ML20155G591
| ML20155G591 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/04/1988 |
| From: | Gottula R, Stitt B SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| To: | |
| Shared Package | |
| ML20155G589 | List: |
| References | |
| ANF-88-129, NUDOCS 8810170227 | |
| Download: ML20155G591 (47) | |
Text
(
ANF-88-129 l
- n.
' 6 's
.;(
l ADVANCED NUCLEAR FUELS CORPORATION
~
MILLSTONE UNIT 2 SMALL BREAK LOCA ANALYSIS l
i OCTOBER 1988 00ft Do$d $ N 336 P
PNU
]
o 1
ADVANCEDNUCLEARFtMLSCORPORATION ANF-88-129 i
Issue Date: 10/4/88 s
)
4
.1 l
MILLSTONE UNIT 2 SMALL BREAK LOCA ANALYSIS k
i i
I
}
i Prepared by l
1 s
{
i B. D.
tt, Engineer PWR Safety Analysis Licensing & Safety Analysis l
Fuel Engineering S Technical Services i
M.b R. C. Gottula. Tea: Leader PWR Safety Analysis i
licensing & Satety Engineering Fuel Engineering & Technical Services i
I i
f October 1988 i
gf i
I
{
?
l CUSTCMER DISCLAIMER leepORTANT NOTICE REGAR0 LNG CONTENTS AND USE OF THIS
_DOCUteENT FLEASE RE.AO CAREFULLY AcPreeced Nucieer Pues Corpo anon's warrantee and recrosentatens con.
comeg ne suefect marter of the occument are thoes set form e the Agreement Derween Aerenced Nue:eer Fuees Corporapon and the Customer pursuant to wnch me occument e eeued. Accorcegry, escoot as omersnee expresary cro-veed e such Agrooment modher Advanced Nuclear Fues CorporaDon nor any person acteg on de benaff menes any warranty or representaten encrosseo or img$ed, with respect to the accuracy, corno6etences, or useNiriese of tre eter.
menon contamed e the occurnent. or taet the use of any etermaton, accaratus, mtmod or procese discsoeed e mis occument wdl nct etnnge prwstory cwnoo ngnts: or assumes any kaates umh roecoct to the use of any eformaron. 40-paretus, memod or process *= c thre coeurrent.
The clormenon conteced herem e for the so6e use of Catomer.
In oreer to evoed enoermont of noms of Acvanced Nuc' ear Fuesa Corporat:en e potents or evermons when may De ecluded e the eformaton contared a this occument. me roepent ey its accesserte of this document, agrees ret to puotu ce mane pucac use (e the patent use of tne term)of suen in ormaton unto so authortrod c wnteg Dy Advanced Nuc* ear Fuets Corporaten or untd after sis (8) months loihoweg termeaten or espiraten of tre aforesa4 troement and any J
ertensen moroof unees etnerwee expreessy cethncoo e me Agreement. No ngnts or Mcenese e or to any parents are coed oy t*e tvmioneg of this cocu-ment.
j i
l ANF-3145 47tA (it 87)
I 1
o l
ANF-88 129 Page i TABLE OF CONTENTS l
l Section EAga
1.0 INTRODUCTION
I 2.0
SUMMARY
OF RESULTS.......................
2 3.0 ANALYSIS............................
3 3.1 Description of SBLOCA Transient 3
3.i Analytical Models 6
3.3 Plant Description and Summary of Analysis Parameters......
7 3.4 Break Spectrum Base Case Results................
7 3.5 Pump Trip Delay Results 8
3.6 Asymmetric Steam Generator Tube Plugging Results...,....
10 3.7 Reduced Primary Temparature Operation 10
4.0 CONCLUSION
S 40 4
S.0 REFERENCES...........................
41 i
l i
ANF-88-129 Page 11 LIST OF TABLES Table Eagg 3.1 Millstone Unit 2 SBLOCA System Analysis Parameters.......
12 3.2 Millstone Unit 2 SBLOCA Break Spectrum Base Case Analysis Results........................
14 3.3 Calculated Event Times for 1.0% Break 15 3.4 Calculated Event Times for 1.9% Break 16 3.5 Calculated Event Times for 3.0% Break 17 3.6 Calculated Event Times for 4.0% Break 18 3.7 Millstrns Unit 2 SBLOCA Analysis Results for 4% Break, with Delayed RCP Trip 19 3.8 Calculated Event Times for 4.0% Break, with Delayed RCP Trip 20 3.9 Calculated Event Times for 1.9% Break with Asymmetric Steam Generator Tube Plugging 21 I
O 1
ANF-88-129 Page 111 LIST OF FIGURES i
Fiaure ELq1t 3.1 Primary System Pressure for 1.9% Break.
22 3.2 Core Mixture Level for 1.9f. Break 23 3.3 Total System Mass for 1.9% Break................
24 3.4 Break Flow Rate for 1.9f. Break.................
25 3.5 Total HPSI and Charging Pump Flow Rate for 1.97. Break 26 i
3.6 Combined Intact loop Safety injection Tank Flow Rate for 1.9% Break.......,,...........
27 3.7 Steam Generator Secondary Pressure for 1.9f. Break 28 l
3.8 Peak Cladding Temperature for 1.97. Break.......
29 3.9 Primary System Pressure for 3% Break..............
30 3.10 Core Mixture Level for 3f. Break 31 1
3.11 Peak Cladding Temperature for 3*. Break.............
32 3.12 Primary System Pressure for 4f. Break.............. 33 3.13 Core Mixture level for 4% Break 34 j
3.14 Peak Cladding Temperature for 4?. Break.............
35 3.15 Primary System Pressure for 47. Break, l
Pumps Off at S!AS versus Delayed Pump Trip...........
36 3.16 Core Mixture Level for 4% Break, Pumps Off at SIAS versus Delayed Pump Trip........... 37 t
3.17 Total System Mass for 4*. Break, Pumps Off at SIAS versus Delayed Pump Trip...........
38 3.18 Peak Cladding Temperature for 4*. Break, j
with Delayed Pump Trip..................... 39 l
l I
l i
ANF-88-129 Page 1
1.0 INTRODUCTION
This document presents the results of a small break loss of-coolant accident (SBLOCA) analysis for the Millstone Unit 2 reactor.
Break spectrum calculations were performed to determine the limiting break size.
The break spectrum included break sizes of li;,1.9f., 3 f., and 4!, of the cross sectional area of a cold leg pipe.
Sensitivity calculations were performed to support an asymmetric steam generator tube plugging level of 23.5 5. 9f..
Justification is also performed to justify a 300 second primary coolant pmp trip delay time following the Safety injection Actuation Signal (SIAS).
Justification is provided to support a
reduction in primary coolant temperature of up to 12*F at full power operation, i
l l
i
ANF 88-129 Page 2 2.0
SUMMARY
OF RESULTS The results of the analysis indicated the limiting break size with symmetric steam generator tube plugging was the 1.9% break.
The peak cladding temperature (PCT) for this case was calculated to be 1811'F with a maximum local cladding oxidation of 4.17%.
The results for asymmetric steam generator tube plugging at the limiting break size are similar to the results for symmetric tube plugging, with the PCT being slightly higher for the symmetric tube plugging case.
The calculations suppc-t a 300 second primary coolant pump trip delay time following the SIAS.
The anL;ysis also supports a reduction in the primary coolant temperature of up to 12'F.
The analysis supports full power operation at 2154 MWt (2700 MWt plus 2%
uncertainty) with an average steam generator tube plugging level of 23.5% and a maximum asymmetry of 5.9%.
The analysis supports a maximum Linear Heat Rate
( LHP.) of 15.1 kW/ft and a radial peaking factor of 1.61.
The analysis demonstrates that the 10 CFR 50.46(b) criteria are satisfied for the Millstone Unit 2 reactor.
The peak cla.4 ding temperatures calculated for this analysis are bounded by the peak cladding temperatures calculated for the large break LOCA analysis for Millstone Unit 2 (Ref. 1),
1 l
l 1
l l
AtlF-88 129 Page 3 3.0 ANALYSIS The purpose of the SBLOCA analysis is to demonstrate that the criteria stated in 10 CFR 50.46(b) are met.
The criteria are:
1.
The calculated peak fuel element cladding tsemperature does not exceed the 2200*F limit.
2.
The amount of fuel element cladding which reacts chemically with water or steam does not exceed 1% of the total amount of zircaloy in the core.
3.
The cladding temperature transient is terminated at a time when the core geometry is still amea-ble to cooling.
The t.ot fuel rod cladding oxidation limit of 17*. is not exceeded during or after quenching.
4.
The core temperature is reduced and decay heat is removed for an extended period of time, as required by the long-lived radioactivity remaining in the core.
Section 3.1 of this report provides a description of the postulated small break loss of-coolant transient.
Section 3.2 describes the analytical models used in the analysis.
Section 3.3 provides a description of the Millstone Unit 2 plant and a summary of the system parameters used in the SBLOCA analysis.
Secticn 3.4 provides a summary of the results of the break spec aum calculations.
Section 3.5 summarizes the results of the delayed pump trip sensitivity analysis.
Section 3.6 summarizes the results of the asymmetric steam generator tube plugging level sensitivity analysis.
Section 3.7 provides argtments to support a reduction in primary coolant temperature at full power operation.
1 3.1 Descriotion of SBl0CA Transient The small break LOCA is generally defined as a break in the PWR pressure boundary which has an area of 0.5 ft2 or less (-10*. of cold leg pipe area).
This range of break areas encompasses small lines which penetrate the primary
ANF-88-l?,9 Page 4 pressure boundtry.
Small breaks could involve pressurizer relief and safety j
valves, charging and letduwn lines, drain lines, and instrumentation lines.
The limiting break size is generally in the neighborhood of 2% of the cold leg pipe area.
The most limiting break location is in the cold leg pipe at the discharge side of the pumps, particularly with primary pumps tripped on the i
SIAS.
This break location results in the largest amount of inventory loss and the largest fraction of Emergency Core Cooling System (ECCS) fluid ejected out the break.
This produces the greatest degree of core uncovery and the longest fuel rod heatup time.
The SBLOCA transient is characterized by a slow depressurization of the primary system with a reactor trip occurring at a low primary pressure of 1750 psia in the Millstone Unit 2 plant.
The SIAS occurs when the system has depressurized to 1600 psia.
The capacity and shutoff head of the High Pressure Safety Injection (HPSI) pumps are important parameters in the SBLOCA transient.
The single failure criteria is satisfied by the loss of one diesel generator.
In the Millstone Unit 2 SBLOCA analysis, one additional HPSI pump is assumed to be out of service for maintenance, so that only one HPSI pump is available.
)
HPSI injection is delayed for 30 seconds after reae.wr scram to model a possible loss of-offsite power at reactor scram.
This 30 second delay in starting the diesel generator and HPS! pump does not affect the limiting 1.9%
break or smaller break size cases because the delay time is satisfied before the primary system pressure has decayed to the shutoff head of the HFSI pumps.
I For break sizes larger than 1.9"., HPSI flow is delayed only a few seconds due I
to the startup delay time.
Also, the HPSI flow rate becomes less significant as the break size increases above the limiting break size.
Therefore, the assumption of loss-of-offsite power has a very small effect on the small break LOCA analysis.
l The SBLOCA transient can be categorized into three break sizes (1)
"small" small breaks, (2) "medium size" small breaks, and (3) "large" sm?'i
ANF 89 129 Page 5 i
breaks.
The scenario is different for each category of break sizes.
The "small" small breaks are characterized by inventory losses that are less than the makeup capacity of tha. PSI and charging pumps such that core uncovery is limited.
The core level is eventually recovered and hot rod heatup is limited.
The "large" small breaks are characterized by a larger primary system depressurization rate such that the Safety injection Tank (SIT) pressure is reached in sufficient time to limit the core uncovery and hot rod heatup.
The HPSI pumps have limited influence in the "large" small break transient, The "medium size" small break transient is generally the most limiting.
In this transient the rate of inventory loss from the primary systen is large enough that the HPSI and charging pumps cannot preclude significant core uncovery.
The primary system depressu.*ization rate is very slow, extending the time required to reach the SIT pressure.
This tedi to maximize the heatup time of the hot rod and produces the maximum peak cladding temperature.
It al so results in the longest time at-temperature, which maximizes the local cladding oxidation.
The limiting break is characterized by a short injection of emergency core coolant from the Safety Injection Tanks.
The additional fluid injected into the core increases the steaming rate and raises the primary system pressure above the SIT pressure, thus stopping flow from the Safety Injection Tanks.
By the time the primary system pressere drops to the Sli pressure, the flow out the break has dropped to less i
than the HPSI and charging pump flow, so the level in the core is slowly tecovered by the HPS! and charging pumps.
l The time allowed for operators to manually trip the primary coolant pumps following the SIAS is an important parameter.
If the primary pumps operate after break uncovery (transition to mostly steam flow), additional inventory loss from the
- system, mare core unc3very, snd higher peak cladding temperatures will occur.
Therefore, the base calculations for this analysis tripped the primary coolant pumps at the STAS, and a sensitivity study was performed to justify a 300 second primary pump coolant trip delay time following the SIAS.
3
ANF 88-129 Page 6 3.2 Analytical Models The approved ANF SBLOCA evaluation model (Ref. 2) consists of three computer codes.
The appropriate conservatisms prescribed by Appendix K of 10 CFR 50 are incorporated.
(1) The RODEX2 code (Ref. 3) was used to determine the initial fuel stored energy which is used to initialize the system code.
(2) The ANF version of RELAP5/M002 (ANF-RELAP) was used to model the primary system and secondary side of the steam generators during the blowdown.
The governing conservation equations for mass, energy, and momentum transfer are used along with appropriate correlations consistent with Appendix K of 10 CFR 50.
The reactor core in ANF RELAP was modeled with heat generation rates determined from reactor kinetics equations with actinide and decay heating as required by Appendix K.
The reactor core was modeled with two connected parallel channels.
One channel simulates a higher power region which represents 30% of the core.
The other channel simulates an average of the remaining 70*. of the core.
The peaking factor for the higher power region used in the analysis represents the average peaking factor for that region.
The analysis is not sensitive to the value of the peaking factor for the higher power region over the range of peaking factors predicted for Cycle 10 and future cycles.
Nodalization in the upper downcomer was sufficiently detailed to simulate circumferential flow around the downcomer from the intact loops to the broken loop and the resistance to flow around the hot leg nozzles where they penetrate the downcomer.
(3) The T000EE2 code was used to simulate the behavior of the hot red during the entire transient.
The code uses fluid flow rate, temperature, and mixture level boundary conditions from the ANF RELAP system calculation, i
j
ANF-88 129 Page 7 3.3 Plant Descriotion and Summary of Analysis Parameters The Millstone Unit 2 nuclear power plant is a Combustion Engineering (CE) designed pressurized water reactor which has two hot leg pipes, two U-tube steam generators, and four cold leg pipes with one reactor coolant pump in each cold leg.
The plant utilizes a large. dry containment.
The reactor coolant system is nodalized in the ANF-RELAP model into control volumes representing reasonably homogeneous regions, interconnected by flow paths or "junctions".
The two cold legs connected to the intact loop steam generator were assumed to be symmetrical and were modeled as one intact cold leg with appropriately scaled input.
The model considers four Safety Injection Tanks, a pressurizer, and two steam generators with both primary and secondary sides of the steam generators modelea. Main feedwater flow and safety relief valves were modeled on the secondary side of the steam generator.
The HPSI and Low Pressure Safety injection (LPSI) pumps were modeled as fill junctions at the SIT lines, with conservative flows given as a function of system back-pressure.
However, the system pressure does not decay to the shutoff head of the LPSI pumps in the SBLOCA analysis.
One charging pump was included in the model with half of the flow directed to one intact loop and the other half l
directed to the broken loop.
The primary coolant p' imp performance curves are l
character'stic of the Millstone Unit 2 pumps.
A steam generator tube plugging level of 23.5*. was assumed with a maximum asymmetry of 5.9*..
A conservative top skewed axial power shape with an AS! of 0.11 and peaked at a relative core height of 0.9 was used in the analysis.
This shape was renormalized to represent a peak LHR of 15.1 kW/f t at a relative core height of 0.9.
Values for system parameters used in the analysis are given ir Table 3.1.
3.4 Break Spectrum Base Casp Results Calculations were performed for break sizes corresponding to 1.0",,
1.9'..
3.0'.,
and 4.0'. of the ficw area of one cold leg.
The cases repvrted in this section assume an even number of tubes were plugged in each steam generator, i
I
l ANF 88 129 l
Page 8 I
and that the reactor coolant pumps were tripped at the time of the SIAS.
All l
calculations were performed with a peak LHR of 15.1 kW/ft.
The results of 1
the break spectrum study are given in Table 3.2.
Calculated event times for the various break sizes are given in Tables 3.3 through 3.6.
The results show the 1.97. break size to be the limiting break, with a peak cladding temperature of 1811'F.
The 1.97. break size is the limiting case J
because it results in the slowest rate of depressurization to the SIT pressure.
The core is uncovered for the longest period of time, resulting in the most severe fuel heatup.
The 3.0". and 4.0" break sizes experienced a more rapid depressurization to the SIT pressure, which limited the length of l
l time the core was uncovered, and the depth of the core uncovery.
Thus, the PCTs predicted for the 3.0". and 4.0?. break sizes were less than the PCT predicted for the 1.97. break size.
Calculations indicated that core uncovery would be less severe for break sizes less than 1.97. and the HPSI and charging J
pumps would recover the liquid level in the core without flow from the Safety i
Injection Tanks.
j i
l The blowdown calculation for the 1.0*. break indicated that the mixture l
]
level did not drop below the top of the core, thus precluding fuel rod heatup.
l j
The High Pressure Safety injection system was sufficient to keep the core 1
l covered without flow from the SIT.
A T000EE2 hot rod heatup calculation was I
not performed for this case.
I Results for the 1.9".
3",, and 4?. break sizes are shown in Figures 3.1 through 3.14.
1 3.5 Pu*o Trio Delav Results Calculations were performed to justify a 300 second primary coolant pump
]
trip delay following the S!AS.
A delayed pump trip will postpone the time of I
break uncovery if the pump trip delay results in pump shut down after the time i
at which the break would have uncovered with pumps shut off at the S!AS.
If the break uncovery time is postponed, the break flow rate will be increaseJ i
i 1
1
ANF 88-129 Page 9
{
i until the pumps are shut off and more mass will be lost from the primary system.
The break uncovers 310 seconds after the SIAS for the 1.97. break size eith pumps off at SIAS.
for this break size, a 300 second pump trip delay could not result i'. a significantly different integrated mass loss from the primary system.
Since the time of break uncovery, with pumps off at the S!AS, increases for break sizes smaller than 1.97., the same conclusion is reached for smaller break sizes.
However, for break sizes greater than 1.9), with pumps off at the SIAS, the time to break uncovery following the SIAS becomes less than the 300 second trip delay time.
In this case, more mass would be lost out the break with up to a 300 second pump trip delay which would result l
in a deeper core uncovery.
A calculation was performed for the 47. break size with a 300 second pump trip celay.
This calculation bounds smaller break sizes and shorter pump trip delay times because it maximizes the additional mass loss from the primary system.
The break uncovers 183 seconds after the SIAS for the 4r. break siza with pumps off at the SIAS.
With a 300 second put.p trip delay a significant amount of additional mass is lost from the primary system so that when the pumps are shut off, a more severe core uncovery occurs.
A comparison of the mixture levels is shown in Figure 3.16 for the case with pumps tripped at the SIAS versus the case with the delayed pump trip.
The total heatup time is less for the case with the pump trip delay because (1) continued pump operation keeps the mixture level above the core and precludes core boatup until the pumps are shut off, and (2) once the pumps are shut off, system depressurization occurs more rapidly to the SIT pressure.
However, the heatup rate is much higher once the pumps are shut off because very little steam is Senerated in the core due to the deep core uncovery.
The overall effect is a higher PCT for the case with the delayed puep trip.
The PCT for the case with pumps tripped at the S!AS was predicted to be 1521'F while the PCT for the case with the delayed pump trip was predicted to be 1650'F.
The results of the pump trip delay case are given in Table 3.7.
The event times for this case are given in Table 3.8.
Comparisons of system
j j
ANF 88 129 Page 10 1
1 pressure, core mixture level, and total system mass for the cases with and without delayed pump trip are shown on Figures 3.15 to 3.17, respectively.
A plot of cladding temperature for the case with delayed pump trip is shown in i
Figure 3.18.
3.6 asymetric Steam Generator fube Pluaaina Renths I
The break spectrum calculations reported in Section 3,4 considered a steam generator tube plugging level of 23.5 in each steam generator.
A l
calculation was performed to determine the sensitivity of the base case limiting break (1.9?.) results to asymetric steam generator tube plugging.
An
(
asymmetry of 5.97, was analyzed.
The calculation assumed 2500 tubes were plugged in the broken loop steam generator and 1500 tubes plugged in the intact loop steam generator.
The event times for this calculation are given in Table 3.9.
It can be seen that the event times are similar to the base
{
l case calculation.
SIT flow begins 18 seconds earlier for the asymetric case j
and the core heatup time is 19 seconds less for the asymetric case.
The PCT
]
for the asymetric case is 1765'F compared to 1811'F for the base case.
[
The system response was observed to be similar between the two cases analyzed.
Because the blowdown response for the asymmetric case showed no
]
significant difference from the base case, a case with the greater number of j
tubes plugged in the intact loop steam generator would also have a nearly
[
identical system response.
It is concluded that asymetric steam generator l
)
tube plugging does not significantly change the system behavior and does not k
j alter the conclusion that 10 CFR 50.46(b) criteria are cet.
I I
3.7 F_tdyced Primary Te cerature Deeration f
2 This section presents justification to support a reduction in primary l
I coolant temperature of up to 12'F at full power operation.
The effect of a I
reduced primary coolant temperature on the SBLOCA analysis is projected to be very small.
The primary pressure will initially drop to the saturation pressure at the hot leg temperature which will be about 140 psi lower than for the base case.
The primary pressure will follow a saturated condition below 1
I
)
ANF 88 129 Page 11 the base case and level out at about the same pressure as for the base case since the secondary safety valve setpoint is tne same for both cases.
During the early part of the transient when subcooled fluid exists at the break, the break flow rate could be slightly higher, but the initial mass in the primary system will be about 1.5".
larger due to the higher initial density.
Overall, the inventory in the primary system will not change significantly.
Break uncovery and system depressurization to the S!T pressure will occur at about the same times, resulting in a similar core heatup time.
With little change in the mass inventory and a similar core heatuo time, the PCT will not change significantly.
Therefore, a reduction in the initial primary system temperature of up to 12'F will not change the conclusion that the 10 CFR 50.46(b) criteria are met for the Millstone Unit 2 pl an t.
l l
l
\\
l l
-4 ANF 88-129 j
Page 12 Table 3.1 Millstone Unit 2 SBLOCA System Analysis Parameters Primary Heat Output, HWt 2700*
Primary Coolant flow Rate, Ibm /hr 1.28 x 108 (340,000gpm)
Primary Coolant System Volume, ft3 10,506 2
Operating Pressure, psia 2250 Inlet Coolant Temperature, 'F 549 Reactor Vessel Volume, ft3 4534 Pressurizer Total Volume, ft3 1500 Pressurizer Liquid Total, ft3 922 SIT Total Volume, ft3 (one of four) 2019 SIT Liquid Volume, ft3 1150.5 SIT Pressure, psia 215.0 i
S!T Fluid Temperature, 'F 106.8
)
Total Number of Tubes per Steam Generator 8519 Number of Tubes Plugged per Steam Generator 2000 (23.5".)
Steam Generator Secondary Flow Rate, lbm/hr 6.02 x 106 Steam Generator Secondary Pressure, psia 817.6 l
Steam Generator Feedwater Temperature
'F 435 i
Reactor Coolant Pump Rated Head, ft 271.8 Reactor Coolant Pump Rated Torque, ft lbf 31,560 i
Reactor Coolant Pump Rated Speed, rpm 892 4
Initial Reactor Coolant Pump Speed, rpm 863.5 l
l i
l Primary heat output used in ANF-RELAP model - 1.02 x 2700 = 2754 MWt.
- Includes pressurizer total volume and 23.5*. average SGTP.
- Value used in ANF RELAP for initialization.
ANF-88-129 Page 13 Table 3.1 Millstone Unit 2 SBLOCA System Analysis Parameters (Cont.)
Reactor Coolant Pump Moment of inertia, lbm ft2 100,000 SIS Fluid Temperature. 'F 100.0 Reactor Scram Low Pressure Setpoint, psia 1750 SIAS Activation Setpoint Pressure, psia 1600 Secondary Safety Valve Setpoint, psia (nominal) 1000 (up to 3?. uncertainty in lift pressure was considerad in the analysis)
HPS! and Charging Pump Delay Time, sec 30.0 Charging Pump Flow Rate, gpm 40 HPS! Flow Rate versus RCS Backpressure HPSI Flow RCS Pressure (One Pump) fosia)
(com) 1225 0
1200 79 1100 198 800 371 500 475 209 564 200 567 160 579 120 592 80 605 40 619 14.7 628 0
633
Table 3.2 Millstone Unit 2 SBLOCA Break Spectrum Base Ca:;e Analysis Results*
1.9% P.reak 3.0% Break 4.0% Break Peak tiiR (kW/ft) 15.1 15.1 15.1 flot Rod Burst
- Time (sec) 1274.6 No rupture No rupture
- Elevation (ft) 10.72 occurs occurs
- Channel Blockage fraction 0.43 Peak Cladding Temperature Temperature (*l) 1811.3 1577.6 1521.0 lime (sec) 1529.1 757.1 516.1 l
- Elevation (ft) 10.47 10.72 10.47 Metal-Water Reaction
- Local Maximum 4.17 0.82 0.61
- Elevation of Local Max. (ft) 10.72 10.47 10.47
- llot Pin Total (%)
0.78 0.54 0.51
- Core Maximum (%)
<l.0
<l.0
<l.0 E
- 1.0% break not included because no core heatup was predicted.
y[
T?
ANF 88-129 Page 15 Table 3.3 Calculated Event Times for 1.07. Break TIME, see EVENT _
0.0 Break opened 25.45 Reactor scrams on low primary pressure, 37.15 SIAS reached.
RCP tripped.
111.
HPSI injection begins.
548.
Broken loop bro!.en leg pump suction clears of liquid.
584.
Intact loop pump suction clears of liquid.
626.
Break uncovers, passes nearly pure steam.
(
2232.
Minimum primary system mass reached 4000.
Calculation terminated.
di
ANF 88 129 Page 16 Table 3.4 Calculated Event Times for 1.9". Break TIME see EVENT 0.0 Bre~k opened 13.80 Reactor scrams on low primary pressure.
20.15 SIAS reached.
RCP tripped.
63.0 HPSI injecticn begins.
262.
Broken loop intact leg pump suction clears of liquid.
298.
Intact loop pump suction clears of liquid.
330.
Break uncovers, passes nearly pure steam.
766.
Top of core begins to heatup.
1246.
Minimum primary system mass reached.
1522.
SIT flow initiated.
1529.
Peak cladding temperature reached.
1540.
S!T flow terminated.
2000.
Calculation terminated.
e ANF-8A 129 Page 17 Table 3.5 Calculated Event Times for 3.07. Break TIME. sec EVENT -
0.0 Break opened 9.80 Reactor scrams on low primary pressure.
14.95 SIAS ri4ched.
RCP tripped.
46.
HPS! injection begins.
190.
Broken loop intact leg pump suction clears of liquid.
198.
Intact loop pump suction clears of liquid.
270.
Break uncovers, passes nearly pure steam.
356.
Top of core begins to heatup.
754.
Minimum primary system mass reached, S!T flow initicted.
757.
.eak cladding temperature reached.
)
784.
S!T flow terminated.
900.
Calculation terminated.
A4F-88 129 Page 18 Table 3.6 Calculated Event Times for 4.07. Break TIME. see t/ENT 0.0 Break opened 8.40 Reactor scrams un low primary pressure.
12.75 SIAS reached.
RCP tripped.
39.
HPSI injection begins, 142.
Broken loop intact leg pump suction clears of liquid.
156.
Intact loop pump suction clears of liquid.
196.
Break uncovers, passes nearly pure steam.
287.
Top of core begins to heatup.
514.
Minimum primary system mass reached, S!T flow initiated.
516.
Peak cladding temperature reached.
800.
Calculation terminated.
ANF 88 129 Page 19 Table 3.7 Millstone Unit 2 SBLOCA Analysis Results for 4% Break, with Delayed RCP Trip (RCP Trip Delayed 300 seconds after S!AS)
Peak LHR (kW/f t) 15.1 Hot Rod Burst Time (sec) 516.6 Elevation (ft) 10.47 Channel Blockage Fraction 0.50 Peak Cladding Temperature Temperature (*F) 1649.9 Time (sec) 523.1 Elevation (ft) 10.22 Metal Water Reaction (ocal Maximum (%)
0.95 Elevation of Local Max. (ft) 10.47 Hot Pin Total (%)
0.527 Core Maximum (*.)
<1.0 l
ANF-88-129 Page 20 Table 3.8 Calculated Event Times for 4.0% Break, s
with Delayed RCP Trip TIME. see EVENT 0.0 Break opened 8.40 Reactor scrams on low primary pressure.
12.75 SIAS reached.
39.
HPSI injection begins.
313.
RCP Tripped.
335.
Top of core begins to heatup.
452.
Minimum primary system mass reached, SIT flow initiated.
523.
Peak cladding temperature reached.
556.
Calculation terminated.
l
ANF-88-129 Page 21 Table 3.9 Calculated Event Times for 1.97. Break with Asymmetric Steam Generator Tube Plugging TIME. sec EVENT 0.0 Break opened 13.85 Reactor scrams on low primary pressure.
20.30 SIAS reached.
RCP tripped.
63.
HPSI injection begins.
288.
Intact loop pump suction clears of liquid.
308.
Broken loop intact cold leg pump suction clears of liquid.
338.
Break uncovers, passes nearly pure steam.
l 764.
Top of core begins to heatup.
1262.
Minimum primary system mass reached 1504.
SIT flow initiated.
1508.
Peak cladding temperature reached.
1526.
SIT flow terminated.
2000.
Calculation terminated.
ANF-88-129 Page 22 0
88 4u o
e 8
M l
4 5
w U
5?
o.
t3
_8 E
0^
z o
u W
G m
w m
M N
r E
o-
_d H E
8 m
o C
d
_?
i i
i i
0'00SE 0'0002 0'00SI 0'0001 0'005 0'O PISd
'3bbSS3bd
ANF-88-129 Page 23 O
8 9
_8=
O
~$
g E
o
_O3 8
w O
a O
w
$ ^o a
0 w
w
~
O v o
O eo 2
5*u O EH 8
~.
O M
~OO u
E m
O
- O, O
~8
-O Z
3 O
O O
V N
O
'1d ' IGA 01 aangxI}q oaco
ANF-88-129 Page 24
~
od
-8 m
M 8
5 s
M 5
m e
o
^
'R -
I
~o z
W d
v) w G
w a
E 5
os a
dH
~
8 m.
M d
o 8
.g C
e Cl 0
i i
i i
0'6v 0*El O'SC O'OE 0*lE 0*F1 0'4 7-0Ix tuqt ' AgoI}aAni sgyy
ANF-88-129 Page 25 o.o
_,-o 4
8
=
~5 9
.=.:
~5=
c.
o a
-o u
~*
w w
x 3
w 5
5
~
=
x e
o 6
o
-o w
m-
~
~;(
~ C3 &
W
~
W i,"
a w
MnE o-w ciE-* m
.o a2 e
ei ox o
S 9
-8 C
... W
=
a
-o i
e i
i O'00SE 0'0003 0'00S!
0'0001 0'00S 0'O
- / M t '31VB M013 MV3B8 I
ANF-88-129 Page 26 O
O l
ON O
.Oe m
M$
.8 E
/
s M
1 ce O
O O
6 w
E ec 8
5 a
he W
o e_
0 m m o O w C-O e
2 o 5 OeE.
O 6 c
-O a
e
=<
-.m O
9:
.oc 8h O
O
- O, m
O e
~8 8
C C
w i
i i
a i
i i
O 8
8 8
8 8
8
?
8 8
dt o
cos/qi 'aqug acid ssu}y
ANF-68-129 Page 27 oda R
=
S o
O 4
~8 Eu
>.5 CE m
O m-8e od "2
-8 O w
~ o$2 y ~= x u1wo8 wa w5' EmM o M8E
'd H u -
Om m
o
-8+
e,
-o O*00F 0*dEC O'dtE 0*d91 0'ba O*O aas/wqt '31V8 M0lJ 11S dOOl 1DV1N! 03NIEW03 l
l l
l 9
8e 2
a9 N-g' o Mo g PRIMARY SIDE Of TUBES EXPER-g IEtlCES Clif. FEEDWATER FLOW REPRESSURIZES SEC0tlDARY SIDE g g-e5 w O$
^
$ 8' E
a O
E d.
i r E j 5
0; 9
8-s 0
?
~?
\\
0.0 m.0 800.0 12$0.0 16$0.0 2000.0 TIl1E [SEC) g5 FIGURE 3.7 STEAM GEftERATOR SEC0fiDARY PRESSURE FOR 1.9% BREAK
e ANF-88-129 Page 29 O
N O
O O
I i
l g
O N
O, 8
S I
O.
M<
O w
O g
CO
- ~ - - -
g tr.
O N
o o
- w w
M MD O
E a
w 3 er.
k a w Z
>==
O O
U
=
O. w OW
=
i ar>
M
.Z O M W
- b E
O
- o 53 7
7 CO m
u 4
4 M
N N
O
,,,,J 9
h f
d.
.d, a
o
=
b
k 4
rlu 4 E
Pi w
taJ N nN O,
NW c$. W E
j o
o v
t; 4
- 5 J
d a.
O m
g o
N I
I i
-.u g
n 00>3 Pitt 6tes cygI LE21 146 ges od Jo - 3Bn1V83dW31 DN!00V1]
J ANF-88-129 Page 30 0
8e u
w M
5 w
U S
m o
g h
~
O Ed a taE b om e s
c.
-8+
R m
U O.
8
-k C
eg i
O*00St O'0003 0'00S1 0'0001 0'003 0'O eisd '3bnSS3'dd
ANF-88-129 Page 31 oo2 8o o
-o o
u 5
m m
o a
g m
x E
d o
-O oA W
O O
w m
E v
o
-o x
o o E
.C e
o o E-v
- O, on o
M g
mu 8
C o
-ON
-8 o
3 M
O o
o V
N o
'3d 'IDA07 oangxT }y oaoo 1
ANF-88-129 Page 32 9a i
g 9!
~
s R
8
\\
M i
o.
8 d
1 e
e
>=
m E
o a
w 3m w
9 5
8 E
a u
ow w
- om n
w v i s
W 52 z
=
H c
- o. s a
8 5
m w
n N
t w
a N
e n
R o
N y
a A
4 O
wZ E
5 8m S
2 2
xg g
03 it a
J E
9 a
I I
f I
l o
00>3 tilt stel t>G1 LGal its 989 oN J - 3801Vd3dW31 DN!00V13 g
A'lF-88-129 Page 33 Wu e
Me e,
-8 8
m w
u5 0
x C
- z C.tu e#
O M M
- 8, e.,
-=
E b
~ x H
2 A
O.
-9 8
M 6
Cl i
-o O*00SE 0'0002 0'00ST O'ObO!
0'00S O'O etsd '3dnSS38d l
l
ANF-88-129 Page 34 1
8 a
~$
8o u5 E
8 g
t-5 o
d
~E g 5
8 e
v E
o
-o o e s
6, e
a o b U
- O, c
o 5
~8 y
c 8c o
~8
..og
- o y
N O
c c
9 N
o
'1d 'IDA07 oangx} }y oaoo
AtlF-88-129 Page 35 a
l I
I i
4 l
h 9
.~
o a
u 5
ce m
aw aa 5
g w
ua
>=
5
(
O W
~
- m k
a w
z O
e u
e ow
- oM o't g
w u
Z O. M W
p.
1 g
5 2
A 4
a, u
o N
e w
4 8
w2 x
S
$y
~
~
es a
s e
2
~
i e
i i
e-i o
00Pt Pitt etet ttst ists its gag o(/
J - lbn1V03dW11 DN!00V13 c
1
AtlF 129 Page 36 o
C I
i i
I Q
M 4
c.
N 2;
~
oO AA N8 oa a
u o.
o
$e e
C3 py v<
,f CN o
m O
sw C o
- c. <
0 gG
/
d hE S-
,./
S'M
>. C O
gx O
=b
/./
v x5
- o. a.
/
./
C
/
m O
/
O N
3_
N f
I l
C O
O C
C C
O O
O O
O W
Q C
Q C
N N
H H
liiGd 80JnS90Jd
l1 i
i iI E A "'
J%
000 1
0
,0 P
9 I
R T
PM 0
U 0
P 8
,D K
E A Y E
A R
L B
E 00
- 7. D 7
4 S
U R S O R F
E V
0 L
E 0
S V
6 )
A E
c L
I S
e E
T s
R
,'g,l!,
A
(
U 0
T F
l s
- f 0
X F
5 e I
O e::
M j8 m
s!
,a! ! ;i l,
S 4 #s E
P i
R O
M O
,g 0 T C P U
,0 s'
4 I!j'i 8 i Iii IitI8a 6
i!
1 0
3
,0 3
E f
R f n UG oo I
F PP 0
,0 2
RR 0
,0 1
O 4
2 0
8 6
4 2
0 1
1 1
d x,~ O > 0 4 O E 3 # X M U Oo 4
ll
ANF-88-129 Page 38 o
O i
i i
i o
M a
NZ oo g
AA B
00 A
mm
,o 4G I
ud ea 42 5$
e mm e
em j5
@ o
w k)
E
(
z 1
6 d*
AL q~~.l 8
58
~b o
gg o,
Es
~
-~
./
.I 2
/
m
/
e m
o 8
s' N
e m
.s'
/
t I
t g
C O
O O
c o
O O
Q o
o O
C O
O C
C C
O O
C o
o o
e o
O Y
O N
N tuql 'ssuly
AtlF-88-129 Fage 39 O,
O I
3 3
I l
3 Q
2 N
e 8
Q ina W
w a.
E l
~
8 a
j
]
5 O
6 O
w S
5
.m
- a.
'e sa
(
a r-U E a.
O LAJ WE am
~2
=
o O
V l ZQ
~wk L1J ka E
dQ O H I
2 w=
5 t:
m
- 3 a
n M
M W
W N
N 3
N M
o c0
~
N m
D W N Q N o.
O OM
$N
'l "9
.-u-4 A
-n-Y A
i i
m o
cert titt sig; CPGI LSE1 146 ses od 30
- 1001Vd3ddli StJ!C0113
ANF 88-129 Page 40
4.0 CONCLUSION
S The results of the SBLOCA analysis for the Millstone Unit 2 reactor determined the 1.97. break size to be the limiting break 'with the approved SBLOCA evaluation model.
The analysis supports full power operation at a power level of 2754 MWt (2700 + 2r uncertainty), with an average steam generator tube plugging level of 23.5f. and a maximum asymmetry of 5.9?..
The analysis supports a peak LHR of 15.1 kW/ft and a radial peaking factor of 1.61.
The analysis supports a 300 second primary ccolant pump trip deiay following the SIAS and a reduction in primary coolant temperature of up to 12*F at full power operation.
The analysis supports Cycle 10 and is intended to support operation for future cycles.
Operation of Millstone Unit 2 with ANF 14x14 fuel within the above stated criteria assures that the NRC acceptance criteria for small break Loss of Coolant Accidents (10 CFR 50.46(b)) will be met with the emergency core cooling system for Millstone Unit 2.
AtlF-88-129 Page 41 5.0 REFEREtiCES (1) Af1F l l8, "Millstone Unit 2 Large Break LOCA/ECCS Analysis," Advanced fluclear Fuels Corp., August 1988.
(2) Letter, Ashok C.
Thadani (Assistant Director for Systems, Division of Engineering & Systems Technology Office of f1RR) to Gary M. Ward (AfiF Manager, Reload Licensing), "Acceptance for Referencing Topical Report X fi-f1F 49 ( P), Revision 1, Exxon fluclear comoany Evaluation Model-LXEM PWR Small Break Model", dated July 12, 1988.
(3) Xfi f1F 81-58(P)( A). Revision 2. and Sucolements 1 5 2, "RODEX2: Fuel Rod Thermal flechanical Response Evaluation Model", Exxon fluclear Company, March 1984.
l
...