Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155E691 + (ML20155E691)
- IR 05000338/1988009 + (ML20155E694)
- ML20155E699 + (ML20155E699)
- ML20155E700 + (ML20155E700)
- 3F0988-18, Requests Establishment of mini-purge of Reactor Bldg to Reduce Worker Exposure to Radiation & Radioactive Matl & to Assure That Every Measure Taken to Improve Individual Personnel Safety.Insps Necessary + (ML20155E702)
- 05000414/LER-1988-013-01, :on 880314,feedwater Isolation Caused Steam Generator High Level Setpoint.Caused by Equipment Failure & Personnel Error.Operations Personnel re-established Blowdown & Reduced Steam Generator Levels + (ML20155E705)
- ML20155E706 + (ML20155E706)
- ML20155E707 + (ML20155E707)
- ML20155E708 + (ML20155E708)
- ML20155E710 + (ML20155E710)
- B13049, Comments on 880803 SER for NULAP5 Code & Use in Plant Small Break LOCA Analyses.Requests That NRC Remove Restriction on Use of Henry-Fauske/Moody Critical Flow Model for Stratified Flow + (ML20155E712)
- ML20155E713 + (ML20155E713)
- ML20155E714 + (ML20155E714)
- 3F0988-19, Submits Supplemental Info Re Reactor Bldg Purge.Outlet Flowpath Controlled from Main Control Room in Same Board Location as Relevant Indicators & Inlet Flowpath from Sys Which Normally Operates at Higher than Accident Pressure + (ML20155E715)
- ML20155E716 + (ML20155E716)
- IR 05000331/1998017 + (ML20155E717)
- ML20155E718 + (ML20155E718)
- IR 05000413/1988025 + (ML20155E719)
- ML20155E721 + (ML20155E721)
- 05000498/LER-1988-031, :on 880509,extended Range Neutron Sys Cable Assemblies Mfg by Gamma-Metrics Found Incapable of Performing Required Safety Functions.Caused by Solder Joint Leakage.Cable Assemblies & Detectors Replaced + (ML20155E722)
- ML20155E723 + (ML20155E723)
- ML20155E724 + (ML20155E724)
- ML20155E725 + (ML20155E725)
- IR 05000461/1998017 + (ML20155E726)
- ML20155E728 + (ML20155E728)
- ML20155E729 + (ML20155E729)
- ML20155E731 + (ML20155E731)
- IR 05000369/1988029 + (ML20155E733)
- ML20155E735 + (ML20155E735)
- ML20155E736 + (ML20155E736)
- ML20155E738 + (ML20155E738)
- ML20155E741 + (ML20155E741)
- ML20155E742 + (ML20155E742)
- IR 05000425/1988052 + (ML20155E745)
- ML20155E751 + (ML20155E751)
- ML20155E752 + (ML20155E752)
- ML20155E753 + (ML20155E753)
- NLS8800486, Submits Current plant-specific Seismic Verification Plans for Facility,In Response to Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 + (ML20155E754)
- B12028, Forwards Revised Relief Requests PR-4 & PR-12 Re Performing Certain Preservice Insps.Requests Initially Submitted on 851223 & Approved in Sser 5 (NUREG-1031).Revised Requests Include Welds Identified After Initial Requests + (ML20155E755)
- ML20155E756 + (ML20155E756)
- BSEP-88-0971, Comments on NRC Concerns Raised During 880908 Enforcement Conference Re Status of Evaluation of Hpci/Rcic Event. Requirement for Clear & Concise Communications Between Util & NRC Recognized + (ML20155E757)
- ML20155E759 + (ML20155E759)
- ML20155E760 + (ML20155E760)
- ML20155E761 + (ML20155E761)
- ML20155E762 + (ML20155E762)
- 05000341/LER-1988-021, :on 880510,reactor Protection Sys High Pressure Scram Occurred 18 After Closure of Both Main Steam Bypass Valves.Caused by Faulty Relay.Relay Replaced.Mod to Alter Comparator Trip Circuits Planned + (ML20155E764)
- ML20155E765 + (ML20155E765)
- ML20155E766 + (ML20155E766)
- ML20155E767 + (ML20155E767)
- ML20155E770 + (ML20155E770)
- JAFP-98-0353, Forwards Rev 2 to IST Program for Pumps & Valves - Third Interval Plan, for Ja FitzPatrick NPP + (ML20155E771)