Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-22-960, Forwards River Bend Station,Emergency Response Exercise Manual,Evaluated Exercise, for 860226 Exercise.Scenario Package Contains Exercise Objectives,Observer Info,Narrative Summary & Onsite & Offsite Messages + (ML20155G527)
- ML20155G528 + (ML20155G528)
- NRC-98-0147, Forwards Two Revised ERDS Data Point Library Ref Files,Iaw 10CFR50,App E,Section VI.3.a.Revs Were Implemented on 981021 & Consist of Listed Changes + (ML20155G529)
- PY-CEI-NRR-0921, Forwards Addl Info Re Response to Requalification Exam Rept 50-440/Ol-88-01 Deficiencies.Corrective Actions:Offnormal & Emergency Procedures Will Be Reviewed to Identify Tasks Currently Performed by non-licensed Operators + (ML20155G532)
- ML20155G533 + (ML20155G533)
- B17512, Provides Response to RAI Re Review of Mnps,Unit 2 Steam Line Break Analysis.No Regulatory Commitments Contained within Ltr + (ML20155G534)
- ML20155G535 + (ML20155G535)
- ML20155G536 + (ML20155G536)
- IR 05000266/1988021 + (ML20155G537)
- B17442, Provides NRC Staff with Update of EOP Rev Effort That Is Ongoing at Mnps,Unit 2.Ongoing Reanalysis Has Resulted in Changes to Actions Necessary for Accident Mitigation. Regulatory Commitment,Encl + (ML20155G538)
- ML20155G539 + (ML20155G539)
- ML20155G540 + (ML20155G540)
- ML20155G541 + (ML20155G541)
- ML20155G542 + (ML20155G542)
- ML20155G544 + (ML20155G544)
- RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20155G545)
- ML20155G546 + (ML20155G546)
- ML20155G549 + (ML20155G549)
- ML20155G551 + (ML20155G551)
- ML20155G553 + (ML20155G553)
- RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (ML20155G554)
- ML20155G558 + (ML20155G558)
- ML20155G559 + (ML20155G559)
- ML20155G560 + (ML20155G560)
- ML20155G561 + (ML20155G561)
- ML20155G564 + (ML20155G564)
- ML20155G565 + (ML20155G565)
- ML20155G566 + (ML20155G566)
- ST-HL-AE-2674, Responds to NRC Re Violations Noted in Insp Repts 50-498/88-21 & 50-499/88-21.Corrective Actions:Review of Procedures Affected by Universal Joint Attachments for Torque Applications Completed + (ML20155G567)
- ML20155G571 + (ML20155G571)
- IR 05000223/1988004 + (ML20155G574)
- ML20155G575 + (ML20155G575)
- ML20155G577 + (ML20155G577)
- ML20155G579 + (ML20155G579)
- ML20155G580 + (ML20155G580)
- ST-HL-AE-2802, Advises That Four Areas That Required Wall Thickness Verification,Per Insp Repts 50-498/88-38 & 50-499/88-38,have Been Ultrasonically Examined & Found Acceptable + (ML20155G581)
- ML20155G582 + (ML20155G582)
- B13031, Forwards Millstone Unit 2 Small Break LOCA Analysis, to Support Cycle 10 Startup Currently Scheduled for Mar 1989 + (ML20155G583)
- ML20155G584 + (ML20155G584)
- ML20155G586 + (ML20155G586)
- ML20155G588 + (ML20155G588)
- B12022, Forwards Results of Equipment Qualification Reverification Walkdown Program,Per IE Info Notices 86-002 & 86-003. Discrepancies Will Be Corrected Prior to Startup from Current Outage + (ML20155G590)
- ML20155G591 + (ML20155G591)
- NG-86-1506, Provides Addl Info Re Last Two Masonry Walls to Meet Requirements of IE Bulletin 80-11.New Seismic Analyses for Reactor & Turbine Bldgs Completed,Incorporating Radiation Damping.Input Accelerations Reduced + (ML20155G592)
- ML20155G593 + (ML20155G593)
- ML20155G596 + (ML20155G596)
- ML20155G598 + (ML20155G598)
- ML20155G600 + (ML20155G600)
- JPN-98-046, Submits Response to NRC 981029 RAI Re ISI Program Relief Request 10 + (ML20155G601)
- ML20155G602 + (ML20155G602)
- ML20155G607 + (ML20155G607)