ML20196A083

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Attention Invited to Identified Unresolved Item
ML20196A083
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/25/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20196A087 List:
References
NUDOCS 8812050250
Download: ML20196A083 (2)


See also: IR 05000424/1988049

Text

, . . . , -

' - "-

., 3 NOV251988 /

.

.

t

Docket Nos. 50-424, 50-425

'

License Nos. NPF-68, CPPR-109

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Binningham, Alabama 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-424/88-49 AND 50-425/88-59

This refers to the Nuclear Regulatory Commission (NRC)-inspection conducted by

G. R. Wiseman on October 17-20, 1988. The inspection included a review of

activities authorized for your Vogtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

I Within the scope of the inspection, no violations or deviations were identi-

fled.

s

Your attention is invited to the unresolved item identified in the Inspection

Report. This matter will be pursued during future inspections.

.

!

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

.,

l

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

) Sincer.ely )

wLt'

G]

!  % we

Alan R. Herdt, Chief

Engineering Branch

I

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ennl: (S M page 2)

I

8812050250 881125 i

PDR ADOCK 05000424 \

Q PNU y;

m 1

- -

NOV 251988

'

. .

.

a'  ;

'

,

Giorgia Power Company -2

,

+ w/anc1: >

'

. P. Mr. Donald, Executive Vice

~

'

Prasident, Nuclear Operations

f.D. Rice,VicePresident, Project ,

'

ud.DirectorW. PEyes, Vogtle Quality

!

LI.Assurah.eManager

'

Bockhold, Jr. , General Manager,

fuelear Operations  !

W . P. Kane, Manager Licensing

and Engineering -

d A. Bailey, Project Licensing  !

t/d. Manager

W. Churchill, Esq., Shaw,  ;

'

h.Pittman,FottsandTrowbridge

Kirkland, !!I, Counsel, l

Office of the Consumer's Utility l

. Council i

f.Feig,GeorgiansAgainst

Nuclear Energy i

State of Georgia

cc w/ enc 1:

(

Reis. 0GC '

. Hopkins, NRR

M. Sinkule, Ril

A. Krasopolis, RI'  !

!

J. Ulie, RIII -

J. Singn, RI" ' ,  !'

! C. Ramsey, RUV

'

D. Kubick, NRR -  ;

l

! DJIS Technical Assistant

l tARC Resident Inspector s

Document Control Desk l

I

i  !

!  !

L

m

RIl g Ril RilpN 1)

,

!

JHar. s:ser D rd GWiseman PTaylor

11/ly/88 11/l4/88 11/p/88 11/2t/88

,

'

Ri! Ril RI!

M TC n1 le

11/r /88 11/ 8 11/M/88

i