Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-88-0066, Special Rept 88-001/0:on 880302,diesel Generator 12 Automatically Tripped on Low Lube Oil Pressure.Caused by Automatic Start Due to Lube Oil Pressure Fluctuations That May Occur During Engine Startup.Diesel Generator Tested + (ML20151A685)
- ML20151A687 + (ML20151A687)
- ML20151A688 + (ML20151A688)
- ML20151A690 + (ML20151A690)
- BECO-88-063, Supersedes 870611 Response to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. All Valves on Encl Have Been Added to Inservice Testing Program & Satisfactorily Tested + (ML20151A691)
- ML20151A693 + (ML20151A693)
- ML20151A695 + (ML20151A695)
- ML20151A699 + (ML20151A699)
- ML20151A702 + (ML20151A702)
- ML20151A704 + (ML20151A704)
- ML20151A705 + (ML20151A705)
- ST-HL-AE-2600, Requests That Encl Svc List Be Used for NRC Correspondence W/Util Re Facilities.List Replaces Previous Requests from Util for Distribution of Correspondence + (ML20151A707)
- ML20151A708 + (ML20151A708)
- W3P88-0059, Advises That Exercise Objectives Meeting Scheduled for 880523 to Discuss 881012 Emergency Exercise Objective Prior to Submittal to NRC & FEMA + (ML20151A713)
- PY-CEI-NRR-0830, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-22.Corrective Actions:Temporary Alteration Reevaluated & 10CFR50.59 Safety Evaluation Performed + (ML20151A715)
- ML20151A717 + (ML20151A717)
- ML20151A720 + (ML20151A720)
- ML20151A722 + (ML20151A722)
- ML20151A724 + (ML20151A724)
- ML20151A730 + (ML20151A730)
- ML20151A737 + (ML20151A737)
- ML20151A738 + (ML20151A738)
- ML20151A744 + (ML20151A744)
- ML20151A745 + (ML20151A745)
- IR 05000333/1988008 + (ML20151A749)
- ML20151A751 + (ML20151A751)
- ML20151A757 + (ML20151A757)
- ML20151A758 + (ML20151A758)
- PY-CEI-NRR-0835, Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) + (ML20151A766)
- ML20151A768 + (ML20151A768)
- ML20151A769 + (ML20151A769)
- ML20151A770 + (ML20151A770)
- PNO-I-88-072, on 880709,inboard MSIV Failed Full Closure Test.Subsequent Testing Indicated That Valve Stem May Be Separated from Valve Disc.Msiv Repair Estimated to Take 18 Days + (ML20151A773)
- ML20151A775 + (ML20151A775)
- ML20151A778 + (ML20151A778)
- ML20151A779 + (ML20151A779)
- ML20151A784 + (ML20151A784)
- ML20151A789 + (ML20151A789)
- ML20151A797 + (ML20151A797)
- IR 05000295/1980012 + (ML20151A798)
- ML20151A799 + (ML20151A799)
- ML20151A800 + (ML20151A800)
- ML20151A801 + (ML20151A801)
- ML20151A806 + (ML20151A806)
- PNO-I-88-039, on 880329,uninterruptable Power Supply (UPS) B Declared Out of Svc Due to Blown Fuse & Failed Circuit Cards.On 880331,valve CS-11B Declared Inoperable & Reactor Shutdown Initiated.Repairs & post-maint of UPS B Completed + (ML20151A808)
- ML20151A810 + (ML20151A810)
- ML20151A811 + (ML20151A811)
- ML20151A813 + (ML20151A813)
- ML20151A816 + (ML20151A816)
- ML20151A821 + (ML20151A821)
- IR 05000353/1988002 + (ML20151A822)