Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198R208 + (ML20198R208)
- ML20198R209 + (ML20198R209)
- ML20198R212 + (ML20198R212)
- ML20198R213 + (ML20198R213)
- IR 05000293/1986008 + (ML20198R215)
- ML20198R216 + (ML20198R216)
- ML20198R217 + (ML20198R217)
- ML20198R220 + (ML20198R220)
- ML20198R221 + (ML20198R221)
- ML20198R223 + (ML20198R223)
- PNO-IV-84-013E, on 840618 Level of Missouri River at Site Was 897-25 Feet Above Mean Sea Level.Licensee Maitaining All Flood Preparations in State of Readiness + (ML20198R224)
- ML20198R227 + (ML20198R227)
- ML20198R230 + (ML20198R230)
- ST-HL-AE-1672, 1985 Preoperational Radiological Environ Monitoring Rept + (ML20198R231)
- ML20198R233 + (ML20198R233)
- ML20198R238 + (ML20198R238)
- ML20198R242 + (ML20198R242)
- 05000302/LER-1997-034, :on 971008,nonconservative Assumption in Breaker Setpoint Calculations Could Have Prevented Starting of Motor Operated Equipment.Caused by Nonconservative Assumption MCCB Setpoint Calculations.Changes Implemented + (ML20198R246)
- ML20198R249 + (ML20198R249)
- PNO-IV-84-013F, on 840621,licensee Terminated Notification of Unusual Event.Level at Site Was 896.7 Above Mean Sea Level & Slowly Dropping + (ML20198R253)
- ML20198R254 + (ML20198R254)
- ML20198R255 + (ML20198R255)
- ML20198R256 + (ML20198R256)
- ML20198R259 + (ML20198R259)
- ML20198R260 + (ML20198R260)
- ML20198R262 + (ML20198R262)
- ML20198R265 + (ML20198R265)
- B16814, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Commitments Made by Util,Encl + (ML20198R267)
- PNO-III-83-067, on 830729,licensee Reported That Employee Had Received Apparent Exposure,Based on Thermoluminescent Dectectors Worn on Finger & Eyeglasses.No Known Incident Occurred to Account for Overexposure + (ML20198R270)
- ML20198R271 + (ML20198R271)
- ML20198R272 + (ML20198R272)
- ML20198R273 + (ML20198R273)
- B16822, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Commitment Made by Util Listed + (ML20198R274)
- ML20198R275 + (ML20198R275)
- 05000327/LER-1997-004-02, Forwards LER 97-004-02,identifying Two Addl Molded Case Circuit Breakers That Were Not in Appropriate Surveillance Instructions.Revs Annotated by Vertical Bar in Right Margin + (ML20198R276)
- ML20198R277 + (ML20198R277)
- ML20198R278 + (ML20198R278)
- ML20198R279 + (ML20198R279)
- ML20198R283 + (ML20198R283)
- ML20198R284 + (ML20198R284)
- 3F1197-20, Notifies NRC of Determination That Makeup Valve 64 Does Not Have to Be Manually Closed within 10 Minutes Following Es Actuation.Informs NRC of Proposed Revs to FSAR for Design & Licensing Basis for MUV-64 + (ML20198R285)
- ML20198R286 + (ML20198R286)
- ML20198R289 + (ML20198R289)
- ML20198R293 + (ML20198R293)
- PNO-III-83-065, on 830727,licensee Determined That All 3 EDGs Associated W/Unit 2 Were Technically Inoperable Since Required Surveillance Testing Had Not Been Conducted within Proper Time Frame.State of Il Notified + (ML20198R294)
- ML20198R295 + (ML20198R295)
- ML20198R297 + (ML20198R297)
- ML20198R301 + (ML20198R301)
- ML20198R304 + (ML20198R304)
- ML20198R305 + (ML20198R305)
- ML20198R306 + (ML20198R306)