MICHIGAN STATE UNIVERSITY n
Vl(F FREMDENT IOR llN GCI AND OPf R4TIONS AND TRt ul tiR E A%T L WslNG
- MICHIG AN . 4ss2s loe6 412 ADMINhlR4110N BillDING December 1, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RE: Docket 50-294, License R-114 Michigan State University
Dear S1r:
The enclosed documents and information constitute formal request to amend the Michigan State University TRIGA Reactor Operating License R-114 to a "Possession Only" status. This request is part of the current plans to decomission the reactor and voluntarily surrender the facility operating license under provisions in 10 CFR 50.82.
I O '*. mnementra# *4 >#em*1 eat 184 *im e#* iii not e com until removal of all reactor fuel from the Michigan State University (HSU) facility. All current license requirements and technical specifications will frec*ive remain in effect until issuance of the amendment by the NRC.
A sumary of the current decomissioning schedule is as follows:
i QAII TASK /MILESTOE October 1987 Final reactor shutdown June 1988 Award of reactor defueling contract October 1988 Award of dismantlement / decontamination
("decomissioning") contract Currently, the reactor fuel has been scheduled to be shipped before
- . December 23, 1988. 01smantlement/decomissioning operations are intended to follow shortly after the defueling operations. However, the decomi
- sioning plan, which is currently being written will have to be reviewed, approved,
, and a dismantlement order issued by the Comission before such opnrations can ,
begin. It is currently planned to have the decomissioning plan submitted to the NRC for review by January 2,1989.
V 8812050268 891201 gDR ADOCK05004]p Ao bot ' u ne Niermaan s A. tum fpel ofturt.est, lestsomr>>e S
i
3 (Q This request for amendment to the operating license for possession only (without fuel) is being submitted early for NRC review. MSU hopes that this will reduce the amount of time that is normally necessary for such an approval (i.e. Upon notification from MSU that all reactor fuel has been transferred off-site, the NRC can issue this amendment to possession only).
In conjunction with this request for amendment, the licensee requests waiver from both the Physical Security Plan and the Emergency Plan upon removal of the fuel from the reactor facility.
The documents listed below are provided in support of this request for amendment.
- 1. Requested Changes to License Conditions
- 2. Proposed Appendix A; "Technical Specifications, Revision 3 Michigan State University TRIGA Reactor," November 1988.
- 3. Supporting Documentation for Items 1 and 2.
If you have any questions, please feel free to contact the Reactor O- Supervisor, Bruce H. Hilkinson, Department of Chemical Engineering, HSU, (517/355-3444).
Sincerely, l
Roger E. H11kinson Vice President
[y Finance and Operations c: Mr. Ted Michaels Senior Project Engineer Special Projects Branch Regional Office US NRC, Region III O
l
- j i REQUESTED CHANGES TO OPERATING LICENSE R-114 I The following are suggested changes to be made to the conditions currently specified in the MSU TRIGA Reactor Facility Operating License R-114, i CONDITION 2.8 should be changed to read:
[ 8. Subject to the conditions and requirements incorporated herein, the l Commission hereby licenses Nichigan State University: l
- 1. Pursuant to Section 104c of the Act and 10 CFR Part 50, "Domestic l
} Licensing of Production and Utilization Facilities," to possess the !
reactor as a utilization facility in accordance with the procedures ;
- i and limitations described in the application and in this license' !
l I i !
l
- 2. Pursuant to the Act and 10 CFR Part 70, "Domestic Licensing of f
l Special Nuclear Material," to possess up to 2 grams of contained ;
i uranium 235 in connection with reactor instrumentation (fission !
l chamber).
O
! 3. Pursuant to the Act and 10 CFR Part 30, "Rules of General I Applicability to Domestic Licensing of Byproduct Material," to
- possess for storage only a 3 curie sealed americium-beryllium
- neutron source, and to possess, but not to separate, such byproduct i i material as may have been produced by operation of the reactor. [
l t l CONDITION 2.C. should be changed to read: }
l Technical Snecifications :
l
- The Technical Specifications contained in Appendix A, as revised through l
! Amendment No. 7, are hereby incorporated into the license. The licensee I
- I shall maintain the facility in accordance with the Technical (
Specifications. [
l All other license conditions should remain as is.
lo I
T, l
i O
MICHIGAN STATE UNIVERSITY TRIGA REACTOR OPERATING LICENSE R 114 DOCKET NO. 50 294 O
APPIJCATION FOR AMMENDMENT TO POSSESSION ONLY STATUS Noveniber 1988 O
1 i i i l
\.
!O t.
1
(
l i
MICHIGAN STATE UNIVERSITY TRIGA REACTOR .
I i
OPERATING LICENSE R 114 l, DOCKETNO 50 294 i O APPLICATION FOR l
l AMMENDMENT TO POSSESSION ONLY STATUS November 1988 O -