Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195H590 + (ML20195H590)
- ML20195H591 + (ML20195H591)
- ML20195H592 + (ML20195H592)
- ML20195H593 + (ML20195H593)
- ML20195H594 + (ML20195H594)
- ML20195H596 + (ML20195H596)
- LD-88-132, Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review + (ML20195H598)
- ML20195H599 + (ML20195H599)
- ML20195H601 + (ML20195H601)
- 05000133/LER-1988-002-02, :on 880521,gas Treatment Sys Actuated.Caused by Degradation of Resistor in 66 Ft Elevation Isolation Monitor Due to Aging.Resistor Replaced & Isolation Monitors Not Required Will Be Layed Up for Safstor Period + (ML20195H602)
- ML20195H603 + (ML20195H603)
- ML20195H604 + (ML20195H604)
- ML20195H605 + (ML20195H605)
- ML20195H606 + (ML20195H606)
- ML20195H607 + (ML20195H607)
- ML20195H609 + (ML20195H609)
- ML20195H611 + (ML20195H611)
- ML20195H613 + (ML20195H613)
- ML20195H614 + (ML20195H614)
- ML20195H615 + (ML20195H615)
- ML20195H616 + (ML20195H616)
- ML20195H618 + (ML20195H618)
- ML20195H620 + (ML20195H620)
- ML20195H621 + (ML20195H621)
- ML20195H622 + (ML20195H622)
- ML20195H623 + (ML20195H623)
- BECO-88-160, Advises That Secondary Containment Leak Rate Test Satisfactorily Performed on 880921.Test Verified Secondary Containment Integrity,As Defined by Tech Spec 4.7.C.1.C, Prior to RFO 7 CRD Venting + (ML20195H625)
- IR 05000457/1988007 + (ML20195H626)
- NRC-98-0182, Informs That J Cangealose,License OP-30804-1,is Now in Position with Util That No Longer Requires Operator License, Per 10CFR50.74 + (ML20195H629)
- ML20195H631 + (ML20195H631)
- BSEP-88-0006, Responds to Violations Noted in Insp Repts 50-324/87-39 & 50-325/87-38.Corrective Actions:Periodic Test Procedure 08.2.2b Revised & Approved & Appropriate Plant Administrative Procedure Will Be Implemented + (ML20195H632)
- ML20195H634 + (ML20195H634)
- ML20195H636 + (ML20195H636)
- ML20195H637 + (ML20195H637)
- ML20195H638 + (ML20195H638)
- IR 05000445/1998007 + (ML20195H641)
- ML20195H642 + (ML20195H642)
- ML20195H644 + (ML20195H644)
- ML20195H645 + (ML20195H645)
- ML20195H646 + (ML20195H646)
- ML20195H647 + (ML20195H647)
- ML20195H649 + (ML20195H649)
- 3F1198-13, LAR 221,rev 2 to License DPR-72,revising Improved Tech Spec (ITS) 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic.Rev of LAR 221 Due to Latest Guidance in Draft RG DG-1074 + (ML20195H651)
- ML20195H652 + (ML20195H652)
- ML20195H654 + (ML20195H654)
- ML20195H657 + (ML20195H657)
- ML20195H658 + (ML20195H658)
- IR 05000338/1987041 + (ML20195H661)
- ML20195H662 + (ML20195H662)
- ML20195H664 + (ML20195H664)
- ML20195H665 + (ML20195H665)