November 4, 1997
EA 97 504
l
Mr. John K. Wood
Vice President - Nuclear
Davis Besse Nuclear Power Station
Centerior Service Company
5501 North State - Route 2
Oak Harbor, OH 43449
SUBJECT:
NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY REPORT
50-346/97012(DRS) AND NOTICE OF VIOLATION
Dear Mr. Wood:
On October 10,1997, the NRC completed an inspection at your Davis Besse Nuclear Power
Plant Unit i reactor facility. The purpose of this inspection was to review various aspects of
your radiation protection and chemistry programs. The enclosed report presents the results of
that inspection.
Overall, the chemistry and the radiological environmental monitoring programs were effectively
implemented. The water chemistry of primary and secondary systems was well maintained
and monitored, and leveh of corrosive impurities were mahtained below industry guidelines.
The chemistry laboratory quality control program was effective which ensured accurate
chemical and radiochemical analyses. Specific aspects of the radiological environmental
monitoring program, including material conditicn of air sampling equipment and sample
l
collection were appropriately implemented, and no discernable impact on the environment was
identified. The material condition of the post accident sampling system was improved,
however, some minor material condition problems c.?rti;iued to be identified.
The NRC identified one violation of NRC requirements during the course of this inspection.
This walation concerned your failure to maintain a radioactive material shipment within the
external radiation limits for a Limited Quantity shipment. The shipment, which was sent to the
Peny Nuclear Power Plant on August 28,1997, had dose rates of up to five times the
regulatory limits. While the dose rates associated with the shipment were such i ei the
potential for personnel to rece!ve significant dose rates was unlikely, the failme w perform an
+
adequate survey to ensure that these limits were achieved was of concern since the
classification allowed the shipment to be excepted from additional regulatory requirements.
I
9711120093 971104
kk
l
_ _ _ _ _ _ _ _ _ _ _ - -
I
..
.
J. K. Wood
2
November 4, 1997
l
This violation is cited in the enclosed Notice of Violation, and the circumstances surrounding the
violation are described lei detallin the enclosed report, Please note that you are required to
respond to this letter and should follow the instructions specified in the enclosed Notice when
'
preparing your response. The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory requirements,
in accordance with 10 CFR 2,790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your responses will be placed in the NRC Public Document Room (PDR), To
the extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the PDR without re;;ction,
Sincerely,
Original Signed by John A. Grobe
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
Enclosures:
2, inspection Report 50 346/97012(DRS)
cc w/encis:
J. P Stetz, Senior Vice President - Nuclear
J. H. Lash, Plant Manager
J. L. Freels, Manager, Regulatory Affairs
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
C A. Glazer, State of Ohio
Public Utilities Commission
Roy P. Lessy, Jr., Esq.
DOCUMENT NAME: G:DRS\\DAV97012.DRS
(SFE PREVIOUS CONCURRENCE)
to
c.~. . my , mum
wm in m. nom e . co -noo .~.nc
r . co
.-.acio
w . % -n
OFFICE
Rlli
l
Rlli
l
Rlli
/) u. a /
Rlli f., (Jk
l
.
NAME
KSelburg:Jp
GShear
GWrigMRQ/
JGr6bpN
I
DATE
11/ /97
11/ /97
11/3/97
,11//t$7
I
OFFICIAL RECORD COPY
-
.
.
.
J. X. Wood
2
!
!-
I
contact radiation protection prior to the start of the evolution as was required by their radiation
!
work permit. This violation is of concem because workers were performing activities in a
radiologically restricted area without being aware of current radiological conditions.
These violations are ot#d in the enclosed Notice of Violation, and the circumstances
surrounding the violations are described in detallin the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.700 cf the NRC's " Rules of Practice," a copy of this letter,its
enclosures, and your responses will be placed in the NRC Public Document Room (PDR). To
the extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the PDR without redaction.
Sincerely,
John A. Grobe, Director
Division of Reactor Safety
'
- Docket No. 50-346
License No. NPF-3
Enclosures:
/
2. Inspection Report 50-346/97012(DRS)
h
cc w/encls:
J. P. S'etz, Senior Vice President - Nuclear
J. H. Lash, Plant Manager
J. L. Freels, Manager, Regulatory Affairs
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
C. A. Glazu, State of Ohio
Public Utilities Commission
Roy P. Lessy, Jr., Esq.
DOCUMENT NAME: G:DRS\\DAV97012.DRS
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
l OFFICE
Rlll
6
Rll!
6[ Rlli
Rlil
l
NAME
.delburg:jp M
GShear (;LS
HMiller
JGrobe
DATE
10/211/97
10/$ /37
10/ /97
10/ /97
OFFICIAL RECORD COPY
I
1
~
w
F
1
,
,
'
J.- K.- Wood
3
November 4, 1997
Distribution:
Docket File w/encls
Rill PRR w/encis
- Rill Enf. Coordinator w/encls
PUBLIC IE-01 w/encls
SRI, Davis Besse wlencIs
TSS wlencls
OCFO/LFARB w/encls
LPM, NRR w/encls
DOCDESKwlencls
DRP w/encls
A. B. Beach, Rill w/enets
CAA1 w/encls
DRS w/encls
J. L. Caldwell, Ritt wlencls
J. Lieberman, OE w/encls
J. Goldberg, CGC w/encls
R. Zimmerman,NRRw/encls
,
j
J
.
,