Forwards Application for Amend to License DPR-59,changing Tech Spec 3.11.B.1 to Clarify Term Compartment & Eliminate Conflict Between Tech Specs 3.11.B.1 & 4.11.B.1 Re Crescent Area Ventilation Operability.Fee Paid
ML20155D024
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/10/1988
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20155D028 List:
References
JPN-88-027, JPN-88-27, NUDOCS 8806140446
Download: ML20155D024 (2)


Text

_

123 Main Street

e

\\*.'hite Pf arr s, Ne.y York 10001 914 081 6240 i

A NewYorkPower seam c. ore -

W Authority t%lCa?T"'

June 19, 198',

JPN Br-027 U.S.

Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.

20555 ATTN:

Document Control Desk

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Chango to the Technical Specifications Regardinc Crescent Area Ventilation (JPTG_.9_6-010)

Dear Sir:

This application for an amendment to the James A.

FitzPatrick Technical Specifications proposes changes regarding crescent area ventilation operability and surveillance testing.

Specifically, this change clarifies the term "compartment" in Specification 3.11.B.1 on page 239.

Also, the change eliminates the conflict between Specifications 3.11.B.1 and 4.11.B.1. The current Specification? are unclear whether inoperability of more than one unit cooler per side results in a 7 day or 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Ljmiting ConditlOn for Operation.

Enclosce for filing is the signed original of a document entitled "Application for Amendment to Operating License",

together with Attachments I and II thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.

In accordance with 10 CFR 170.12, a check for $150.00 is enclosed as payment of the application fee for the review of these proposed changes to the Technical Specifications.

8806140446 880610 PDR ADOCK 05000333 P

nnn N

  • tM 3SZIY9 A"'

y vs'o.oo.

9 In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being submitted to the designated New York State official.

Should you or your staff have any questions regarding this matter, please contact Mr. J. A. Gray, Jr. of my staf f.

Very truly yours, idn Ixecutive Vice President uclear Generation Enclosures cc:

U.S.

Nuclear Regulatory Commission Region I 475 Allendale Road i

King of Prussia, PA 19406 Office of the Resident Inspector U.S.

Nuclear Regulatory Commission i

I P.O.

Box 136 Lycoming, New York 13093 1

Mr. Harvey Abelson Project Directorate I-1 Division of Reactor Projects-I/II l

4 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, D.

C.

20555 l

Mr. J.

D.

Dunkelberger, Director Technology Development Programs New York State Energy Office Two Rockefeller Plaza j

Albany, New York 12223 3

4 1

J

-.