3F0686-01, Monthly Operating Rept for May 1986
| ML20198Q039 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/31/1986 |
| From: | Graham D, Widell R FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0686-01, 3F686-1, NUDOCS 8606090047 | |
| Download: ML20198Q039 (5) | |
Text
,
OPERATING DATA REPORT DOCKET NO. _ 50-302 DATE _ 5/27/86-COMPLETED BY _ n nenhnm OPERATING STATUS TELEPHONE _ (904) 795-3802
- 1. Unit Name: _ Crystal River Unit 3 h"
- 2. Reporting Period:
5/1/86 - 5/31/86
- 3. Licensed ThermalPouer (MWt): - 2544
- 4. Nameplate Rating (Gross MWe): - 890 S. Design Electrical Rating (Net MWe): - 825
- 6. Maximum Dependable Capacity (Gross MWe): - 860
- 7. Maximum Dependable Capacity (Net MWe):
- 821
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Si NA nce Last Report, Give Reasons:
- 9. Power Level To Which Restricted If Any (Net MWe).
NA
- 10. Reasons For Restrictions,if Any:
- NA This Month Yr. to Date
- 11. Hours in Reporting Period Cumulative
- 12. Number Of Hours Reactor Was Critical 744
- 13. Reactor Rewrve Shutdown Hours 0
3623 23.6
_ - 80807
- 15. Unit Resene Shutdown Hours 0
0
_ _ 50324.6
~
- 14. Hours Generator On Line 0
1280.3
~
0 23.6
] __ 49114.4
- 16. Gross Thermal Energy Generated (MWH) 0
- 17. Gross Electrical Energy Generated (MWH) 0
_ 0
~
0 55103 19541 110523968]
- 18. Net Electrical Energy Generated (MWH) 0
- 20. Unit Availability Factor.
0%
18580
_ 37761603
- 19. Unit Service Factor
_ _ 35863252 0%
0.7%
- 21. Unit Capacity Factor (Using MD7 Net) 0%
0.7%
_ _ 60,8 %
- 22. Unit Capacity Factor (Using DEA Net) 0%
0.6 %
__ 60.8 %
_24. Shutdowns Scheduled Oser Next 6 Months (Type Date and D 0.6 %
_ 55.6 %
]
- 23. Unit Forced Outage Rate 99.3 %
_ _ 53.8 %
100 %
23.9 %
None uration of Each t:
\\
~
k
- 25. If Shut Down At End Of Report Period. Estimated Date of St I
- 26. Units in Test Status (Prior to Commercial Operation):
artup: _ June 15,1986 Forecast Achicied INITIAL CRITICALITY INillAL ELECTRICITY
_1]__1 ]_7,7 COMMERCIAL OPERATION
_1/30/77 8606090047 860031
_3/13/77 PDR ADOCK 0500030P LN R
f(7 PDR 1,
AVE R AG' D AILY l'N11 POblR LI VLL DOCKET NO.
50-302 UNIT F LCR P-3 DATE 5/27/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWF.R LEVEL (MWe-Net)
(gwe. Net) 1 0
37 0
2 0
18 0
3 0
0 39 0
0 4
20 5
21 0
0 0
6 22 7
0 23 0
8 0
~
0 9
0 25 0
0 10 0
26 II 27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
33 0
0 16 INSTRUCTIONS On this format,hst the average daily unit power levelin MWe. Net for each day in Ihe reporting mont the nearest whole megawatt.
i
(')/77 )
UNIT SHUTDOWNS AND POWER REDUCTIONS F
P-3 T
ME DATE 5/27/R6 COMPLETED BY D. Grahnm REPORT MONTH 5/86 TELEPHONE (904) 795-3802 b
c 50 "e
Licensee Ee
" e, Cause & Corrective No.
Date h
jj k
3 (E3
{j
'8 Attron to 5
Event yE 5
3 g =!
Report #
mU O
Present Recurrence H
ou e
6 86-01 860101 F
744.0 A
4 86-01 CB PUMPXX The four reactor coolant pumps have been modified and repaired with new pump shafts.
I 1
2
'I 4
4 F: Forced Reason:
Method Exhibit G-Insteuctions for Preparation of Data i
S: Scheduled A-Equipment Failure (Explain)
,_g,,
,3 B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) Fetc (Nt'RI G D-Regulatory Restriction 4-continued 0161)
EOperator Training & License Examinatiim 5-Reduced Load 9-Other I
F-Administrative G-Operational Error (Explain)
Exhibit I - Same S<mrce l
(9/77)
H-Other (Explain) j
MONTHLY OPERATIONAL SIMiARY STATD'ENT -
DOCKET NO.
50-302 UNIT FLC R P-3 DATE 5/27/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH May 1986
SUMMARY
STATEMENT:
CR-3 remains off-line for the Reactor Coolant Pump outage. Preparations for startup (approximately June 15) are in progress.
8
=6 6
I
P e
~.
[O Gj
[
Power COR P O R ATI0N June 2, 1986 3F0686-01 Mr. James M. Taylor, Director Office of Inspection and Enforcenent U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 May 1986 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
)
i R. c) Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc:
Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 2
\\
G EN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151