Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196A001 + (ML20196A001)
- ML20196A002 + (ML20196A002)
- ML20196A003 + (ML20196A003)
- ML20196A004 + (ML20196A004)
- BSEP-88-1235, Informs That Reactor & Turbine Bldg Ventilation Flow Rate Measurement Devices Will Be Completed by 890303 Instead of 900113.Plant Mods Required to Correct Design Problems W/Sys Can Be Expedited + (ML20196A010)
- ML20196A011 + (ML20196A011)
- NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence + (ML20196A012)
- ML20196A015 + (ML20196A015)
- ML20196A017 + (ML20196A017)
- ML20196A018 + (ML20196A018)
- ML20196A019 + (ML20196A019)
- ML20196A025 + (ML20196A025)
- ML20196A029 + (ML20196A029)
- ML20196A030 + (ML20196A030)
- BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With + (ML20196A031)
- ML20196A033 + (ML20196A033)
- NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change + (ML20196A035)
- ML20196A036 + (ML20196A036)
- ML20196A037 + (ML20196A037)
- ML20196A038 + (ML20196A038)
- RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With + (ML20196A039)
- ML20196A041 + (ML20196A041)
- ML20196A043 + (ML20196A043)
- ML20196A044 + (ML20196A044)
- ML20196A045 + (ML20196A045)
- ML20196A046 + (ML20196A046)
- ML20196A047 + (ML20196A047)
- 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed + (ML20196A048)
- ML20196A050 + (ML20196A050)
- ML20196A051 + (ML20196A051)
- ML20196A053 + (ML20196A053)
- ML20196A055 + (ML20196A055)
- BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 + (ML20196A059)
- TXX-8816, Updates 880118 Response to Notice of Deviation 445/8731-D-03 Noted in Insp Repts 50-445/87-31 & 50-446/87-23.Corrective Actions:Impell Train C Project Instructions Revised & Rept Issued on Accuracy of Train C Walkdown Data + (ML20196A060)
- ML20196A061 + (ML20196A061)
- IR 05000425/1988067 + (ML20196A063)
- IR 05000134/1987004 + (ML20196A064)
- U-603104, Submits Rept Re Impact of Changes & Errors in ECCS Evaluation Methodology Used for Cps,Per Requirements of 10CFR50.46(a)(3)(ii).No Changes or Errors Have Been Identified Since Last Rept + (ML20196A066)
- ML20196A068 + (ML20196A068)
- ML20196A069 + (ML20196A069)
- ML20196A070 + (ML20196A070)
- NOC-AE-000352, Forwards Supplemental Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Encl Describes How JOG Program Has Been Implemented at STP + (ML20196A071)
- ML20196A072 + (ML20196A072)
- ML20196A073 + (ML20196A073)
- ML20196A075 + (ML20196A075)
- ML20196A076 + (ML20196A076)
- NOC-AE-000358, Submits 30-day Rept Re Significant Changes to Accepted LBLOCA ECCS Evaluation Model for Stp,Per Requirements of 10CFR50.46(a)(3)(ii) + (ML20196A079)
- ML20196A080 + (ML20196A080)
- JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant + (ML20196A081)
- U-603092, Forwards Response to NRC RAI for License Amend Request Re Div 3 DG Droop Issue.Supporting Info,Encl + (ML20196A082)
- ML20196A083 + (ML20196A083)