ML20155E706
| ML20155E706 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 10/30/1998 |
| From: | Shear G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Franz J AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20155E711 | List: |
| References | |
| 50-331-98-17, NUDOCS 9811050157 | |
| Download: ML20155E706 (2) | |
See also: IR 05000331/1998017
Text
_ .
.
.
.
. -
.
.-
..
.
,.
October 30, 1998
.
Mr. John F. Franz, Jr.
Vice President, Nuclear
Alliant Tower
200 First Street SE
P. O. Box 351
i
Cedar Rapids, lA 52406-0351
SUBJECT:
DUANE ARNOLD RADIATION PROTECTION INSPECTION REPORT
50-331/98017(DRS)
Dear Mr. Franz:
On October 16,1998, the NRC completed an inspection at your Duane Arnold Energy Center.
The enclosed report presents the results of this inspection. No violations of NRC requirements
were identified.
The inspection was an examination of activities conducted under your license as they relate to
radiation safety and to compliance with the Commission's rules and regulations and with the
conditions of your license. The inspection consisted of a selective examination of procedures
and reprecenfative records, observations, and interviews with personnel. Specifically, the
inspection focused on the implementation of the solid radioactive waste management and the
-
radioactive materials shipping programs. In addition, the inspection reviewed issues identified in
previous NRC inspections. No violations of NRC requirements were identified.
We observed strengths in your staff's implementation of the solid radioactive waste
management and radioactive material shipping programs. Solid radioactive waste was properly
characterized and classified for transport to NRC licensed burial sites, and your staff safely
/
stored radioactive waste and materials within your facility. In particular, the radiation protection
'
staff performed thorough evaluations of radioactive waste stream analyses and of historical data
j
trends. We also observed the proper shipping of radioactive materials from your site, which
included adherence to both NRC and Department of Transportation requirements. However, we
noted that the communication between the radiation protection and chemistry groups was not
,
always consistent. For example, anomalies between vendor laboratory results and the
chemistry staff's results were not consistently discussed and resolved with the chemistry staff.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
l
'
9811050157 981030
ADOCK 05000331
G
i
_
_
_
,
._
J
..
.
--..
~ - - -
. _ .
..
.
.
t-
..
6
J. Franz
-2-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original /s/ Guy L. Shear
Gary L. Shear, Chief
Plant Support Branch 2
Docket No.:
50-331
License No.: DPR-49
j
Enclosure:
Inspection Report 50-331/98017(DRS)
cc w/ encl:
E. Protsch, Executive Vice President
Energy Delivery Alliant;
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
'
K. Peveler, Manager, Regulatory Performance
Chairperson, Iowa Utilities Board
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rill w/enci
C. Pederson, Rlli w/enci
B. Clayton, Rill w/ encl
SRI Duane Arnold w/ encl
DRP w/enci
TSS w/ enc!
DRS (2) w/ encl
g
,
Rill PRR w/ nel
^)
.
.PUBLIC 1
1.wlenci P
Docket
w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
M. Bies, Rill w/enci
' DOCUMENT NAME: G:\\DRS\\DUA98007.WPD
r
c.w. . cos,y onee wu,,,.,,i, mai. m inn: c = cm e .uceminum e cm m sumve w %y
]
OFFICE
Rlll
E Rlli
lE
Rlli
d
l
'
_
NAME
Orth:Jp 826 or
Shear 646
Lanskbury2Dt,
DATE
10/p/98
10lr/98
1000/98
OFFICIAL RECORD COPY
C50003
'
c
.
.
_.
__