Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155G250 + (ML20155G250)
- ML20155G251 + (ML20155G251)
- ML20155G252 + (ML20155G252)
- ML20155G254 + (ML20155G254)
- 05000219/LER-1988-019, :on 880902,discovered That Isolation Condenser Vent Line Inboard Manual Isolation Valve a in Closed Position.Caused by Procedural Inadequacy.Valve Opened & Full Sys Lineups Performed + (ML20155G255)
- ML20155G256 + (ML20155G256)
- JPN-88-053, Responds to NRC 880729 Generic SER on Resolution of USI A-46 & Generic Ltr 87-02.Based on Current Schedule,Generic Implementation Procedure Will Be Completed in First Quarter 1989,contingent on Listed Actions + (ML20155G257)
- ML20155G258 + (ML20155G258)
- ML20155G260 + (ML20155G260)
- ML20155G261 + (ML20155G261)
- ML20155G262 + (ML20155G262)
- 3F0988-22, Discusses Outlined Consideration to Upgrade Reliability & Capacity of Emergency Diesel Generators.Util to Pursue Option 3 of Involving Capacity Upgrade to Gain Addl Margin Between Accident Loads & Capacities of Machines + (ML20155G264)
- ML20155G265 + (ML20155G265)
- IR 05000324/1986008 + (ML20155G266)
- IR 05000361/1988015 + (ML20155G267)
- ML20155G268 + (ML20155G268)
- ML20155G269 + (ML20155G269)
- ML20155G271 + (ML20155G271)
- ML20155G272 + (ML20155G272)
- ML20155G276 + (ML20155G276)
- ML20155G278 + (ML20155G278)
- ML20155G279 + (ML20155G279)
- ML20155G281 + (ML20155G281)
- ML20155G283 + (ML20155G283)
- ML20155G286 + (ML20155G286)
- ML20155G287 + (ML20155G287)
- ML20155G288 + (ML20155G288)
- ML20155G289 + (ML20155G289)
- ML20155G290 + (ML20155G290)
- NRC-88-0150, Responds to NRC Re Violations Noted in Insp Rept 50-341/88-21.Corrective Actions:Safety Evaluation 87-0114 Prepared for Taking Out Main Steam Reheater & Ramifications of Operating W/Reduced Feedwater Temp Evaluated + (ML20155G293)
- ML20155G294 + (ML20155G294)
- ML20155G295 + (ML20155G295)
- ML20155G297 + (ML20155G297)
- ML20155G300 + (ML20155G300)
- AECM-88-0119, Advises That Util in Process of Reorganization Which Will Change Responsibilities within Quality Program.Addl Internal Organization Assessment Expected Soon,Thus Delay of Annual Submittal Requested Until 880901 + (ML20155G301)
- ML20155G303 + (ML20155G303)
- 05000354/LER-1988-023, :on 880908,RWCU Pump a Seal Failure & Isolation Equipment Failure Occurred.Local Insp Determined That Steam Leaking from Pump Seal.Caused by Equipment Failure.Failed RWCU Pump Seal Replaced + (ML20155G304)
- ML20155G305 + (ML20155G305)
- ML20155G306 + (ML20155G306)
- ML20155G308 + (ML20155G308)
- ML20155G310 + (ML20155G310)
- ML20155G311 + (ML20155G311)
- 05000260/LER-1988-008-03, :on 880905,transfer to Deenergized Transformer Caused Loss of Power at 2B 480 Volt Shutdown Board & Subsequent Loss of Power at 2B Reactor Protection Sys Bus, Initiating ESF Actuation.Feeder Breaker Closed + (ML20155G313)
- ML20155G314 + (ML20155G314)
- IR 05000259/1988026 + (ML20155G315)
- ML20155G319 + (ML20155G319)
- ML20155G320 + (ML20155G320)
- ML20155G321 + (ML20155G321)
- ML20155G325 + (ML20155G325)
- ML20155G327 + (ML20155G327)
- ML20155G328 + (ML20155G328)