Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 + (ML20198P950)
- ML20198P951 + (ML20198P951)
- ML20198P953 + (ML20198P953)
- ML20198P958 + (ML20198P958)
- ML20198P960 + (ML20198P960)
- ML20198P962 + (ML20198P962)
- ML20198P963 + (ML20198P963)
- ML20198P964 + (ML20198P964)
- BSEP-97-0493, Requests That,Effective Immediately,W Levis Be Removed from Svc/Distribution List as Director - Site Operations.Util Will Provide Update to List Once Position Has Been Filled + (ML20198P966)
- ML20198P969 + (ML20198P969)
- ML20198P970 + (ML20198P970)
- 05000333/LER-1997-012-01, :on 971214,drywell Personnel Airlock Outer Door Seals Local Leak Rate Test Was Not Properly Performed.Caused by Inattention to Detail on Part of Mechanic Who Installed Label.Removed Incorrect Label + (ML20198P971)
- ML20198P972 + (ML20198P972)
- ML20198P973 + (ML20198P973)
- ML20198P974 + (ML20198P974)
- ML20198P975 + (ML20198P975)
- ML20198P977 + (ML20198P977)
- ML20198P979 + (ML20198P979)
- ML20198P980 + (ML20198P980)
- ML20198P983 + (ML20198P983)
- ML20198P984 + (ML20198P984)
- ML20198P986 + (ML20198P986)
- ML20198P987 + (ML20198P987)
- ML20198P988 + (ML20198P988)
- ML20198P991 + (ML20198P991)
- ML20198P994 + (ML20198P994)
- ML20198P997 + (ML20198P997)
- ML20198P998 + (ML20198P998)
- ML20198Q000 + (ML20198Q000)
- ML20198Q002 + (ML20198Q002)
- 05000373/LER-1997-035, :on 971007,channel Calibration of APRM Flow Biased Simulated Thermal power-upscale Did Not Conform with TS Requirements,Due to Misinterpretation of Table Notation. Surveillance Procedures Will Be Revised + (ML20198Q005)
- ML20198Q006 + (ML20198Q006)
- ML20198Q008 + (ML20198Q008)
- ML20198Q009 + (ML20198Q009)
- ML20198Q011 + (ML20198Q011)
- ML20198Q013 + (ML20198Q013)
- ML20198Q015 + (ML20198Q015)
- ML20198Q017 + (ML20198Q017)
- ML20198Q018 + (ML20198Q018)
- ML20198Q019 + (ML20198Q019)
- ML20198Q022 + (ML20198Q022)
- B16952, Monthly Operating Rept for Dec 1997 for Mnps,Unit 1 + (ML20198Q024)
- 05000277/LER-1985-024, :on 851103,blocking Removed from Drywell Oxygen Analyzer Lines a & C Before Valves Repaired & Tested.Caused by Operator Failure to Ensure Inoperable Isolation Valve Properly Tested.Blocking Restored + (ML20198Q025)
- ML20198Q028 + (ML20198Q028)
- ML20198Q029 + (ML20198Q029)
- 05000259/LER-1986-017-01, :on 860228,discovered Failure to Properly Torque Enclosing Tube Assembly Nut.Caused by Failure to Identify Torquing Requirements on Mfg Drawings & Route Objects.Nuts Tightened on Installed Switches + (ML20198Q030)
- ML20198Q031 + (ML20198Q031)
- ML20198Q033 + (ML20198Q033)
- ML20198Q034 + (ML20198Q034)
- IR 05000416/1997020 + (ML20198Q038)
- 3F0686-01, Monthly Operating Rept for May 1986 + (ML20198Q039)