ML20155G251

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1988 for Millstone Unit 3
ML20155G251
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/30/1988
From: Elms A, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
MP-12311, NUDOCS 8810140161
Download: ML20155G251 (5)


Text

I

\\

1 l

i l

1888811 hRC OMRAtlh6 $f4tVt NPORT COMPLtit0 if MACf0R thiluttRim8 tilllll

!. 00Crti.... 50 423 OMRAilh65tATUS

2. E PORf!b6 PER100...StPitMK R 1998 OUTA6L + 04Llht HOUR $..

0.0

  • 720.0 720.0
3. UTILlif C0NTACf.................A. L. ELMS 203-444 5346 1111888114811 4 LICENM O THERn4L P0stR.........................................

3411 1 MILL $ font t

5. h4MEPLAft RAllel (IR0$$ Mut)...................................

1,253 M i Wlf 3 1

6. Ml!8u (Lttit! CAL RAi!#6 (NET Mut)............................. 1,153.6 111 188811111
7. MI! MUM MNhplLt f aP AClii ( M0$5 MWE )........................ 1,197.0
1. M IIMUR NPENH DLt CAPAClif (E T Mull..........................

1,141.9

{

t.

IF CHAN6ES OCCUR AD0YE $14Cf Lali MPORT, HA50ml art...........

i N/A l

10. P0stR LEVEL 10 WHICH MITRICitD, IF ANY (uti Met)...............N/A

!!.REASO4FORREliRICTION,IFANY....N/A f

M0miH fiAR TO Hit tunULAfivt 10 Hit l

i

12. HOUR $ IN K PORilb6 PERICO 720.0 6,575.0 21,407.0 l

l

13. NUM MR OF HOURS THE REACTOR NAS CR!ilCAL 720.0 5,436.0 17,199.5 i

{

14. RthCTOR E SERVE SHUf00s4 HOURS 0.0 20.2 246.2
15. Hour $ StalRATOR OWList 720.0 5,244.9 16,835.4 i

l

16. W !! REE RVt SWUfD0o4 HOUR 5 0.0 0.0 0.0
17. SR0$5 THERM L tuttif 6tuttAttl (MiM) 2,452,649.0 17,557,143.0 55,136,575.4 II.GROSSELECTRICALthtR5YltNERAffl(MWH) 140,741.5 4,H3.162.0 19,293.135.0 i
19. E i (LICTRICAL tutRif 6tull4Til (MoH) 135,712.5 5,003,693.3 15.457,325.2 l

l l

20. WIT $(RVitt FETOR 100.0 79.1 78.6 1

1

!!.DelfAVAIL611LlifFACTOR 100.0 79.1 71.6 l

22. W IT CAPAClif FACTOR (Vllh6 MDC hti) 90.0 77.3 75.2 23.U41TCAPkCITYFACTOR(Vllh6ttRktil 17.0 76.5 74.5 I

t

24. WIT FCAtti OUTA6L RATE 0.0 6.7 7.9

{

25.UN!!FCActl00744EHNil 0.0 375.7 1,450.2 l

$stjfDCth$ SchtFAtt CVit htIf Ill n0tTHS (TIFT. CATE Ah5 t#4110r CF [40H)..............

E/4

!F CU$tthTLY $HUitCet, (511MAf t) STARTUP IAf t......M/A r

l 8810140161 GS0930 PDR ADOCK 05000403 s-i R

PDC g

l

AVERAGE DAILY UNIT I%'ER LEVEL DOCKET 10, 50-423_

UNIT Millatene thit 3 DATE 10-05-1r88 00titETED BY 1. L. Itas fild[L}M1 MotITH PPPTD'*FR DAY AVERAGE DAILY TWER LEVEL DAY AVERAGE DAILY I W ER LEVEL (tME-tET)

(IME 4ET) 1 1.120 16 1.122 2

J1121 17 1.121 3

LD89 18 1.119 4

1.118 19 1.122 5

1.118 20 1.1.19 6_

1.103._

21 1.119 7

1.109 22 1 118 l

l 8

1,121 23 1.119 9

1,119 24 1.121 10 1 118 25 1.127

.1 _

i.121 26 1.125 12 1.121 27 1 127

[

13 1.118 28 1.123 14 1 120 23 1J 28 15 1.121 30 1.126 I

i f

i l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-423 UNIT Millstone Unit No. 3 DATE September 30, 1988 COM?tETED BY A. Eles TELEPHONE (203) 444-5388 REPORT HONTH September 1988 i

~

P.ethod of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (1) (Hours)

Reason (2)

Down Reactor (3) Report #

Code Code Prevent Recurrence None 1

2 3

4

~F:

Forced

~ Reason:

' Method:

~ Exhibit G - Instructions j

5:

Scheduled A - Equipmer.t Failure (Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)

E - Operator Training & License previous month Examination 5 - Power Reduction 5 f - Administrative (Duration = 0)

Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)

H - Other (Explain) 1 i

i

l i

Docket No. 50-4J3 Date: September 30 1988 Completed By: A. Elms Telephone: (203)447-5388 REFUELING INFORMATION REQUEST l

1.

Name of facility:

Millstone 3 l

2.

Scheduled date for next refueling shutdown:

May 20, 1989 l

I l

3.

Schedule date for restart following refueling: July 13, 1989 l

4.

  • dill refueling or resumption of operation thereafter require a technical I

spa;ification change or other license amendment?

[

l

i. Technical Specification related to high enriched fuel that will be f

l loaded for cycle 3 and subsequent cycles.

l

2. Technical Specification related to containment operating pressure i

pressure (from 10 psia to 14.2 psia).

[

l S.

Scheduled date(s) for submitting licensing action and supporting information:

[

N/A

(

6.

Important licensing considerations associatsd with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, l

l new operating procedures:

l l

1.

Cycle 3 fuel enrichment is higher than the present fuel rack analysis

[

l 2.

New fuel design to implement use of Integral Fuel A,urnable Absorbers t

)

and Natu.al Uranium Axial Blankets.

I I

f i

7.

The number of fuel assemblies (s) in the core and (b) in the spent I

fuel storage pool:

[

l (a) 193 (b) 84 L

i i

l 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested I

or is planned, in number of fuel asserrblies:

{

Present size - 756 No increase requested.

9.

The projected date of the last refueling that can be discharged to the spent fuel poo'. assuming the present licensed capacity:

l t

End of cycle 5.

[

t

h57 UTILITIES

c..r.i on... s.mn w..i 8.,i n. c-.ci.cui 9

TJ. 7.L.?iZ,'C!!.'

eox 27o e %TFoAo. CONNECTICUT c4141-0270

-,.......... ~.

HA

=====

.m us. wo October 7, 1988 MI'-12311 Re:

10CFR50.71(a)

U

5. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specificattor.s Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 88-10 covering operations for the month of September is hereby 'orwarded.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY 1

ff.C&

/ Step en Scace Station Superintendent Hillstone Nuclear Power (tation SES/AE:ljs Attachment cc:

Regional Administrator, Office of Inspection and Enforcement Region I Director, Office of Inspection and Enforcement Washington, D.C. (10)

Director, Of fice of Resource Manaaerrent W. J. Raymond, Senior Resident laspector f(Y 1

' \\

-