3F0686-01, Monthly Operating Rept for May 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1986
ML20198Q039
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1986
From: Graham D, Widell R
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0686-01, 3F686-1, NUDOCS 8606090047
Download: ML20198Q039 (5)


Text

, .

OPERATING DATA REPORT DOCKET NO. _ 50-302 DATE _ 5/27/86-COMPLETED BY _ n nenhnm -

OPERATING STATUS TELEPHONE _ (904) 795-3802

1. Unit Name: _ Crystal River Unit 3
2. Reporting Period: h"

5/1/86 - 5/31/86

3. Licensed ThermalPouer (MWt): - 2544
4. Nameplate Rating (Gross MWe): - 890 S. Design Electrical Rating (Net MWe): - 825
6. Maximum Dependable Capacity (Gross MWe): - 860
7. Maximum Dependable Capacity (Net MWe):

- 821

8. If Changes NA Occur in Capacity Ratings (Items Number 3 Through 7)Si nce Last Report, Give Reasons:
9. Power Level To Which Restricted If Any NA(Net MWe).
10. Reasons For Restrictions,if Any: - NA This Month Yr. to Date
11. Hours in Reporting Period Cumulative 744 3623
12. Number Of Hours Reactor Was Critical -

0

_ - 80807

13. Reactor Rewrve Shutdown Hours 23.6 0 _ _ 50324.6

~

14. Hours Generator On Line 0

1280.3

~

0 23.6

15. Unit Resene Shutdown Hours 0

] __ 49114.4

16. Gross Thermal Energy Generated (MWH) 0

_ 0

~

0

17. Gross Electrical Energy Generated (MWH) 0 55103
18. Net Electrical Energy Generated (MWH)0 _ _ , _ , _ 19541 110523968] .

_ _ 37761603

19. Unit Service Factor _ _ 18580
20. Unit Availability Factor .

0% _ _ 35863252

. - 0%

_ _ 0.7% _ _ 60,8 %

21. Unit Capacity Factor (Using MD7 Net) 0%

0.7%

_ __ 60.8 %

22. Unit Capacity Factor (Using DEA Net) 0% 0.6 %

_ 55.6 %

23. Unit Forced Outage Rate

_ 0.6 %

_ _ 53.8 %

]

_ 100 %

99.3 %

_24. Shutdowns Scheduled Oser Next 6 Months (Type Date and D .

23.9 %

None uration of Each t:

\

~

k .

I

25. If Shut Down At End Of Report Period.artup: Estimated

_ June 15,1986 Date of St -

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achicied

  • INITIAL CRITICALITY INillAL ELECTRICITY

_1]__1 ]_7,7 COMMERCIAL OPERATION _1/30/77 8606090047 860031

_3/13/77 PDR ADOCK 0500030P R PDR

- - - _ - - - - - - - _ _ _ _ __ f(7LN 1, _ _-

AVE R AG' D AILY l'N11 POblR LI VLL DOCKET NO. 50-302 UNIT F LCR P-3 DATE 5/27/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWF.R LEVEL (MWe-Net) (gwe. Net) 1 0 0 37 2 0 0 18 3 0 0 1 39 0 0 I 4 20 5 21 0 l 6 0 0 22 7 0 0 23

~

8 0 0 9 0 0 25 10 0

26 0 II 0 27 12 0 28 0 13 0 29 0 14 0 30 0 15 0 33 0

0 ,

16 INSTRUCTIONS On this format,hst the average daily unit power levelin MWe. Net for each day in Ihe reporting mont the nearest whole megawatt.

i

(')/77 )

UNIT SHUTDOWNS AND POWER REDUCTIONS T ME F P-3 DATE 5/27/R6 COMPLETED BY D. Grahnm

, REPORT MONTH 5/86 TELEPHONE (904) 795-3802

- b c

- 50 "e

  • Licensee Ee " e, Cause & Corrective Attron to No. Date h jj k 3 (E3 5 Event {j mU

'8 O Present Recurrence H yE 5 3 e g =!

Report # o u

6 86-01 860101 F 744.0 A 4 86-01 CB PUMPXX The four reactor coolant pumps have been modified and repaired with new pump shafts.

I 4

1 2 'I 4 F: Forced Reason: Method Exhibit G-Insteuctions for Preparation of Data S: Scheduled A-Equipment Failure (Explain) ,_g,, ,3 B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) Fetc (Nt'RI G D-Regulatory Restriction 4-continued 0161)

EOperator Training & License Examinatiim 5-Reduced Load 9-Other $

I F-Administrative G-Operational Error (Explain) Exhibit I - Same S<mrce l (9/77) H-Other (Explain)

MONTHLY OPERATIONAL SIMiARY STATD'ENT -

DOCKET NO. 50-302 UNIT FLC R P-3 DATE 5/27/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH May 1986

SUMMARY

STATEMENT:

CR-3 remains off-line for the Reactor Coolant Pump outage. Preparations for startup (approximately June 15) are in progress.

8

=6 6

I

P e ~.

[O Gj

[

Power COR P O R ATI0N June 2, 1986 3F0686-01 Mr. James M. Taylor, Director Office of Inspection and Enforcenent U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 May 1986 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

) i R. c) Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 2

\

G EN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151