3F0686-01, Monthly Operating Rept for May 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1986
ML20198Q039
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1986
From: Graham D, Widell R
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0686-01, 3F686-1, NUDOCS 8606090047
Download: ML20198Q039 (5)


Text

,

OPERATING DATA REPORT DOCKET NO. _ 50-302 DATE _ 5/27/86-COMPLETED BY _ n nenhnm OPERATING STATUS TELEPHONE _ (904) 795-3802

1. Unit Name: _ Crystal River Unit 3 h"
2. Reporting Period:

5/1/86 - 5/31/86

3. Licensed ThermalPouer (MWt): - 2544
4. Nameplate Rating (Gross MWe): - 890 S. Design Electrical Rating (Net MWe): - 825
6. Maximum Dependable Capacity (Gross MWe): - 860
7. Maximum Dependable Capacity (Net MWe):

- 821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Si NA nce Last Report, Give Reasons:
9. Power Level To Which Restricted If Any (Net MWe).

NA

10. Reasons For Restrictions,if Any:

- NA This Month Yr. to Date

11. Hours in Reporting Period Cumulative
12. Number Of Hours Reactor Was Critical 744
13. Reactor Rewrve Shutdown Hours 0

3623 23.6

_ - 80807

15. Unit Resene Shutdown Hours 0

0

_ _ 50324.6

~

14. Hours Generator On Line 0

1280.3

~

0 23.6

] __ 49114.4

16. Gross Thermal Energy Generated (MWH) 0
17. Gross Electrical Energy Generated (MWH) 0

_ 0

~

0 55103 19541 110523968]

18. Net Electrical Energy Generated (MWH) 0
20. Unit Availability Factor.

0%

18580

_ 37761603

19. Unit Service Factor

_ _ 35863252 0%

0.7%

21. Unit Capacity Factor (Using MD7 Net) 0%

0.7%

_ _ 60,8 %

22. Unit Capacity Factor (Using DEA Net) 0%

0.6 %

__ 60.8 %

_24. Shutdowns Scheduled Oser Next 6 Months (Type Date and D 0.6 %

_ 55.6 %

]

23. Unit Forced Outage Rate 99.3 %

_ _ 53.8 %

100 %

23.9 %

None uration of Each t:

\\

~

k

25. If Shut Down At End Of Report Period. Estimated Date of St I
26. Units in Test Status (Prior to Commercial Operation):

artup: _ June 15,1986 Forecast Achicied INITIAL CRITICALITY INillAL ELECTRICITY

_1]__1 ]_7,7 COMMERCIAL OPERATION

_1/30/77 8606090047 860031

_3/13/77 PDR ADOCK 0500030P LN R

f(7 PDR 1,

AVE R AG' D AILY l'N11 POblR LI VLL DOCKET NO.

50-302 UNIT F LCR P-3 DATE 5/27/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWF.R LEVEL (MWe-Net)

(gwe. Net) 1 0

37 0

2 0

18 0

3 0

0 39 0

0 4

20 5

21 0

0 0

6 22 7

0 23 0

8 0

~

0 9

0 25 0

0 10 0

26 II 27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

33 0

0 16 INSTRUCTIONS On this format,hst the average daily unit power levelin MWe. Net for each day in Ihe reporting mont the nearest whole megawatt.

i

(')/77 )

UNIT SHUTDOWNS AND POWER REDUCTIONS F

P-3 T

ME DATE 5/27/R6 COMPLETED BY D. Grahnm REPORT MONTH 5/86 TELEPHONE (904) 795-3802 b

c 50 "e

Licensee Ee

" e, Cause & Corrective No.

Date h

jj k

3 (E3

{j

'8 Attron to 5

Event yE 5

3 g =!

Report #

mU O

Present Recurrence H

ou e

6 86-01 860101 F

744.0 A

4 86-01 CB PUMPXX The four reactor coolant pumps have been modified and repaired with new pump shafts.

I 1

2

'I 4

4 F: Forced Reason:

Method Exhibit G-Insteuctions for Preparation of Data i

S: Scheduled A-Equipment Failure (Explain)

,_g,,

,3 B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) Fetc (Nt'RI G D-Regulatory Restriction 4-continued 0161)

EOperator Training & License Examinatiim 5-Reduced Load 9-Other I

F-Administrative G-Operational Error (Explain)

Exhibit I - Same S<mrce l

(9/77)

H-Other (Explain) j

MONTHLY OPERATIONAL SIMiARY STATD'ENT -

DOCKET NO.

50-302 UNIT FLC R P-3 DATE 5/27/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH May 1986

SUMMARY

STATEMENT:

CR-3 remains off-line for the Reactor Coolant Pump outage. Preparations for startup (approximately June 15) are in progress.

8

=6 6

I

P e

~.

[O Gj

[

Power COR P O R ATI0N June 2, 1986 3F0686-01 Mr. James M. Taylor, Director Office of Inspection and Enforcenent U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 May 1986 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

)

i R. c) Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc:

Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 2

\\

G EN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151