Text
=
.
gbS "889,
uNiitDsTATEs
4
%
NUCLEAR REGULATORY COMMISSION
3
h
.k
REGloN iv
8,
sti MYAN PLAZA DRIVE, sulf E 400
%,.....[
AR LINGToN, T E xAs 760114064
October 31, 1997
Joseph J. Hagan, Vice President
Operations Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT 50-416/97 20 AND NOTICE OF VIOLATION
Dear Mr. Hagan:
An NRC inspection was conducted September 7 through October 18,1997, at your Grand
Gulf Nuclear Station reactor facility. The enclosed report presents the scope and resuits of
that inspection.
During the 6 week period covered by this inspection period, your conduct of activities at
the Grand Gulf f acility was generally characterized by safety conscious operations, sound
engineering and maintenance practices, and careful radiological work controls. However,
the inspection identified one violation involving the f ailure to identify lighting conditions
which did not conform to your security procedures.
This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
/[
enclosed Notice when preparing your response. The NRC will use your response, in part,
s
to determine whether further enforcement action is necessary to ensure compliance with
4
regulatory requirements,
jj
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response should not include any personal privacy, proorietary,
or safeguards information so that it caa be placed in the PDR without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
971112008797h416
~
- P
1
ADOCK 05
Dennis F. Kirsch, C
f, Project Branch F
G
Division of Reactor Projects
Docket No.: 50-416
License No.: NPF 29
ll
. _ _
__b
.
Entergy Operations, Inc.
2
Docket No.: 50 416
License No.: NPF 29
t.nclosures:
2. NRC Inspection Report
50 416/97 20
cc w/ enclosures:
Executive Vice President
and Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippl 39286 1995
Wise, Carter, Child & Caraway
P.O. Box 65'
Jackson, Mississippi 39205
Winston & Strawn
1400 L Street, N.W.
12th Floor
Washington, D.C. 20006 3502
Sam Mabry, Director
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
Claiborne County Board of Supervisors
Port Gibson, Mississippi 39150
Manager of Operations
Bechtel Power Corporation
P.O. Box 2166
Houston, Texas 77252 2166
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
-- .
. - . . -
.
.
. . .
.
. . . . . . . . . . _ . . _ _ _ _
_ _ __j
_ _ _ _ .- _ . _ _ _ _ _. _ .__ _ _ _ _ _ _ _ _ ._.. ___. _ . _ .
. _ .. _ _ . _
.
Entergy Operations, Inc.
3
The Honorable William J. Guste, Jr.
'
Attorney General
Department of Justice
State of Loulslana
P.O. Box 94005
Baton Rou9e, Loulslana 70804 9005
Office of the Governor
State of Mississippi
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
t .0. Box 22947
2
Jackson, Mississippi 39225
Dr. F. E. Thompson, Jr.
State Health Officer
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
Robert W. Goff, Director
State Lielson Officer
Division of Radiation Health
Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippl 39215 1700
Vice President
l
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
_
Jackson, Mississippi 39286 1995
Director, Nuclear Safety
and Regulatory Affairs
Entergy Operations, Inc.
P.O. Box 756
!
Port Gibson, Mississippi 39150
l'
-
. . - .
,
. - . - - .
.
.
. .
-.
-
.-
. - -
.. -
.
.
t
Entergy Operations, Inc.
4-
Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 750
Port Gibson, Mississippi 39150
,,
.
.
.
.
. . .
- - _ _ ,
-
.
Entergy Operations, Inc.
5-
E Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
DRP Director
DRS PSB
Branch Chief (DRP/F)
MIS System
Project Engineer (DRP/F)
RIV File
Branch Chief (DRP/TSS)
Senior Fiesident inspector (Grand Gulf)
.
DOCUMENT NAME: R:\\_GG\\GG720RP.JLD
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" * Copy with enclosures "N" = No copy
RIV:SRl:DRP/F
RI:DRP/F
C:DRP/F
l
[, C:PSB
.
,
JLDixon Herrity Tod KDWeaver fEQ DFKirschP
BMurray fi.L
10/)d97
g)y
10/J i/97 7 10/5t/97
- P
10/4/97
7
OFFICIAL RECORD COPY
a