Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196A055 + (ML20196A055)
- BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 + (ML20196A059)
- TXX-8816, Updates 880118 Response to Notice of Deviation 445/8731-D-03 Noted in Insp Repts 50-445/87-31 & 50-446/87-23.Corrective Actions:Impell Train C Project Instructions Revised & Rept Issued on Accuracy of Train C Walkdown Data + (ML20196A060)
- ML20196A061 + (ML20196A061)
- IR 05000425/1988067 + (ML20196A063)
- IR 05000134/1987004 + (ML20196A064)
- U-603104, Submits Rept Re Impact of Changes & Errors in ECCS Evaluation Methodology Used for Cps,Per Requirements of 10CFR50.46(a)(3)(ii).No Changes or Errors Have Been Identified Since Last Rept + (ML20196A066)
- ML20196A068 + (ML20196A068)
- ML20196A069 + (ML20196A069)
- ML20196A070 + (ML20196A070)
- NOC-AE-000352, Forwards Supplemental Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Encl Describes How JOG Program Has Been Implemented at STP + (ML20196A071)
- ML20196A072 + (ML20196A072)
- ML20196A073 + (ML20196A073)
- ML20196A075 + (ML20196A075)
- ML20196A076 + (ML20196A076)
- NOC-AE-000358, Submits 30-day Rept Re Significant Changes to Accepted LBLOCA ECCS Evaluation Model for Stp,Per Requirements of 10CFR50.46(a)(3)(ii) + (ML20196A079)
- ML20196A080 + (ML20196A080)
- JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant + (ML20196A081)
- U-603092, Forwards Response to NRC RAI for License Amend Request Re Div 3 DG Droop Issue.Supporting Info,Encl + (ML20196A082)
- ML20196A083 + (ML20196A083)
- 05000456/LER-1999-001-06, :on 990516,both Trains of LPSI Were Declared Inoperable.Caused by Leakage of SI Accumulator Water.Design Changes Were Implemented to Install Local High Point Vents in Common Portion of Rh Sys Piping to 1B & 1C RCS + (ML20196A084)
- ML20196A085 + (ML20196A085)
- ML20196A086 + (ML20196A086)
- IR 05000424/1988049 + (ML20196A089)
- ML20196A090 + (ML20196A090)
- ML20196A091 + (ML20196A091)
- ML20196A092 + (ML20196A092)
- ML20196A093 + (ML20196A093)
- ML20196A094 + (ML20196A094)
- ML20196A096 + (ML20196A096)
- ML20196A097 + (ML20196A097)
- ML20196A099 + (ML20196A099)
- ML20196A102 + (ML20196A102)
- ML20196A103 + (ML20196A103)
- ML20196A104 + (ML20196A104)
- ML20196A105 + (ML20196A105)
- 05000425/LER-1998-009, :on 981021,trouble Alarm Was Received for Train B ESFAS Sequencer Due to Inoperability.Caused by Inability to Interpret Initial Conditions.Sequencer Was down-powered to Replace Field Buffer Card.With + (ML20196A106)
- ML20196A109 + (ML20196A109)
- ML20196A110 + (ML20196A110)
- ML20196A111 + (ML20196A111)
- IR 05000445/1988036 + (ML20196A112)
- ML20196A114 + (ML20196A114)
- IR 05000395/1988025 + (ML20196A115)
- ML20196A116 + (ML20196A116)
- ML20196A117 + (ML20196A117)
- ML20196A118 + (ML20196A118)
- ML20196A120 + (ML20196A120)
- RBG-44726, Application for Amend to License NPF-47,adding New Proposed TS 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned in Early Dec 1998 + (ML20196A121)
- ML20196A122 + (ML20196A122)
- ML20196A123 + (ML20196A123)
- ML20196A126 + (ML20196A126)