Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195K436 + (ML20195K436)
- ML20195K438 + (ML20195K438)
- IR 05000413/1988006 + (ML20195K439)
- BSEP-88-1228, Special Rept 1-SR-88-003:on 881120,7-day Time Frame for Limiting Condition for Operation Exceeded.Caused by Fire Door 211 Being out-of-svc to Prevent Wear & Possible Damage to Locking Seals & Interlocks + (ML20195K441)
- ML20195K442 + (ML20195K442)
- ML20195K443 + (ML20195K443)
- ML20195K444 + (ML20195K444)
- 3F1198-01, Application for Amend to License DPR-72,consisting of LAR 240,re Addition of safety-related diesel-driven Emergency Feedwater Pump.Overview of Proposed Mods Presented to NRC on 980921.Addl Info on post-mod Testing Will Be Sent by 990129 + (ML20195K446)
- ML20195K448 + (ML20195K448)
- ML20195K449 + (ML20195K449)
- ML20195K454 + (ML20195K454)
- ML20195K455 + (ML20195K455)
- ML20195K456 + (ML20195K456)
- ML20195K457 + (ML20195K457)
- ML20196A000 + (ML20196A000)
- ML20196A001 + (ML20196A001)
- ML20196A002 + (ML20196A002)
- ML20196A003 + (ML20196A003)
- ML20196A004 + (ML20196A004)
- BSEP-88-1235, Informs That Reactor & Turbine Bldg Ventilation Flow Rate Measurement Devices Will Be Completed by 890303 Instead of 900113.Plant Mods Required to Correct Design Problems W/Sys Can Be Expedited + (ML20196A010)
- ML20196A011 + (ML20196A011)
- NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence + (ML20196A012)
- ML20196A015 + (ML20196A015)
- ML20196A017 + (ML20196A017)
- ML20196A018 + (ML20196A018)
- ML20196A019 + (ML20196A019)
- ML20196A025 + (ML20196A025)
- ML20196A029 + (ML20196A029)
- ML20196A030 + (ML20196A030)
- BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With + (ML20196A031)
- ML20196A033 + (ML20196A033)
- NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change + (ML20196A035)
- ML20196A036 + (ML20196A036)
- ML20196A037 + (ML20196A037)
- ML20196A038 + (ML20196A038)
- RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With + (ML20196A039)
- ML20196A041 + (ML20196A041)
- ML20196A043 + (ML20196A043)
- ML20196A044 + (ML20196A044)
- ML20196A045 + (ML20196A045)
- ML20196A046 + (ML20196A046)
- ML20196A047 + (ML20196A047)
- 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed + (ML20196A048)
- ML20196A050 + (ML20196A050)
- ML20196A051 + (ML20196A051)
- ML20196A053 + (ML20196A053)
- ML20196A055 + (ML20196A055)
- BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 + (ML20196A059)
- TXX-8816, Updates 880118 Response to Notice of Deviation 445/8731-D-03 Noted in Insp Repts 50-445/87-31 & 50-446/87-23.Corrective Actions:Impell Train C Project Instructions Revised & Rept Issued on Accuracy of Train C Walkdown Data + (ML20196A060)
- ML20196A061 + (ML20196A061)
- IR 05000425/1988067 + (ML20196A063)