC Y
DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION l