  • " Gaerg'a Oe.wr Com;any

,e 8

333 P>Mmont Avenue Aram Georgu 303C8

.Idephcce 404 520-0526 Ms'ing Adiess-Ebst Oftce iku 4545 A"am Georgia 30302 R. P. Mcdonald Irv sceMem e'ectrc system Exect,tae V,ce Pres 4 dent Nuclea' Qorations NON-00138 June 13, 1988 U. S. Nuclear Regulatory Comission ATTN: Document Control Clerk Washington, D. C.

20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 REPLY TO A NOTICE OF VIOLATION Gentlemen:

In accordance with the provisions of 10 CFR 2.201, Georgia Power l-Company (GPC) submits the. enclosed information in response to NRC l

Inspection Report 50-424/88-17 which concerns the inspection conducted by Messrs.

J.

F. Rogge, C. A.

Patterson, and C.

W.

Burger of the NRC l

Region II_ staff on March. 25 - April 29,1988.

A copy of this response l

is being provided to the NRC Region II office for review.

In the enclosure, transcription of the NRC violation precedes the l

GPC response.

Should there be any questions in this regard, please contact this office at any time.

Sincerel,

l I

f/

0 P. Mcdonald Exece';ive Vice-President Nuclear Operations KP/st1/gww

Enclosure:

1.

Violation 88-17-01 and GPC Response

\\D' c:

(see next page)

,8806200011 880613 PDR ADOCK 05000424 O

DCD 3

p-e.

U. S. Nuclear Regulatory. Commission June 13, 1988

-Page Two c.

Georgia Power Company Mr..P. D. Rice.

Mr. G. Bockhold, Jr.

Mr. J. E. Swartzwelder Mr. L. T. Gucwa GO-NORMS /V0GTLE-NORMS U.S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector - Operations, Vogtle 1

l 1

I l

l I

l l

L

ENCLOSURE PLANT V0GTLE - UNIT 1 NRC DCCKET 50-424 OPERATING LICENSE NPF-68 NRC NOTICE OF VIOLATION 88-17-01 and GPC RESPONSE VIOLATION 50-424/88-17-01 "Technical Specification 6.7.1.a requires that written procedures be established, implemented and maintained covering activities delineated in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Contrary to the above, on April 26, 1988, an adequate procedure had not been established to cover the control room annunciator inverter alignment and operation.

Failure to provide an adequate procedure to prescribe the alignment and operation for the backup power source resulted in a loss of all control room annunciators for a period of 12 minutes following the loss of the normal power supply.

This is a Severity Level IV violation (Supplement I)."

RESPONSE TO VIOLATION 50-424/88-17-01 Admission or denial of alleged violation:

The violation occurred as stated.

Reason for the violation:

The violation occurred due to a procedural inadequacy. The non-1E inverter output breaker, internal to the QAR3 panel, was not included in a lineup as a specific item.

This breaker connects the backup power source to the annunciators.

Corrective steps which have been taken and the results achieved:

The corrective measures taken were as folicws:

1) Procedure 11432-1, Rev. 3T, "120V AC Non-1E Instrument Distribution System Alignment" was temporarily revised on May 6, 1988 to include i

six breakers associated with inverter panels INCQAR3 and 1NCQAR2.

This information was formally included in Rev. 4 of this procedure on May 30, 1988.

2)A check for other circuits providing annunciator power showed that these are the only panels serving the Control Room annunciators.

3) Operator aids diagramming the panels internal circuitry and associated circuit breakers were installed in the panels on May 6,

1988.

Descriptive labels were also installed in the panels by this date.

4) A defective static transfer switch was replaced on June 2,1988, which restores full capability of automatic transfer of annunciator power.

NON-00130 E-1 6/13/88

f.

. ~,,

i,'1 ENCLOSURE (continued)

Corrective steps which will be taken to avoid furthr.r violations:

The aforementioned corrective measures should preclude a recurrence of this event.

Date when iall ~ compliance will be achieved:

Full compliance was achieved on May 6, 1988 with the revision Procedure 11432-1 and the installation of operator aids in the panels.

l l

l l

l l

l NON-00130 E-2 6/13/88 i