ML20155G251
| ML20155G251 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/30/1988 |
| From: | Elms A, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| MP-12311, NUDOCS 8810140161 | |
| Download: ML20155G251 (5) | |
Text
I
\\
1 l
i l
1888811 hRC OMRAtlh6 $f4tVt NPORT COMPLtit0 if MACf0R thiluttRim8 tilllll
!. 00Crti.... 50 423 OMRAilh65tATUS
- 2. E PORf!b6 PER100...StPitMK R 1998 OUTA6L + 04Llht HOUR $..
0.0
- 720.0 720.0
- 3. UTILlif C0NTACf.................A. L. ELMS 203-444 5346 1111888114811 4 LICENM O THERn4L P0stR.........................................
3411 1 MILL $ font t
- 5. h4MEPLAft RAllel (IR0$$ Mut)...................................
1,253 M i Wlf 3 1
- 6. Ml!8u (Lttit! CAL RAi!#6 (NET Mut)............................. 1,153.6 111 188811111
- 7. MI! MUM MNhplLt f aP AClii ( M0$5 MWE )........................ 1,197.0
- 1. M IIMUR NPENH DLt CAPAClif (E T Mull..........................
1,141.9
{
t.
IF CHAN6ES OCCUR AD0YE $14Cf Lali MPORT, HA50ml art...........
i N/A l
- 10. P0stR LEVEL 10 WHICH MITRICitD, IF ANY (uti Met)...............N/A
!!.REASO4FORREliRICTION,IFANY....N/A f
M0miH fiAR TO Hit tunULAfivt 10 Hit l
i
- 12. HOUR $ IN K PORilb6 PERICO 720.0 6,575.0 21,407.0 l
l
- 13. NUM MR OF HOURS THE REACTOR NAS CR!ilCAL 720.0 5,436.0 17,199.5 i
{
- 14. RthCTOR E SERVE SHUf00s4 HOURS 0.0 20.2 246.2
- 15. Hour $ StalRATOR OWList 720.0 5,244.9 16,835.4 i
l
- 16. W !! REE RVt SWUfD0o4 HOUR 5 0.0 0.0 0.0
- 17. SR0$5 THERM L tuttif 6tuttAttl (MiM) 2,452,649.0 17,557,143.0 55,136,575.4 II.GROSSELECTRICALthtR5YltNERAffl(MWH) 140,741.5 4,H3.162.0 19,293.135.0 i
- 19. E i (LICTRICAL tutRif 6tull4Til (MoH) 135,712.5 5,003,693.3 15.457,325.2 l
l l
- 20. WIT $(RVitt FETOR 100.0 79.1 78.6 1
1
!!.DelfAVAIL611LlifFACTOR 100.0 79.1 71.6 l
- 22. W IT CAPAClif FACTOR (Vllh6 MDC hti) 90.0 77.3 75.2 23.U41TCAPkCITYFACTOR(Vllh6ttRktil 17.0 76.5 74.5 I
t
- 24. WIT FCAtti OUTA6L RATE 0.0 6.7 7.9
{
25.UN!!FCActl00744EHNil 0.0 375.7 1,450.2 l
$stjfDCth$ SchtFAtt CVit htIf Ill n0tTHS (TIFT. CATE Ah5 t#4110r CF [40H)..............
E/4
!F CU$tthTLY $HUitCet, (511MAf t) STARTUP IAf t......M/A r
l 8810140161 GS0930 PDR ADOCK 05000403 s-i R
PDC g
l
AVERAGE DAILY UNIT I%'ER LEVEL DOCKET 10, 50-423_
UNIT Millatene thit 3 DATE 10-05-1r88 00titETED BY 1. L. Itas fild[L}M1 MotITH PPPTD'*FR DAY AVERAGE DAILY TWER LEVEL DAY AVERAGE DAILY I W ER LEVEL (tME-tET)
(IME 4ET) 1 1.120 16 1.122 2
J1121 17 1.121 3
LD89 18 1.119 4
1.118 19 1.122 5
1.118 20 1.1.19 6_
1.103._
21 1.119 7
1.109 22 1 118 l
l 8
1,121 23 1.119 9
1,119 24 1.121 10 1 118 25 1.127
.1 _
i.121 26 1.125 12 1.121 27 1 127
[
13 1.118 28 1.123 14 1 120 23 1J 28 15 1.121 30 1.126 I
i f
i l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-423 UNIT Millstone Unit No. 3 DATE September 30, 1988 COM?tETED BY A. Eles TELEPHONE (203) 444-5388 REPORT HONTH September 1988 i
~
P.ethod of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Prevent Recurrence None 1
2 3
4
~F:
Forced
~ Reason:
' Method:
~ Exhibit G - Instructions j
5:
Scheduled A - Equipmer.t Failure (Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 f - Administrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain) 1 i
i
l i
Docket No. 50-4J3 Date: September 30 1988 Completed By: A. Elms Telephone: (203)447-5388 REFUELING INFORMATION REQUEST l
1.
Name of facility:
Millstone 3 l
2.
Scheduled date for next refueling shutdown:
May 20, 1989 l
I l
3.
Schedule date for restart following refueling: July 13, 1989 l
4.
- dill refueling or resumption of operation thereafter require a technical I
spa;ification change or other license amendment?
[
l
- i. Technical Specification related to high enriched fuel that will be f
l loaded for cycle 3 and subsequent cycles.
l
- 2. Technical Specification related to containment operating pressure i
pressure (from 10 psia to 14.2 psia).
[
l S.
Scheduled date(s) for submitting licensing action and supporting information:
[
N/A
(
6.
Important licensing considerations associatsd with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, l
l new operating procedures:
l l
1.
Cycle 3 fuel enrichment is higher than the present fuel rack analysis
[
l 2.
New fuel design to implement use of Integral Fuel A,urnable Absorbers t
)
and Natu.al Uranium Axial Blankets.
I I
f i
7.
The number of fuel assemblies (s) in the core and (b) in the spent I
fuel storage pool:
[
l (a) 193 (b) 84 L
i i
l 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested I
or is planned, in number of fuel asserrblies:
{
Present size - 756 No increase requested.
9.
The projected date of the last refueling that can be discharged to the spent fuel poo'. assuming the present licensed capacity:
l t
End of cycle 5.
[
t
h57 UTILITIES
- c..r.i on... s.mn w..i 8.,i n. c-.ci.cui 9
TJ. 7.L.?iZ,'C!!.'
eox 27o e %TFoAo. CONNECTICUT c4141-0270
-,.......... ~.
HA
- =====
.m us. wo October 7, 1988 MI'-12311 Re:
U
- 5. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specificattor.s Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 88-10 covering operations for the month of September is hereby 'orwarded.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY 1
ff.C&
/ Step en Scace Station Superintendent Hillstone Nuclear Power (tation SES/AE:ljs Attachment cc:
Regional Administrator, Office of Inspection and Enforcement Region I Director, Office of Inspection and Enforcement Washington, D.C. (10)
Director, Of fice of Resource Manaaerrent W. J. Raymond, Senior Resident laspector f(Y 1
' \\
-