Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P980 + (ML20198P980)
- ML20198P983 + (ML20198P983)
- ML20198P984 + (ML20198P984)
- ML20198P986 + (ML20198P986)
- ML20198P987 + (ML20198P987)
- ML20198P988 + (ML20198P988)
- ML20198P991 + (ML20198P991)
- ML20198P994 + (ML20198P994)
- ML20198P997 + (ML20198P997)
- ML20198P998 + (ML20198P998)
- ML20198Q000 + (ML20198Q000)
- ML20198Q002 + (ML20198Q002)
- 05000373/LER-1997-035, :on 971007,channel Calibration of APRM Flow Biased Simulated Thermal power-upscale Did Not Conform with TS Requirements,Due to Misinterpretation of Table Notation. Surveillance Procedures Will Be Revised + (ML20198Q005)
- ML20198Q006 + (ML20198Q006)
- ML20198Q008 + (ML20198Q008)
- ML20198Q009 + (ML20198Q009)
- ML20198Q011 + (ML20198Q011)
- ML20198Q013 + (ML20198Q013)
- ML20198Q015 + (ML20198Q015)
- ML20198Q017 + (ML20198Q017)
- ML20198Q018 + (ML20198Q018)
- ML20198Q019 + (ML20198Q019)
- ML20198Q022 + (ML20198Q022)
- B16952, Monthly Operating Rept for Dec 1997 for Mnps,Unit 1 + (ML20198Q024)
- 05000277/LER-1985-024, :on 851103,blocking Removed from Drywell Oxygen Analyzer Lines a & C Before Valves Repaired & Tested.Caused by Operator Failure to Ensure Inoperable Isolation Valve Properly Tested.Blocking Restored + (ML20198Q025)
- ML20198Q028 + (ML20198Q028)
- ML20198Q029 + (ML20198Q029)
- 05000259/LER-1986-017-01, :on 860228,discovered Failure to Properly Torque Enclosing Tube Assembly Nut.Caused by Failure to Identify Torquing Requirements on Mfg Drawings & Route Objects.Nuts Tightened on Installed Switches + (ML20198Q030)
- ML20198Q031 + (ML20198Q031)
- ML20198Q033 + (ML20198Q033)
- ML20198Q034 + (ML20198Q034)
- IR 05000416/1997020 + (ML20198Q038)
- 3F0686-01, Monthly Operating Rept for May 1986 + (ML20198Q039)
- ML20198Q041 + (ML20198Q041)
- ML20198Q042 + (ML20198Q042)
- ML20198Q044 + (ML20198Q044)
- ML20198Q045 + (ML20198Q045)
- ML20198Q047 + (ML20198Q047)
- ML20198Q049 + (ML20198Q049)
- ML20198Q051 + (ML20198Q051)
- ML20198Q052 + (ML20198Q052)
- IR 05000313/1997006 + (ML20198Q058)
- ML20198Q059 + (ML20198Q059)
- ML20198Q060 + (ML20198Q060)
- ML20198Q063 + (ML20198Q063)
- IR 05000213/1986011 + (ML20198Q064)
- ML20198Q067 + (ML20198Q067)
- ML20198Q069 + (ML20198Q069)
- 05000424/LER-1997-009-02, :on 971014,CVI Actuation Signal from 1RE-0002 Had Not Blocked as Planned.Caused by Cognitive Personnel Error.Individual Involved Was Counseled Re Importance of Performing His Assigned Duties + (ML20198Q070)
- ML20198Q072 + (ML20198Q072)
- ML20198Q075 + (ML20198Q075)