Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154L112 + (ML20154L112)
- ML20154L116 + (ML20154L116)
- ML20154L117 + (ML20154L117)
- 05000298/LER-1988-011, :on 880418,Group 6 Isolation Occurred While Performing Maint on 24 Volt Dc Battery.Caused by Miscommunication of Clearance Order Requirements & Actual Work to Be Performed on Batteries.Bus Restored + (ML20154L118)
- ML20154L119 + (ML20154L119)
- ML20154L120 + (ML20154L120)
- ML20154L121 + (ML20154L121)
- ML20154L122 + (ML20154L122)
- 05000322/LER-1988-004, :on 880424,seismic Monitoring Instrumentation in Reactor Bldg Taken Out of Svc for More than 30 Days for Calibr.New Procedure Will Eliminate Instrument Time Out of Svc Problem + (ML20154L125)
- ML20154L128 + (ML20154L128)
- ML20154L129 + (ML20154L129)
- ML20154L130 + (ML20154L130)
- ML20154L131 + (ML20154L131)
- 05000348/LER-1988-014, :on 880424,fire Barrier Penetration 17-139-9 Breached.Caused by Failure to Fill Up Forms for 880417 Breached Penetration.Penetration Sealed & Personnel Reinstructed Re Breaching Penetration + (ML20154L133)
- ML20154L134 + (ML20154L134)
- ML20154L137 + (ML20154L137)
- ML20154L138 + (ML20154L138)
- ML20154L140 + (ML20154L140)
- ML20154L142 + (ML20154L142)
- ML20154L145 + (ML20154L145)
- ML20154L150 + (ML20154L150)
- ML20154L151 + (ML20154L151)
- ML20154L152 + (ML20154L152)
- ML20154L153 + (ML20154L153)
- ML20154L154 + (ML20154L154)
- ML20154L155 + (ML20154L155)
- 05000282/LER-1988-002-01, :on 880421,auto Start of Diesel Driven Cooling Water Pumps Occurred When Low Cooling Water Header Pressure Sensed.Cause Unknown.Pump Packing Adjusted,Educator Trap Replaced & Eductor Vacuum Increased + (ML20154L156)
- 05000458/LER-1986-017, :on 860205,nonseismically Qualified Tubing Installed in Penetration Valve Leakage Control Sys.Caused by Procedural Deficiency.Tubing Removed,Procedure Revised & Acceptable Designs Installed + (ML20154L158)
- ML20154L159 + (ML20154L159)
- 05000361/LER-1998-018, :on 980909,ECCS Was Inoperable Due to Inadequate Surveillance Test.Cause Was Not Determined Due to Length of Time.Ts SR 3.0.3,required Surveillance Tests Were Successfully Completed + (ML20154L160)
- ML20154L161 + (ML20154L161)
- 05000369/LER-1988-007-02, :on 880416,turbine Generator & Reactor Manually Tripped Due to Steam Generator 1C Feedwater Regulating Valve Closing.Caused by Failure of Control Card for Valve.Card Replaced & Will Be Analyzed by Westinghouse + (ML20154L162)
- ML20154L163 + (ML20154L163)
- ML20154L164 + (ML20154L164)
- ML20154L165 + (ML20154L165)
- ML20154L166 + (ML20154L166)
- ML20154L169 + (ML20154L169)
- ML20154L170 + (ML20154L170)
- PNO-III-88-048, on 880520,full Power OL Issued.Currently at 8% Power,Licensee Engaged in Power Ascension Activities. NRR Region IV Will Provide Augmented Insp Coverage of Power Ascension + (ML20154L172)
- ML20154L173 + (ML20154L173)
- ML20154L175 + (ML20154L175)
- PNO-III-88-047, on 880517,barrels Containing Radioactive Matl Found During Airport Excavation.Identification,Concentration & Origin of Matl Will Determine Which Agency Has Jurisdiction Over Handling of Matl + (ML20154L177)
- IR 05000295/1985005 + (ML20154L178)
- ML20154L179 + (ML20154L179)
- ML20154L180 + (ML20154L180)
- ML20154L181 + (ML20154L181)
- ML20154L182 + (ML20154L182)
- ML20154L183 + (ML20154L183)
- ML20154L186 + (ML20154L186)
- IR 05000277/1988031 + (ML20154L187)
- ML20154L188 + (ML20154L188)