Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155C987 + (ML20155C987)
- ML20155C990 + (ML20155C990)
- IR 05000458/1998013 + (ML20155C994)
- ML20155C998 + (ML20155C998)
- ML20155C999 + (ML20155C999)
- ML20155D001 + (ML20155D001)
- ML20155D002 + (ML20155D002)
- ML20155D004 + (ML20155D004)
- ST-HL-AE-1647, Deficiency Rept Re Bottom Mounted in-core Instrument Tubes. QC Site Supervisor Reinstructed All Inspectors to Perform Insps Using Only Currently Approved Engineering Design Documents + (ML20155D005)
- IR 05000498/1988011 + (ML20155D006)
- ML20155D009 + (ML20155D009)
- ML20155D010 + (ML20155D010)
- ML20155D012 + (ML20155D012)
- ML20155D013 + (ML20155D013)
- ML20155D015 + (ML20155D015)
- ML20155D017 + (ML20155D017)
- ML20155D018 + (ML20155D018)
- ML20155D019 + (ML20155D019)
- ML20155D020 + (ML20155D020)
- ML20155D021 + (ML20155D021)
- ML20155D022 + (ML20155D022)
- ML20155D024 + (ML20155D024)
- ML20155D026 + (ML20155D026)
- ML20155D030 + (ML20155D030)
- ML20155D031 + (ML20155D031)
- ML20155D032 + (ML20155D032)
- ML20155D035 + (ML20155D035)
- ML20155D036 + (ML20155D036)
- JPN-88-027, Proposed Tech Spec 3.11.B.1,clarifying Term Compartment & Eliminating Conflict Between Tech Specs 3.11.B.1 & 4.11.B.1 Re Crescent Area Ventilation Operability & Surveillance Testing.Util Safety Evaluation of Proposed Change Encl + (ML20155D038)
- ML20155D041 + (ML20155D041)
- ML20155D042 + (ML20155D042)
- IR 05000285/1998017 + (ML20155D043)
- ML20155D044 + (ML20155D044)
- ML20155D045 + (ML20155D045)
- ML20155D048 + (ML20155D048)
- ML20155D049 + (ML20155D049)
- 05000352/LER-1988-017, :on 880509,reactor Encl Isolation & Nssss Group VI a & B Isolations Occurred.Caused by Component Failure. Instrument Air Supply to SV-76-144A Closed Following Second Reactor Encl Isolation + (ML20155D050)
- ML20155D051 + (ML20155D051)
- ML20155D052 + (ML20155D052)
- ML20155D054 + (ML20155D054)
- ML20155D055 + (ML20155D055)
- ML20155D056 + (ML20155D056)
- ML20155D059 + (ML20155D059)
- ML20155D060 + (ML20155D060)
- ML20155D062 + (ML20155D062)
- ML20155D063 + (ML20155D063)
- ML20155D067 + (ML20155D067)
- 05000341/LER-1988-020, :on 880508,incorrect HPCI Surveillance Test Procedure Performed Causing Reactor Scram.Procedure Intended to Be Performed in Cold Shutdown or Refueling Condition. Procedure 24.202.04 Revised + (ML20155D070)
- 05000374/LER-1985-032, :on 850524,discovered That Delta Temp Leak Detection for Divs 1 & 2 of RHR Rooms Improperly Designed. Caused by Failure of Engineers to Reflect Unit 1 Changes in Unit 2 Design.Sensors Relocated + (ML20155D071)
- ML20155D073 + (ML20155D073)
- 05000333/LER-1998-011, :on 980929,failure to Meet Drywell Continuous Atmosphere Monitoring Sys TS Surveillance Test Requirements Were Noted.Caused by Deficient Tp.Declared Both Channels of CAM Sys Inoperable.With + (ML20155D076)