Informs That Emergency Operating Procedures Insp Will Be Conducted at Plant on 881024-1104.Insp Team Will Require Reasonably Quiet Room W/Tables & Chairs for 10 People & Telephone
ML20155G290
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/30/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8810140182
Download: ML20155G290 (4)


Text

.

SEP 3 01988 Docket No. 50-498 Docket No. 50-499 Houston Lighting 3 Power Coinpany ATTH: Mr. J. H. Goldberg Vice President, Nuclear P. O. Box 1700 Houston, TX 77001 Gentlemen:

This letter is to inform you that an emergency operating procedures inspection will be conducted (at the request of Region It) at the South Texas Project Electric Generating Station en October 24 - hovember 4, 1988. The entrance ill be coordinated through the office of the NRC Senior Resident In-n.eeting spector w(Operations).

For planning purposes, the inspection team plans on arriving onsite at approxi-mately 06:50 and will work until approximately 17:00 daily, except Sunday. We would like to plan the exit interview for 08:30 on November 4 1980.

3 During the inspection, the inspection team will require a reasonably quiet room with tables and chairs for 10 people and a telephcne. This room may be inside or outside the protected area. However, the inspectors must have ready access to both units and should be in close proxuity to your emergency operating procedures, WOG emergency response guidelines, procedures generation package, setpoint documents, deviation documents, and other supporting documentation required by NUREG 0737. Supplement 1, and NUREG 0899.

The first phase of the inspection will be a desk-top review of the aforementioned docu'nents and will include a review of your 50.59 analysis for safety signifi-cant deviations. During the desk-top review, we will periodically require the services of your E0P developer to supply answers and documentation to resolve questions.

The second phase of the inspection will be walkdowns of select E0ps and off-normal procedures. During this phase, we will split into three teams. Curing the control room and remote shutdown panel portion of the walkdowns, we will i need the services of licensed SR0/R0s. During the in-plant portion of the walkdowns, we will need the services of euxiliary/ equipment operators or R0s that had been certified as an auxiliary / equipment operator. As part of the E0P walkdowns, the team will review your environmental impact study (radiation and temperature) to verify that the operators can safely cperate the valves, switches and equipment specified in the South Texas Project E0Ps during a worst-case scenario.

,% l 8810140182 880930 PDR

' C -

0 ADOCK 05000498 '[C PDC

Houston Lighting & Power Co. 2 SEP 3 01988 I 4

~

The third phase of the inspection will be to exercise select E0Ps on the Soutn Texas Project simulator. During the simulator scenarios, we will need the  ;

services of a minimum operating crew (Tech. Specs.) and the simulator operators. '

This phase of the inspection will be eight hours in duration and it is recom- t mended that this time be split into two 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> sessions with a different crew l

for each session. Simulator time may be scheduled between 07:00 and 20:00, at '

your optinn. As part of this phase of the inspection, the team will review your j training program, lesson plans, training records and observe training in progress.

$ In addition, the team will review your QA audits, including corrective action, of your E0Ps program and our Human Factors Specialist will interview approxi-mately 10 users / developers of your E0Ps. The breakdown of interviewees is as  :

follows: 3-4 SR0s, 3-4 R0s, 1-2 auxiliary / equipment operators and 1-2 develop- '

ers of your E0Ps. [

a The enclosure contains a listing of documents that we require so that we may  !

I prepare for the forthcoming inspection at your South Texas Project. It is l 1 requested that this material be shipped in a tf @'> fidion so that it arrives j j in the Region III office by October 12, 1988.  ;

l' We thank you for your support in this inspection and if you have any questions, I please feel free to contact me at (312) 790-5695 or Ray S. Love (Team Leader)  !

at (312) 790-5593, j l [

Sincerely,  ;

i l

. b. b$U OE GE0ffREY C. WRgg i

! Geoffrey C. Wright, Chief i Operations Branch, Division

f of Reactor Safety Region III i 1 i t

Enclosure:

As stated See Attached Distribution [

] i i f I

i

}  !

i

' W Love /nc "aI ik jWrig Bu p"

t yht/rf 'l *4 i

i

Houston Lighting & Power Company 3 SEP30$8E Distribution G. E. Vaughn, Vice President M. A. McBurnett, Manager Operations Support Licensing J. T. Westerreier, General Manager R. L. Range /R. P. Verret R. J. Miner, Chief Operating Officer J. R. Newman, Esquire S. L. Rosen R. W. Chewning, Chairman Nuclear Safety Review Board R. J. Costello/M. T. Hardt City Public Service Board Licensing Representative Texas Radiation Control Program Director James E. Gagliardo, RIV William H. Regan, Jr., NRR/LHFB Jackie E. Bess, SRI l

1

ENCLOSURE It is ru ucstec thet the folicting dccunnu tc forwarcea to the Etsion Ill s

office in a tirrly fashion so that they errive by Octcber 12, 1900. It is also requested that these docurents bc uncontrciled but current as of the date of shipr ent.

1. All eniergency operating procedures (EOPs).
2. All of-normal procedures that require evacuation of the control rocm.
3. Site specific procedures generation package (PGP), including writers guide.
4. Set Foint document.
5. Procedure (s) that control the preparation, revision, and approval of E0Ps and off-normal procedures.
6. Technical Specifications, Section 6.
7. Simulator malfunction book.
8. Initial aid Requalification (SR0/RO) training schedule for October 24 through November 4, 198L.
9. Listing of licensed SR0s and R0s. Include date licensed or last date licensed was renewed.

Ship to: U. S. Nuclear Regulatory Commission ATTN: Ray S. Love, DRS 799 Roosevelt Road, Bldg. 4 Glen Ellyn, IL 60137